Water Resources Department Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Water Resources Department - WRD Tender
Civil And Construction
Irrigation Work
Eprocure
Opening Date19 Feb 2025
Closing Date5 Mar 2025
Tender Amount₹ 4,96,521
Costs
EMD
₹ 10,000Document Cost
₹ 1,250Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_WRD_98613_1Tender No
WRD/SCD/JSR/F2-02/2024-25(2nd call)Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Earth Work in excavation of canals having discharge between 8.5 cumecs (300 cusecs) and 0.14 (5 cusecs) in ordinary soil (vide classification of soil item-A) including clod breaking , having earth in 225mm layer and rough dressing of soil with inital lead of 10 M. and lift of 1.5M. all complete as per approved design, specification and direction of E/I
17.55
120
2116.71
... More
Earth work in lip cutting in side slopes and bed of canal in ordinary soil with initial lead of 30 M and lift of 1.5 M. including the cost of formation of sub grade of canal lining,profiling , leveling controling of slope and fine dressing with disposal of excavated earth and nominal dewatering if any all complete as per approved design, specification and direction of E/I.(7.1.21 WRD PART B)
7.7
151
1163.86
... More
Providing compacted 75mm thick sand filter of required F.M. as per design on side slopes and in bed of canal with coarse sand including cost of water, ramming ,levelling and dressing etc. all complete as per specification and direction of E/I.(7.2.1.A)
59.29
144
8555.55
... More
Hessain Cloth.(0.3kg/M2 Cot.) (M-268)
59.29
38
2253.02
... More
Providing 100mm thk. PCC Lining in M-150 with nominal mix of (1:2:4) with well graded stone chips (20mm down) and coarse sand of approved quality of required FM (2.5 to 3.0) in side and bottom curved portion of the canal in panel with construction joints including cost of form work and its removal, curing, royalty and all other taxes complete job as per specification and direction of E/I. (7.2.19.1)
5.2
8289
43105.76
... More
Providing P.C.C. M-150 with nominal mix of (1:2:4) with approved quality of graded stone chips (20mm and down )and coarse granular sand of requisite F.M.(2.5 to 3.0)in lug slab cross and longitudinal sleepers for lining of canal including cost of form work and its removal, curing , royalty and all over taxes etc. all complete job as per specification and direction of E/I.(S.O.R No.- 7.3.1.1)(5.3.1.2 BCD)
4.97
4598
22853.2
... More
Providing shuttering including strutting and proping etc and its removal after use in various components of canal structure or embankment structure as per specification and direction of E/I. (7.3.19) WRD PART-B
27.87
449
12540.94
... More
Watering & consolidation of earth laid in 150mm to 225 mm layers by manual labour with CI hammer to achieve minimum 85% of maximum dry density including supply of water and necessary tools and lants with all leads and lifts all complete as per specification and direction of E/I. (7.1.38)
477.05
39
18986.59
... More
Earth work in bed clearance or desilting of canals having F.S. discharge between of 28 cumecs (1000 cusecs) and 8.5 cumecs (300 cusecs ) including rough dressing with initial lead of 10m and lift of 1.5m.as per specification and direction of E/I. (7.1.19) WRD PART-B
1523.78
120
183783.11
... More
Carriage of materials from quarry to work site at 3.840 to 3.850 of OR-23 including cost of loading, unloading and staking- Cement
3.35
657
2203.63
... More
Carriage of materials from quarry to work site at 3.840 to 3.850 of OR-23 including cost of loading, unloading and staking- Sand
9.01
602
5424.92
... More
Carriage of materials from quarry to work site at 3.840 to 3.850 of OR-23 including cost of loading, unloading and staking- Stone Chips
9.12
714
6516.97
... More
Add GST @18%
1
74990
74990.67
... More
Add Labour Cess @1%
1
4916
4916.06
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%