Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,01,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_80570_1Bid Award Id
ViewTender No
WRD/MID/LOHARDAGA/F2-21/23-24Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://https://wrd.maharashtra.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing and laying P.C.C. or R.C.C. M-150 with nominal mix of (1:2:4) in various components of dam foundation with approved quality of 20mm graded coarse aggregate of required grade as per design approved quality of sand of requisite FM (2.5 to 3) washed and screened excluding cost of shuttering or form work as of reinforcement. its cutting, bending, binding and placing but including necessary tools and plants and vibrating, curing, royalty all taxes etc. complete job as per specification and direction of E/I.(Vide Item No. 5.3.6 of WRD Part- B, pg no. 109)/ item No. 5.3.1.2 of BCD part- B, pg no. 106)
261.16
1200873
4598.23
Providing rough dressed random rubble stone masonry in cement mortar (1:4) in foundation with approved quality of coarse sand of requisite F.M. (2.5 to 3.0) washed and screened with raking out joints, curing, scaffolding and its removal wherever required including royalty and all taxes etc. complete job as per specification and direction of E/I.(Vide Item No. 5.4.8 of WRD Part- B, pg no. 111)/ Vide Item No. 5.2.28 of Common PART-A, pg no. 204)
147.76
404815
2739.68
Providing rough dressed random rubble stone masonry in CM (1:4) in superstructure with approved quality of coarse sand of requisite FM (2.5 to 3) washed and screened with raking out joints, curing, scaffolding and its removal wherever required royalty etc. complete job as per specification and direction of E/I.(Vide Item No. 5.4.11 of WRD Part- B, pg no. 111)/ Vide Item No. 5.2.31 of Common PART-A, pg no. 204)
244.24
709995
2906.96
Providing and laying P.C.C. or R.C.C. M-200 wit nominal mix (1:1.5:3) in various component of dam superstructure with approved quality of 20mm graded coarse aggregate of required as per desigen approved quality of sand of requisite F.M. (2.5 to 3) washed and screened excluding cost of shuttering or form work as well of reinforcement its cutting, bending and placing but including necessary tools and plants and vibration, cutting, royalaty all taxes etc. . complete job as per specification and direction of E/I.(Vide Item No. 5.3.11 of WRD Part- B, pg no. 109)/ Vide Item No. 5.3.9.1 of BCD PART-B, pg no. 107)
21.16
110412
5218
Providing T.M.T. reinforcement (torn steel) as per approved design drawing. Removal of rust, cutting, bending, binding including supplying annealed wire placing rod in position all complete job as per specification and direction of E/I.(Vide Item No. 5.3.15 (i) of WRD Part- B, pg no. 110)/ Vide Item No. 5.5.4 of BCD PART-B, pg no. 119)
0.69
57819
83314.02
Providing shuttering, including strutting, proping etc.and its removal after use in foundation work as per specification and direction of E/I.(vide item no.-5.3.17 of WRD PART-B, pg no-110)
418.06
174761
418.03
Supplying laying boulder in rock toe, heel trenches of the dam as per design, drawing including the cost of materials, royalty and all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.( vide item no.5.6.4 ofWRD PART-B, page no.-114)/vide item no.-5.6.4 of common part-A, page no.-209)
60.75
90581
1491.06
Providing weep holes with dry graded stone filter of 20mm to 40mm size in abutment and wing wall. As per specification and direction of E/I.( vide item no.6.7.6of WRD PART-B, pg no.-131)/vide item no.-6.7.6 of common part-A, sl no.-6.9, pg no.-209).
30
4993
166.46
Providing 25mm thick cement plaster (1:4) with approved quality of sand of requisite F.M. (2.5 to 3.0) washed and screened including curing, scaffolding wherever required and its removal royalty and all taxes etc. complete job as per specification and direction of E/I.(vide item no5.5.5 0f WRD PART-B, page no.-113)/ vide item no.-5.7.12 of common part-a, pg no-200)
225.17
58289
258.87
Earth work in filling foundation trenches or back filling of masonry structures with suitable earth in layers not exceeding 150mm thick well watered, rammed anti fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30m and initial lift of 1.5m complete as per specification and direction of E/I.( vide item no.-6.1.16 of WRD Part-B,pg no.-120)
161.42
18482
114.5
Dewatering by 10HP diesel pump all complete job(WRD part-B ,PM-29,Pg No.-83,sl no.-10)
180
62073
344.85
Carriage of materials from querry or source to work site by mechanical means including loading unloading and stacking including contractors profit.
-
-
-
(i) Cement - Lead - 16(p)+1(k) = 17KM
155.34
90050
579.7
(ii) Sand -Lead - 10(p)+1(k) = 11KM
289.87
86346
297.88
(iii) Stone Chips -Lead - 32(p)+1(k) = 33KM
253.19
158304
625.24
(iv) Boulder -Lead - 30(p)+1(k) = 31KM
440.6
271629
616.5
(v) Steel -Lead - 16(p)+1(k) = 17KM
0.69
402
579.7
GST 18%
4211064.77
757991
1
Labour Cess1%
4969056.43
49690
1