Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,04,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_84446_1Bid Award Id
ViewTender No
WRD/MID/GIRIDIH/F2-06/23-24/G3Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 mm with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I.
39191.85
4118671
105.09
E/W in excavation of foundation trenches in ordinary soil ( vide classification of soil item A ) and disposal of excavated earth so obtained to a distance of 50 m and average lift of 1.50M including levelling, ramming the foundation trenches removing the roots or shrubs etc. allcomplete job as per specification and direction of E/I (WRD S.O.R Item 7.1.27)
6.65
1005
151.23
Providing and laying in position cement concrete( P.C.C M150) of nominal mix of 1:2:4 (1 cement:2 coarse sand: (zone-III ) :4 graded stone aggregate 20 MM nominal size) exluding the cost of shuttering -all work upto plinth level.(BCD SOR 5.3.1.2)
2.8
12875
4598.23
Providing and laying in position cement concrete( P.C.C M150) of nominal mix of 1:2:4 (1 cement:2 coarse sand: (zone-III ) :4 graded stone aggregate 20 MM nominal size) in retaing walls, return walls ( any thickness) including attached pilasters, columns, piers, coping etc exluding the cost of centering and shuttering upto floor five level ( BCD SOR 5.3.2.2)
0.31
1744
5626.21
Providing rough dressed random rubble stone masonry in C.M(1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 TO 2.5 including cost of screening , racking out joints to 20 mm depth ,curing, taxes and royalty all complete job as per building specification and direction of E/I (Item No.5.2.28){SOR Part A Ch- 4 Sl.N- 4.28}
2.62
7177
2739.68
Providing rough dressed random rubble stone masonry in C.M(1:4) in Superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 TO 2.5 including cost of screening , racking out joints to 20 mm depth ,curing, taxes and royalty all complete job as per building specification and direction of E/I (Item No.5.2.31){SOR Part A Ch- 4 Sl.N- 4.31}
3.53
10261
2906.96
Providing and supplying ISI mark centrifugally cast (spun) ductile Iron pipes of 100 mm and above all diameter for water works with sockets and spigot ends confirming to IS 8329/2000 in standared working lengths of 4.5, 5.5 and 6.0 M for classification K-7 suitable for push on joints (rubber gasket D jointing) with cement mortar lining inside the pipes with outsides zinc and bituminious coating rate are ex-factory including transportation, taxes and duties contractor profit and over head charges etc. (Including cost of one No. gasket for each pipe) 1) 300MM
30
112068
3735.6
providing double flanged sluice valve confirming for IS 2906/14846 including warn gear arrengements as per test pressure stainless steel splindle/caps etc. 300mm
1
26257
26257.66
Supplying labours, tools and tackles, lubricant etc. for laying and jointing C.I. S/S tyton pipes (class LA) trenches supplying rubber gasket (Rubber gasket confirming to I.S.S.-5382-1969) and making gasket joint including providing night guard, barrier and red light to safe guard against accident, all complete (Pipe to be supplied departmentally free of cost and laying of pipes is to be done as per I.S.S. 3114-1985) as perdesign, specification and direction of E/I. 300 mm
30
3940
131.34
Supplying labour and tools for fixing C.I. sluice valve in trenches with pair of C.I. Tail piece including making laed caulked joints and flanged joint as per I.S.S. specification including supplying all jointing material (pig lead confirming to I.S.S 782-1978, yarn confirming to I.S.S. 6587- 1972 and nuts and bolt confirming to I.S.S. 1364- 1983) including drilling holes in flanges if required as per specification and direction of E/I. 300 mm
1
4614
4614.15
Providing and supplying isi standard di special and fitting ………..do………. As per EI. 300mm
100
12386
123.86
Providing 25 mm thick cement plaster (1:4)with clean coarse sand of F.M. 1.5 including screening, curing with all lead and lifts of water ,scaffolding taxes and royalty all complete job as per building specification and direction of E/I.( BCD Item No. 5.7.12)(Refer part A ch-3 item Sl.N-3.12)
12.53
3243
258.87
Proving shuttering, including strutting, proping etc. and its removal after use in foundation work as per specification and direction of E/I.( WRD 5.3.17)
9.39
3925
418.03
Proving shuttering, including strutting, proping etc. and its removal after use in superstructure components of various portion of dam work as per specification and direction of E/I.( WRD 5.3.18)
3.97
1786
449.98
Carriage of materials Cement
2.07
1180
570.4
Sand
4.21
1397
331.96
Stone Chips
2.79
1133
406.36
Stone Boulder
6.15
2577
419.11
Provision of GST @ 12%
1
551403
551403.53
Add 1% Labour Cess
1
51464
51464.33