Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,91,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Construction Of Check Dam On Ketro Toli Nala
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_85774_1Bid Award Id
ViewTender No
WRD/MID/SIMDEGA/F2-11/23-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://https://wrd.maharashtra.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Extra for wet earth all complete as per specification and direction of E/I. (Vide Item No. - 7.1.22 of WRD Part - B ,Pg No.-135)
324.81
4310
13.27
... More
Providing and laying P.C.C or R.C.C M150 with nominal mix of (1:2:4) in various components of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design and approved quality of sand of requisite F.M (2.5 to 3.0) washed and screened excluding cost of shuttering or form-work as of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibra tion, curing, royalty all taxes etc. complete job as per specification and direction of E/l. (Vide item No.- 5.3.6 of WRD Part- B, Pg No.- 109) / Item No.-5.3.1.2 of BCD Part- B , Pg No.- 106
563.47
2590964
4598.23
... More
Providing rough dressed random rubble stone masonary in CM (1:4) in foundation with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints, curing, scaffolding and its removal wherever required royalty etc. complete job as per specificition and direction of E/l. (Vide Item No.-5.4.8 of WRD Part- B, Pg No.- 111) /Vide Item No.- 5.2.28 of Common Part-A , Pg.No.-204
207.39
568182
2739.68
... More
Providing rough dressed coarse stone masosry in cm. (1:4) in superstructure with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints, curing, scaffolding and its removal wherever required royalty etc. complete job as per specificition and direction of E/l. (Vide Item No.- 5.4.11 of WRD Part- B, Pg No.- 111) / Vide Item No.- 5.2.31 of Common Part-A , Pg.No.-204
401.8
1168016
2906.96
... More
Providing and laying P.C.C. or R.C.C. M -200 with nominal mix of (1:1.5:3) in various componet of dam superstructure with approved quality of 20mm graded coarse aggregate of required graded as per design approved quality of sand of requisite F.M (2.5 to 3) washed and screened excluding cost of shuttering or form work as well of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibration, cutting, royalty all taxes etc. complete job as per specification and direction of E/l. (Vide Item No.- 5.3.11 of WRD Part- B, Pg No.- 109) / Vide Item No.-5.3.9.1 of BCD Part- B, Pg.No.-107.
42.79
223278
5218
... More
Providing shuttering, including strutting, proping etc. and its removal after use in foundation work as per specification and direction of E/I. (Vide Item No.- 5.3.17 of WRD Part- B, Pg No.- 110)
604.8
252824
418.03
... More
Providing weep hole with dry graded stone filter of 20 mm to 40 mm size in abutment and wing wall as per specification and direction of E/l.(Vide Item No. 6.7.6 of WRD Part -B, Pg No.- 131 ) / Vide Item No.- 6.7.6 of Common Part-A,Sl No.- 6.9, Pg No.-209.
40
6658
166.46
... More
Providing 25 mm thick cement plaster (1:4) with approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened including curing, scaffolding wherever required and its removal royalty and all taxes etc. complete job as per specification and direcition of E/l.(Vide Item No. 5.5.5 of WRD Part -B, Pg No.- 113) / V ide Item No.- 5.7.12 of Common Part-A, Pg No.-200
213.44
55253
258.87
... More
Supplying laying boulder in rock toe,heel trenches of the dam as per design,drawing including the cost of materials,royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direcition of E/I. (Vide Item No. 5.6.4 of WRD Part -B, Pg No.-114 ) / Vide Item No.- 5.6.4 of Common Part-A, Pg No.-209
93.18
138936
1491.06
... More
Providing T.M.T. reinforcement (tor steel) as per approved design drawing. removal of rust,cutting, bending, binding including supplying annealed wire placing rod in position all complete job as per specification and directions of E/l. (Vide Item No.- Item No.-5.3.15(i) of WRD Part- B, Pg No.- 110) /Vide Item No.- 5.5.4 of BCD Part- B, Pg.No.-119
1.63
136051
83314.02
... More
Earth work in filling foundation trenches or back filling of masonry structures with suitable earth in layers not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift 1.5m complete as per specification and direction of E/l.(Vide Item No. 6.1.16 of WRD Part -B Pg No.- 120 )
312.7
35804
114.5
... More
Dewatering by 10 HP diesel pump all complete job.(WRD Part-B, PM-29, Pg No.- 83, sl no. - 10)
50
17242
344.85
... More
Supplying of 300 mm dia. NP2 R.C.C. hume pipe with collar as per I.S.S. 458-1971(v). [WRD Part-B,Pg No.- 84, M-300 (v) ,Sl.No.-14]
9
5049
561
... More
Labour for laying,fitting and fixing 300 mm dia. NP2 hume pipe with collars in line,level and grade,as well as providing approved jointing materials and joints properly filled to make them water proof,all complete as per specification and direction of E/I.(Vide Item No. 7.6.1.3 of WRD Part-B,Pg No.-149.)
9
3257
361.9
... More
Carriage of materials from query or source to work site by mechanical means including loading unloading and stacking including contractors profit
-
-
-
... More
Cement (lead 19 KM (P) + 1 KM(K)
296.3
180031
607.6
... More
Sand (lead 9 KM (P) + 1 KM (K)
521.75
147655
283
... More
Stone Chips (lead 69 KM (P) + 1 KM(K)
543.84
639447
1175.8
... More
Boulder (lead 24 KM (P) + 1 KM (K)
702.37
367564
523.32
... More
Steel (lead 19 KM(P) + 1 KM(K)
1.63
992
607.6
... More
Hume Pipe (lead 135 KM (P) + 1 KM (K)
9
1094
121.63
... More
GST 18%
7986180.59
1437512
1
... More
Labour Cess1%
9423693.1
94236
1
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements