Water Resources Department Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 63,000Document Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2019_WRD_43483_1Bid Award Id
ViewTender No
WRD/MID/GODDA/F2-03/19-20/S3Tender Authority
Water Resources Department ViewPurchaser Address
-Website
http://http://wrdjharkhand.nic.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Earth work in excavation in canals by the hydraulic excavator as per designed section in all kinds of soil, mixed with kankar, pebbles and boulders upto 300 mm size and disposal of spoil upto 500 m with all lifts by tipper including costruction and maintenance of haul road all with excavated earth in proper profile and clod breaking and layering earth in 225mm layers all complete as per Specification and direction of E/I. 7.1.43.2
13251.75
2279301
172
... More
Dewatering by 5 H. P. Diesel Pump set - do - do- all complete as per direction of E/I . Page no 44
100
21725
217.25
... More
Providing and laying P.C.C or R.C.C M - 150 with nominal mix ( 1:2:4) in various components of dam Super stracture with approved quantity of graded coarse aggregate as per design and approved quantity of sand all taxes etc. complete job as per specification and direction of E/I. 5.3.10
3.72
18261
4909
... More
Providing rough dressed ramdam rubble stone masonary in c.m. (1:4) in foundation with approved quality of coarse sand of requsite F.M . Washed and screened with racking out joints, curing as per specification and direction of E/I. 5.4.8
6.8
15497
2279
... More
Providing rough dressed ramdam rubble stone masonary in c.m. (1:4) in superstructure with approved quality of coarse sand of requisite F.M(2.5 to 3.0) washed and screened with racking out joints, curing etc. complete job as per specification and direction of E/I. 5.4.11
5.27
12674
2405
... More
Providing 25 mm cement plaster (1:4) with approved quality of sand of requisite F.M. washed and screened including where ever required and it's removal, royalty and all taxes etc. complete job as per specification and direction of E/I. 5.5.58
17.73
4060
229
... More
Laying, fitting and fixing NP2 hume pipe 300mm dia in line level and graded as well as providing approved jointing materials and joint -do-do- all complete as per specification and direction of E/I
10
2830
283
... More
Earthwork in filling foundation trenches or backfilling of masonry structures with suitable earth in layers -do-do- all complete as per specification and direction of E/I
23.98
2086
87
... More
Supplying NP2 hume pipe dia -do-do- all complete as per specification and direction of E/I.
10
7657
765.7
... More
Supplying & laying boulder in rock toe, heel trenches of the dam as per design & drawing including the cost of materials, royalty and all taxes etc. But excluding the cost of carriages all complete as per specification and direction of E/I. 5.6.4
16.2
16167
998
... More
Carriage of materials Cemant
3.13
665
212.64
... More
Sand
7.03
2922
415.78
... More
Stone Chips
3.35
4447
1327.62
... More
Boulder
28.27
14468
511.79
... More
NP2 Hume Pipe 300 mm dia
10
283
28.35
... More
Provision of GST @ 12%
1
325285
325285.7
... More
Add 1% Labour Cess
1
30359
30359.99
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements