Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 80,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_91254_1Bid Award Id
ViewTender No
DMFT/MID/GODDA/F2-08/24-25/G02Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing PCC M-200 in nominal mix of (1:1.5:3) in foundation and plinth with approved qality of stone chips 20mm to 6mm size graded and clean coarse of F.M 2.5 to 3 including ,mixing cement concrete in mixer and placing in position ,vibrating,striking,curing,taxes and royality all complete as per building specification and direction of E/I. 5.3.1.1
305
1513327
4961.73
Centering and shuttering including strutting,proping etc and removal of form for foundation all complete as per direction of E/I.5.3.17.1
200
38900
194.5
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6% bitumen by weight 14.18(iv)
91.5
2452
26.8
Carriage of Materials
Cement
125.61
104017
828.1
Sand
131.15
39066
297.88
Stone Chips
594.14
722545
1216.12
Stone Metal
125.8
165108
1312.47
E/W in excavation for structure as per drawing and technical specification clause 305.1 ……do………… 1/SOR ITEM NO
3.13(I)B
22.29
1243
55.8
Contstruction of dry rubble flooring at cross drainage works for relatively less important works. 2/SOR ITEM NO. 16.09
3.03
4679
1544.4
Plain/reinforced cement concrete in open foundation complete as per drawing and technical specification (PCC GRADE M-15) 3/SOR item no 12.08 A Case 1
3.03
10731
3541.9
stone masonary work in cement mortar 1:3 in foundation complete as per drawing and technical specification 4/sor item no 12.07(A)
5.46
19568
3583.9
stone masonary work in cement mortar 1:3 in Sub structure complete as per drawing and technical specification
Parapet 5/sor item no. 13.04 B
1.83
6820
3727.1
Plain/reinforced cement concrete in open Sub structure complete as per drawing and technical specification (PCC GRADE M-15) 6/sor item no
.13.05 A(p)
2.25
8428
3746.2
Providing Rcc (1:1.5:3) in deck slab ……...drawing and technical specification (PCC GRADE M-20 in Deck slab) sor item no 5.3.11
4.05
25550
6308.87
supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specification 8/sor item no 13.06
0.62
54226
87744.9
Plastering with cement mortar (1:3) on brick/stone masonary work in sub structure as per technical specification 9/sor item no 13.03
33.12
3338
100.8
Carriage of Materials
Cement + Steel
5.1
4223
828.1
Sand
7.35
2189
297.88
Stone Chips
8.4
10215
1216.12
Boulder
7.29
1970
270.31
Provision of GST @ 18%
1
598583
598583.89
Add 1% Labour Cess
1
39240
39240.5