Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Water Storage And Supply
Eprocure
Opening Date6 Dec 2024
Closing Date17 Dec 2024
Tender Amount₹ 75,53,409 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position Ce ment conc. Of specified grade excluding the cost of Centuring and Shuttering - All work up to plinth level - PCC M-15 with nominal mix 1:2:4 (1 Cement : 2 Course Sand (Zone- iii) : 4 graded stone aggregate 20 mm nominal Size) all . complete job as per building specification and direction of E/I. BCD Item - 5.3.1.2, Page No. 106

335.81

4598

1544131.62

... More
Providing ramdom rubble stone masonary in c.m. (1:4) in foundation and plinth with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening , racking out joints, to 20mm,depth, curing taxes and royality all complete as per bulding specification and direction of E/I. (5.2.28) PART A PAGE 204 .

308.55

2739

845328.26

... More
Providing random rubble stone masonary in c.m. (1:4) in superstructure and with hammer dressed stone of less then 0.03 m3 in volume and clean coarse sand of F.M.2.to 2.5 including cost of screening of materials,Scaffolding, racking out joints, to 20mm,depth, curing texas and royality all complete as per bulding specification and direction of E/I (5.2.31) PART A PAGE 204 .

376.29

2906

1093859.98

... More
Providing and laying in position Cement conc. in Retaing wall, return wall, wlls(any thickness) including attached pillasters, columns, piers abut. , pillars, posts, struts, buttress, string or lacing course,parapets, coping, bed blocks, anchor blocks, plain window sills, ... excluding the cost of Centuring and Shuttering and fishing :PCC M-15 with nominal mix 1:2:4 (1 Cement : 2 Course Sand (Zone- iii) : 4 graded stone aggregate 20 mm nominal Size) all . complete job as per building specification and direction of E/I. BCD Item - 5.3.2.2, Page No. 106

10.03

5626

56430.89

... More
Providing centering and shuttering including strutting propping etc .removal of form for foundation work as per specification and direction of E/I (5.3.17.1) .

380.78

194

74061.71

... More
Centuring and shuttering including strutting, proping etc. and removal of form from lintels, beams, and coloumns, plinth beams, girders etc as per specification and direction of E/I. BCD. Item 5.3.17.5 , Pg - 108

76.62

363

27887.38

... More
Providing and laying in position Cement conc. Of specified grade excluding the cost of Centuring, Shuttering, finishing and reinforcement - All work up to plinth level - RCC M-20 with nominal mix 1:1.5:3 (1 Cement : 1.5 Course Sand (Zone- iii) : 3 graded stone aggregate 20 mm nominal Size) all . complete job as per building specification and direction of E/I. BCD Item - 5.3.9.1, Page No. 107

32.59

5218

170054.62

... More
Prov. Tor Steel reinforcement of 10 mm, 12mm & 16 mm. Dia bars as par approved design and drawin....do..do. (a) 10 mm (TMT coil Fe 500 (Only valid for Tata (Tiscon), Sail, JSPL, Electro steels Ltd. Bokaro and Vijag (RINL), BCD. (5.5.5), Page-119

1.96

82096

160909.22

... More
Providing weep holes with dry graded stone filter of 20 mm to 40 mm size in abutment and wing wall as per specification and direction of E/I. P-A, Item No. 6.7.6, PAGE-209.

60

166

9987.6

... More
Providing 25 mm cement plaster (1:4) with clean coarse sand of F.M. 1.5 including screening ,curing,with all leads and lifts of water scaffolding taxes and royalty all . complete job as per building specification and direction of E/I. ( 5.7.12) PART A PAGE 200

301.94

258

78163.21

... More
Provision of dewatering with 10 H.P diesel pump set including P.O.L part-B WRD PAGE 83 SL.NO 10

200

330

66000

... More
Supplying & laying boulder in rock toe, heel trenches of the dam as per design & drawing including the cost of materials, royalty and all taxes etc. But excluding the cost of carriages all complete as per specification and direction of E/I. ( 5.6.4) PART A PAGE 209.

52.78

1491

78698.15

... More
Providing 1.5 mm thick cement punning including curing carriage of water with leads and lift as per bulding specification and direction of E/I. (5:7:11) PART A Page-200

69.8

54

3799.21

... More
Earth work in filling in foundation treanches and back filling of masonry structures with suitable earth in layers not exceeding 150 mm thick well watered,rammed and fully compacted and finally dressed with earth obtained from excavation of foundation treanch and kept at a lead of 30m and initial lift of 1.5 m complete as per specification and direction of E/I (6.1.16) WRD PAGE 120

338.32

114

38737.64

... More
Carriage of materials Cement + Steel

234.19

842

197375.33

452.6

287

130041.03

... More
Stone Chips

339.24

1139

386665.75

... More
Stone Boulder

737.62

1184

873806.78

... More
Provision of GST @ 18%

1

1140806

1140806.97

... More
Add 1% Labour Cess

1

74786

74786.23



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.