Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Irrigation Work
Eprocure
Opening Date15 Oct 2024
Closing Date22 Oct 2024
Tender Amount₹ 8,01,22,850 
Notes
Download

Costs

Summary

Rooting Out And Removal Of Vegetation On Upstream Slope And Downstream Slope Of Tenughat Dam. (for 3 Years), Rearranging Disturbed Rip Rap And Depressed Patches., Closing Down The Gap In Us Parapet Wall And Providing Continuous Parapet Wall And

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Supplying and laying sand filter on slope of the dam as per design drawing including the cost of material royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(Common Part A /JH SOR 2022/Page 209/5.6.5)

2344.41

1415

-

... More
Labor charge for taking out disturbed boulder from boulder pitching or rip rap or rock toe etc. and cleaning the surface and stacking the same within the lead of 100m as per specification and direction of E/I.(WRD/JH SOR 2022/Page 153/7.7.41)

5287.02

398

-

... More
Labor charge for pitching on apron slope of bank with stone boulders duly packed (uncrated) complete job (materials within 150mm and all lifts as per specification and direction of E/I.(WRD/JH SOR 2022/Page 151/7.7.18)

5551.37

968

-

... More
Supplying and laying (properly as per design and drawing) rip- rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I(Part A /Page 209/5.6.8)

579.38

1756

-

... More
Supply of Boulders (10%CP + 4.5% OHC)(common Part A/JH SOR /Page 81 M018)

264.35

517

-

... More
E/W in dam fill by head load in semi pervious or impervious soil with initial lead of 150.00 m and initial lift including breaking clods to maximum 63mm cube placing the earth layers not exceeding 225mm thick as per specification and direction of E/I. (sectional measurement of compacted earth)(WRD Page 102/2022/5.1.19)

23982.5

285

-

... More
Extra for earthwork in all kinds of soil for each additional lift of 1.0M or Part thereof over the initial lift of 1.50m as per specification and direction of E/I.(WRD 2022/PAGE 102/5.2.21.1)( No of lifts 3.00 nos. = 5874.47 x 3.00)=

164409.76

13

-

... More
Providing randam rubble stone masonry in CM (1:4) in superstructure including cost of screening of materials scaffolding raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I.(COMMON JH SOR/ PAGE 204 /5.2.31)4.31

34.5

2906

-

... More
Removal of telephone/electric poles and lines including excavation and dismantling of foundation concrete and lines under the supervision of concerned department disposal with all lifts and upto lead of 1000 meters and stacking the serviceable material and unserviceable material separately.(Common SOR Part A/Page 199/2.14/202)

18

185

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure of comprising of masonry, cement concrete, wood of work, steel work, including T&P and scaffolding Wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.Dismantling Brick/tile work by manual means in cement mortar (Common SOR Part A/Page 196/2.04/202/i/C)

12.88

286

-

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure of comprising of masonry, cement concrete, wood of work, steel work, including T&P and scaffolding Wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres.RCC M-20 by manual means (Common SOR Part A/Page 196/2.04/202/ii/B)

5.1

1263

-

... More
Earth work in bed clearance or desilting of canals carrying F.S.discharge between 8.5 cumecs (300 cusecs) and 0.14 cumecs (5 cusecs) and renovation of pynes etc disposal of excavated earth etc. and in ordinary soil including rough dressing with initial lead of 10M and lift of 1.5M as per specification and direction of E/I. (JH SOR 2022/WRD/ Page 134/7.1.20)

25635.22

120

-

... More
Extra for wet earth all complete as per specification and direction of E/I. (JH SOR 2022/WRD/ Page 134/7.1.22)

25635.22

13

-

... More
Providing random rubble stone masonary (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening materials raking out joints to 20mm depth , curing , taxes and royalty all complete as per builiding specification and direction of E/I.(JH SOR 2022/Part A /Page 204/5.2.28)

5255.58

2739

-

... More
Providing tuck pointing in cement on stone masonary (1:3) with clean coarse sand of F.M 1.50 including screening curing with all leads and lifts of water scaffolding taxes and royalty all complete as per building specification and direction of E/I. (JH SOR 2022/Part A /Page 204/5.7.10).

13920

254

-

... More
Providing 25 mm thick cement plaster (1:4) clean coarse sand of F.M 1.50 including screening curing with all leads and lifts of water scaffolding taxes and royalty all complete as per building specification and direction of E/I. (JH SOR 2022/Part A /Page 200/5.7.12/3.12).

8818.6

258

-

... More
Providing 1.5mm cement punning including screening curing with all leads and lifts of water all complete as per building specification and direction of E/I. (JH SOR 2022/Part A /Page 204/5.7.11).

8818.6

54

-

... More
Fine dressing of the earthen embankmnet and turfing with 75mm grass sods,obtained within a lead of 150M including the cost of watering the grass surface till it requires greenness as per specification and direction of E/I. (WRD JH SOR 2022/Page 121/6.1.24.1)

3219.21

1502

-

... More
Extra for each lead of 150.00 m over initial lead of 150.00 m as per specifictaion and direction of E/I.(WRD JH SOR 2022/Page 121/6.1.24.2)(2 lead of 150.00 m each =3219.21x2 =6438.42)

6438.42

563

-

... More
Watering and consolidation of earth laid in 150mm to 225mm layers by manual labor wit C.I Hammer to achieve minimum 85% of maximum dry density including supply of water and necessary tools and plants with all leads and lifts all complete as per specification and direction of E/I.(WRD 2022/Page 137/7.1.38)

18108.04

39

-

... More
Providing two coats of Snowcem of approved shade and make over old surface including washing cleaning and preparing the walls, scaffolding , curing and taxes all complete as per building specification and direction of E/I.(JH SOR 2022/BCD/Page 132/5.8.23)

18817.74

96

-

... More
Providing two coats of synthetic enamel paint over steel surface including cleaning the surface throughly, scaffolding and taxes all complete as per building specification and direction of E/I..(JH SOR/2022/BCD/Page 134/5.8.45)

1520.64

66

-

... More
Direction and Place identification sign with size more than 0.90sqm size board (Providing and erceting direction and place identification retro reflectorised sign as per IRC 67 made of high intensity grade sheeting vide clause 801.30,fixed over sheeting with minimum thickness of 4.00mm with area exceeding 0.90 sqm fixed over black support frame . (RCD/2022/PAGE 376/8.06)

15

14393

-

... More
Carriage of Cement

963.95

530

-

... More
Carriage of Sand (Lead = 9.00km)=

4857.15

248

-

... More
Carriage of Boulder(Lead=31.00KM)

5554.43

576

-

... More
Carriage of Gravel (Lead=31.00KM)

386.25

576

-

... More
Add GST 18% of Total Amount

1

12101118

-

... More
Add Labour Cess 1% of Total Amount

1

793295

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.