Water Resources Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Water Resources Department - WRD Tender

Works
Civil And Construction
Eprocure
Opening Date12 Jun 2024
Closing Date22 Jun 2024
Tender Amount₹ 47,95,516 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) (5.1.7 of BCD)

263.73

14578

55.28

... More
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns etc. for mass concrete. (5.1.17.1 of BCD)

232.34

45190

194.5

... More
Providing coarse clean sand filling in foundation trenches or in plinth i/c ramming and watering in layer not exceeding 150 mm thick with all leads and lifts i/c cost of all materials,labours,royalty and taxes all complete as per building specification and direction of E/I.(Mode of measurement compacted volume) (5.1.10 of BCD)

8.26

4869

589.51

... More
Supplying laying bouldes in rock toe heel trenches of the dam as per design , drawing including the cost of materials royalty and all taxes etc but excluding the cost of carriage all complete as per specification and direction of E/i. (5.6.4 of WRD)

12.39

18474

1491.06

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2 of BCD)

18.88

86814

4598.23

... More
Providing randam rubble stone masonry in CM (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. (5.2.28 of BCD)

44.29

121340

2739.68

... More
Providing randam rubble stone masonry in CM (1:4) in superstructure including cost of screening of materials scaffolding raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. (5.2.31 of BCD)

65.76

191161

2906.96

... More
Providing weep holes with dry grade stone filter of 20mm to 40mm size in abutment and wing wall as per specification and direction of E/I (6.7.6 of WRD)

24

3995

166.46

... More
Carriage of materials (i) Cement

197.07

108211

549.1

... More
(ii) Sand

243.05

65166

268.12

... More
(iii) Stone Chips

806.31

336166

416.92

... More
(iv) Stone Boulder

122.44

60271

492.25

... More
Add GST 18% of Total Amount

1

724276

724276.72

... More
Add Labour Cess 1% of Total Amount

1

47480

47480.36



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.