Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,92,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Construction Of Single Checkdam On Potpoto Nala
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_96797_1Tender No
WRD/MID/RANCHI/F2-4/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Providing and laying P.C.C./R.C.C. M-150 with nominal mix of (1:2:4) in various component of barrage foundation with approved quality of 20mm graded eoarde aggregate of required graded as per disign approved quality of sand of requisite F.M (2.5 to 3) washed and screened excluding cost of shuttening or form work as well of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibration, cutting, royalty all taxes etc. complete job as per specification and direction of E/l.(WSOR Item No.-5.3.6 pg-109) & (BCD) 5.3.1.2 pg-106
525.16
4598
2414806.47
... More
Providing rough dressed random rubble stone masonary in CM (1:4) in foundation with approved quality of coarse sasd of requisite F.M (2.5 to 3) washed and screened with raking out joints, curing, scaffolding and its removal wherever required royalty etc. complete job as per specificition and direction of E/l.(WSOR Part-B Item No.-5.4.8 pg-111) &(Part -A, 5.2.28 pg-204)
238.74
2739
654071.2
... More
Providing rough dressed coarse stone masosry in cm. (1:4) in superstructure with approved quality of coarse sand of requisite F.M (2.5 to 3) washed and screened with raking out joints, curing, scaffolding and its removal wherever required royalty etc. complete job as per specificition and direction of E/l.(WSOR Part-B Item No.-5.4.11 pg-111) & ( Part -A) 5.2.31 pg-204
485.95
2906
1412637.21
... More
Providing and laying P.C.C. or R.C.C. M -200 with nominal mix of (1:1½:3) in various componet of dam superstructure with approved quality of 20mm graded coarse aggregate of required graded as per design approved quality of sand of requisite F.M (2.5 to 3) washed and screened excluding cost of shuttering or form work as well of reinforcement its cutting, bending, binding and placing but including necessary tools and plants and vibration, cutting, royalty all taxes etc. complete job as per specification and direction of E/l.(WSOR Part-B Item No.-5.3.11 pg-109)& (BCD SOR) 5.3.9.1 pg-107
89.36
5218
466280.48
... More
Providing TMT reinforcement(Tor steel) as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire removal of rust, placing rods in position (including carriage of bars to work site) all complete job as per building specification and directions of E/l. TMT Fe 500 {only valid for TATA(Tiscon), SAIL, JSPL, Electrosteel steels Ltd. Bokaro and Vizag(RINL)}(Vide item no. 5.5.4 of BCD Part B PGNo.119
3.29
83314
273769.87
... More
Providing shuttering including strutting, propping, etc. and its removal after use in foundation as per specification and direction of E/I.(WSOR Part-B 5.3.17 pg-110)
685.36
418
286501.04
... More
Supplying and laying boulder in rock toe, heel trenches of the dam as per design, drawing including the cost of materials royalty etc. but excluding the cost of carriage all complete as per specification and direction of E/I.(WSOR Part-B pg-114 Item No.-5.6.4)/PART-A 5.6.4 pg-209
88.07
1491
131317.65
... More
Providing 25 mm thick cement plaster (1:4) in cement mortar with approved quality of sand of requisite F.M. (2.5 to 3) washed and screened including curing, scaffolding wherever required and its removal royalty and all taxes etc. all complete job as per specification and direcition of E/l.(WSOR Part-B Item No.-5.5.5 pg-113)&( Part -A 5.7.12 pg-200)
307.06
258
79488.62
... More
Providing weep hole with dry graded stone filter of 20mm to 40mm size in abutment and wing wall as per specificatin and direction of E/I.(WSOR Part-B Item No.-6.7.6)&( Part -A, Slno-6.9 Pg. No.- 209)
30
166
4993.8
... More
Supplying of 300mm DiaNP2 RCC hume pipe with collars as per I.S.S 458-1971 ( WRD PART B PAGE NO 84 M300 SL no 14
10
586
5862.5
... More
Labour for laying, fitting and fixing NP2 Hume pipe with collars in line, level and grade as well as providing approved jointing materials and joint properly filled to make them water proof all complete job as per specification and direction of E/I (300mm dia) (v) 300mm dia. (WSOR, Part -B, Pg. No.- 149, Item No.-7.6.1.3)
10
361
3619
... More
Earth work in filling foundation trenches or back filling of masonary structures with suitable earth in layers not exceeding 150 mm thick, well watered, rammed and fully compacted and finally dressed with earth obtained from excavation of foundation trenches and kept at a lead of 30 m and intial lift of 1.5 m compelet as per specification and direction of E/I.(WSOR Part-B pg-120 Item No-6.1.16)
315.11
114
36080.1
... More
Supplying of diesel pump per 10 H.P. per hour for dewatering during the construction of weir as per specification and direction of E/I.(WSOR, Part -B, Pg. No.- 83, PM-29 Sl.No.-10)
70
344
24139.5
... More
Carriage of materials
-
-
-
... More
(i) Cement – (20Km (S.R)+1Km (K))
321.18
616
198135.94
... More
(ii) Sand – (20Km (S.R)+1Km (K))
573.38
446
256117.38
... More
(iii) Stone Chips – (30Km (S.R)+1Km (K))
549.32
595
327109.07
... More
(iv) Boulder – (30Km (S.R)+1Km (K))
812.76
616
501066.54
... More
(v) NP2 R.C.C. Hume Pipe of 300 mm dia. (20Km (S.R)+1Km (K))
10
59
598.5
... More
After adding GST @18% on total estimated value the total estimated amount is
8014953.3
-
1442691.59
... More
Labour Cess @1% on above total estimated amount
9457644.9
-
94576.45
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements
Past BiddersThis list is curated from the bidders of the similar tenders in the past
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
- Awarded Ratexx%
- Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user