Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 42,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Summary
Construction Of Boundary Wall And P.c.c. Approach Road(g-2)
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_93091_1Bid Award Id
ViewTender No
MID/GUMLA/F2-24/24-25(G-2)Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing designation 75 A one brick flat soling in foundation joints filled with local sand including cost of watering, taxes, royalty all complete as per building specification and direction of E/I (5.6.1.)
76.58
27302
356.52
Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials,royaltiy all taxes etc. butexcluding the cost of carriage all complete as per specification and direction of E/I. (5.6.8.)
67.5
118557
1756.4
Providing P.C.C. M-100 with nominal mix of (1:3:6) in foundation with approved quality of stone metal(50 mm to 25 mm size) graded and local river sand washed and screened excluding screening, shuttering, mixing cement concrete in mixer and placing in position , vibrating, striking, curing, taxes, and royalty all 59complete as per specification and direction of E/I (5.3.1.2.)
74.25
341418
4598.23
Providing P.C.C. M-100 with nominal mix of (1:3:6) in foundation with approved quality of stone metal(50 mm to 25 mm size) graded and local river sand washed and screened excluding screening, shuttering, mixing cement concrete in mixer and placing in position , vibrating, striking, curing, taxes, and royalty all 59complete as per specification and direction of E/I 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) (5.3.9.1..)
11.28
58859
5218
Providing Centering and shuttering including strutting, propping etc. and removed pf from for Foundations, footing, bases of columns, etc. for mass concrete. (5.3.17.1)
116.37
22633
194.5
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size) (5.3.10.)
15.48
94156
6082.45
Providing Centering and shuttering including strutting, propping etc. and removed pf from for Foundations, footing, bases of columns, etc. for mass concrete. (5.3.17.6)
42
19545
465.38
Providing Centering and shuttering including strutting, propping etc. and removed pf from for Foundations, footing, bases of columns, etc. for mass concrete. (5.3.17.5)
55.3
20127
363.97
Providing designation 100 A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9"x4.5"x3") in C.M. (1:6) in foundation and plinth with approved uality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I. (5.2.52.)
57.84
260809
4509.16
Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing: 1:1½:3 (1 cement : 1½ coarse sand (zone-III) : 3 graded stone aggregate 20 mm
nominal size). (5.3.2.1.)
4.05
24258
5989.72
Providing 12 mm thick cement plaster in C.M. (1:6) with clean coarse sand of F.M 1.5 including screening, curing with all lead and lift of water , scaffolding taxes and royality all complete as per buildig specification and direction of E/I (5.7.3 )
642.33
106498
165.8
Finishing walls with Acrylic Smooth exterior Paint of required shade New work(Two or more coats applied @1.67 ltr/10 sqm over and including priming coat of exterior primer applied @2.20 kg/10 sqm) D.S.R. (13.47.1.)
642.33
95328
148.41
Providing Tor steel reinforcement of 8, 10 mm and 12 mmmm dia bar as per approved design and drawing TMT Fe 500 (Only vaild for Tata (tiscon), Sail,JSPL, Electrosteel Steel Ltd. Bokaro and Viraz (RINL)all complete as per building specification and direction of E/I (5.5.4)
3.3
275019
83314.02
Supplying fitting and fixing M.S,grill gate with M.S.grill made of 20 x 6 mm flates or 16 mm M.S. sqare bars fitted on 25 x 25 x 6 mm M.S. angle frame of size 60*60*6mm, including cost of fabrication providing necessary locking arrangements worth haskel and domny duly fixed in C.C. (1:2:4) blocks of required size, applying a prim ing red lead paint over steel work,taxes all com.as per specification and direction E/I. (5.5.30.)
470
55920
118.98
Providing primer one coat of red lead paint of approved make over new steel surface including preparing the surface after cleaning, removing dust, dirt, scales smokes and grease and cleaning the surface thoroughly including cost of scaffolding and taxes all complete as per building specification and direction of E/I. (Mode of measurement Area shall be multiplied by the co-efficient as indicated in building specificatio). (5.8.41. + 5.8.43.)
19.63
2520
128.38
Carraige of matterials :-
-
-
-
Cement -
45.34
10448
230.45
Sand-
141.85
55585
391.86
Brick-
25.97
18421
709.29
Stone chips -
93.31
36564
391.86
Boulder -
67.5
39380
583.41
After adding GST @18% on total estimated value the total estimated amount is
1760245.58
316844
0.12
Labour Cess @1% on above total estimated amount
2077089.78
20770
0.01