Water Resources Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 96,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_WRD_86274_1Bid Award Id
ViewTender No
WRD/TDDivisionTenughat/ IFB-01/2024-25Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume) (5.1.7 of BCD)
263.73
14578
55.28
Centering and shuttering including strutting, propping etc. and removal of form work for : Foundations, footings, bases for columns etc. for mass concrete. (5.1.17.1 of BCD)
232.34
45190
194.5
Providing coarse clean sand filling in foundation trenches or in plinth i/c ramming and watering in layer not exceeding 150 mm thick with all leads and lifts i/c cost of all materials,labours,royalty and taxes all complete as per building specification and direction of E/I.(Mode of measurement compacted volume) (5.1.10 of BCD)
8.26
4869
589.51
Supplying laying bouldes in rock toe heel trenches of the dam as per design , drawing including the cost of materials royalty and all taxes etc but excluding the cost of carriage all complete as per specification and direction of E/i. (5.6.4 of WRD)
12.39
18474
1491.06
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) (5.3.1.2 of BCD)
18.88
86814
4598.23
Providing randam rubble stone masonry in CM (1:4) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M. 2 to 2.5 including cost of screening raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. (5.2.28 of BCD)
44.29
121340
2739.68
Providing randam rubble stone masonry in CM (1:4) in superstructure including cost of screening of materials scaffolding raking out joints to 20 mm depth, curing taxes and royalty all complete as per building specification and direction of E/I. (5.2.31 of BCD)
65.76
191161
2906.96
Providing weep holes with dry grade stone filter of 20mm to 40mm size in abutment and wing wall as per specification and direction of E/I (6.7.6 of WRD)
24
3995
166.46
Carriage of materials
(i) Cement
197.07
108211
549.1
(ii) Sand
243.05
65166
268.12
(iii) Stone Chips
806.31
336166
416.92
(iv) Stone Boulder
122.44
60271
492.25
Add GST 18% of Total Amount
1
724276
724276.72
Add Labour Cess 1% of Total Amount
1
47480
47480.36
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements