Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Building Construction
Eprocure
Opening Date2 Dec 2024
Closing Soon23 Dec 2024
Tender Amount₹ 57,96,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
E/W in excavation in canal by the hydraulic excavator as per designed section in all kinds of soil, soil mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 mm with all lifts by tipper including construction and maintenance of haul road all complete as per specification and direction of E/I. (SOR Item 7.1.43.2)

36440.07

105

3829486.96

... More
Supplying and laying boulder in rock toe,heel trenches of the dam as per design,drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I (SOR Item 5.6.4)

145.8

1491

217396.55

... More
E/W in excavation in foundation trenches in ordinary soil ( vide classification of soil item A ) and disposal of excavated earth so obtained to a distance of 50 m soil with initial lead lift of 1.50M (WRD S.O.R Item 7.1.27)

552.74

151

83590.87

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size)-- (BCD SOR 5.3.1.5)

21.98

4027

88516.54

... More
Providing coarse clean local sand in filling in foundation trenches including ramming, watering, royalty and all other taxes complete job as per specification and direction of E/I((WRD S.O.R Corrg. Item 7.1.37)

10.98

584

6416.93

... More
Providing rough dressed random rubble stone masonry in C.M(1:4) in foundation and plinth with all cost of labour,material, royalty and taxes complete job as per specification and direction of E/I((Item No.5.2.28){SOR Part A Ch- 4 Sl.N- 4.28}

19.14

2739

52437.48

... More
Providing rough dressed random rubble stone masonry in C.M(1:4) in superstructure with all cost of labour,material, royalty and taxes complete job as per specification and direction of E/I(Item No.5.2.31) {SOR Part A Ch-4 Sl.N-4.31}

29.38

2906

85406.48

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (BCD SOR 5.3.1.2)

1.48

4598

6805.38

... More
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (BCD SOR 5.3.2.2)

1.08

5626

6076.31

... More
Centering and shuttering including strutting, proping etc. and removal of form for foundations,footings,bases of columns etc.for mass concrete (BCD SOR 5.3.17.1)

15.9

194

3092.55

... More
Centering and shuttering including strutting, proping etc. and removal of form for Lintels,Beams,Plinth beams,Girders,bressumers and Cantilevers (BCD SOR 5.3.17.5)

64.56

363

23497.9

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (BCD SOR 5.3.9.1)

11.12

5218

58024.16

... More
Providing Tor steel reinforcement of 8mm dia rods as per approved design and drawing -do-(TMT coil Fe 500) (only valid for Tata (Tiscon), SAIL, JSPL,Electrosteel Steels Ltd. Bokaro and Vizag (RINL)} (BCD SOR 5.5.4)

0.79

83314

65484.82

... More
Earthwork in filling foundation trenches or back filling of masonary structures with suitable earth in layers not exceeding 150mm thick well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30 M and initial lift of 1.5M complete as per specification and direction of E/I(SOR WRD Item No.6.1.16)

184.24

114

21095.48

... More
Providing 25 mm thick cement plaster (1:4) ….complete job as per specification and direction of E/I(Item No.5.7.12) {SOR Part A Ch-3 Sl.N -3.12}

56.4

258

14600.27

... More
Carriage of materials:(A) Cement

18.28

526

9626.25

... More
(B) Sand

48.24

366

17657.77

... More
(C ) Stone Metal

20.66

501

10356.44

... More
(D) Stone Boulder

194.32

465

90494.82

... More
( E ) Stone Chips

11.86

470

5576.57

... More
(F) M.S Rods

0.79

526

413.91

... More
Provision of GST @ 12%

1

608812

608812.44

... More
Add 1% Labour Cess

1

56822

56822.49



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.