Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,65,500Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_96173_1Tender No
WRD/MID/GIRIDIH/F2-11/24-25/G2Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 m with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. SOR 7.1.43.2
54046.8
105
5679778.21
... More
E/W in excavation of foundation trenches in ordinary soil ( vide classification of soil item A ) and disposal of excavated earth so obtained to a distance of 50 m and average lift of 1.50M including levelling, ramming the foundation trenches removing the roots or shrubs etc. allcomplete job as per specification and direction of E/I (WRD S.O.R Item 7.1.27)
523.35
151
79146.22
... More
Providing and laying in position cement concrete( P.C.C M150) of nominal mix of 1:2:4 (1 cement:2 coarse sand: (zone-III ) :4 graded stone aggregate 20 MM nominal size) exluding the cost of shuttering -all work upto plinth level.(BCD SOR 5.3.1.2)
51.2
4598
235429.38
... More
Providing and laying in position cement concrete( P.C.C M150) of nominal mix of 1:2:4 (1 cement:2 coarse sand: (zone-III ) :4 graded stone aggregate 20 MM nominal size) in retaing walls, return walls ( any thickness) including attached pilasters, columns, piers, coping etc exluding the cost of centering and shuttering upto floor five level ( BCD SOR 5.3.2.2)
2.25
5626
12658.97
... More
Providing rough dressed random rubble stone masonry in C.M(1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 TO 2.5 including cost of screening , racking out joints to 20 mm depth ,curing, taxes and royalty all complete job as per building specification and direction of E/I (Item No.5.2.28){SOR Part A Ch- 4 Sl.N- 4.28}
59.18
2739
162134.26
... More
Providing rough dressed random rubble stone masonry in C.M(1:4) in Superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 TO 2.5 including cost of screening , racking out joints to 20 mm depth ,curing, taxes and royalty all complete job as per building specification and direction of E/I (Item No.5.2.31){SOR Part A Ch- 4 Sl.N- 4.31}
44.01
2906
127935.31
... More
Providing and supplying ISI mark centrifugally cast (spun) ductile Iron pipes of 100 mm and above all diameter for water works with sockets and spigot ends confirming to IS 8329/2000 in standared working lengths of 4.5, 5.5 and 6.0 M for classification K-7 suitable for push on joints (rubber gasket D jointing) with cement mortar lining inside the pipes with outsides zinc and bituminious coating rate are ex-factory including transportation, taxes and duties contractor profit and over head charges etc. (Including cost of one No. gasket for each pipe) 1) 300MM (common M1026) + C.P
20
3735
74712
... More
providing double flanged sluice valve confirming for IS 2906/14846 including warn gear arrengements as per test pressure stainless steel splindle/caps etc. 300mm (common M1039, PN1) + CP
1
26257
26257.66
... More
Supplying labours, tools and tackles, lubricant etc. for laying and jointing C.I. S/S tyton pipes (class LA) trenches supplying rubber gasket (Rubber gasket confirming to I.S.S.-5382-1969) and making gasket joint including providing night guard, barrier and red light to safe guard against accident, all complete (Pipe to be supplied departmentally free of cost and laying of pipes is to be done as per I.S.S. 3114-1985) as perdesign, specification and direction of E/I. 300 mm DWSD 3.1.32B
20
131
2626.8
... More
Supplying labour and tools for fixing C.I. sluice valve in trenches with pair of C.I. Tail piece including making laed caulked joints and flanged joint as per I.S.S. specification including supplying all jointing material (pig lead confirming to I.S.S 782-1978, yarn confirming to I.S.S. 6587- 1972 and nuts and bolt confirming to I.S.S. 1364- 1983) including drilling holes in flanges if required as per specification and direction of E/I. 300 mm ( DWSD 3.1.35 )
1
4614
4614.15
... More
Providing and supplying isi standard di special and fitting ………..do………. As per EI. 300mm COMMON M1027+CP
100
123
12386
... More
Providing 25 mm thick cement plaster (1:4)with clean coarse sand of F.M. 1.5 including screening, curing with all lead and lifts of water ,scaffolding taxes and royalty all complete job as per building specification and direction of E/I.( BCD Item No. 5.7.12)(Refer part A ch-3 item Sl.N-3.12)
76.69
258
19852.74
... More
Proving shuttering, including strutting, proping etc. and its removal after use in foundation work as per specification and direction of E/I.( BCD 5.3.17.1)
105.47
194
20513.92
... More
Proving shuttering, including strutting, proping etc. and its removal after use in superstructure components of various portion of dam work as per specification and direction of E/I.( BCD 5.3.17.5)
6.17
363
2245.69
... More
Providing and laying in position cement concrete( P.C.C M100) of nominal mix of 1:3:6 (1 cement : 3 coarse sand: (zone-III ) : 6 graded stone aggregate 40 MM nominal size) exluding the cost of centering and shuttering -all work upto plinth level.(BCD SOR 5.3.1.5)
27.98
4027
112679.38
... More
Earthwork in filling foundation trenches or back filling of masonary structures with suitable earth in layers not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30 M and initial lift of 1.5M complete as per specification and direction of E/I. (WRD SOR (6.1.16)
172.43
114
19743.24
... More
Supplying and laying boulders in rock toe, heel trenches of the dam as per design, drawing including the cost of materials and royalty etc. but excluding the cost of carriage all complete as per specification and direction of E/I. (ITEM NO 5.6.4)(SOR Part A Ch- 6 Sl.N 6.4)
10.13
1491
15104.44
... More
Carriage of materials:(A) Cement
40.08
523
20997.91
... More
(B) Sand
80.65
272
21972.29
... More
( C ) Stone Chips
48.09
272
13101.64
... More
(D ) Stone Metal
26.3
286
7527.59
... More
(E) Stone Boulder
113.32
279
31653.68
... More
Provision of GST @ 12%
1
868189
868189.61
... More
Add 1% Labour Cess
1
81031
81031.03
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%