Urban Development Department Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 56,000Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UDD_97903_1Tender No
UDD/SNP/27/2024-25Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Lead beyond 1/2km but upto 1km
505.88
188
95413.08
... More
Providing coarse clean sand in filling in foundation trenchers ................................................ Of E/l
0.12
589
71.33
... More
Earth work in cut off trenches ................................................ Of E/l
32.4
107
3479.76
... More
Filling in foundation trenches ......................................................... Of E/l.
58.5
128
7539.48
... More
filling available excavated earth (excluding rock in ................................... ramming and watering lead.
0.46
55
25.43
... More
XLPE indulated pvc sheathed heavy duty ....................................... upto and including
1100 volts. 2c x 10sqm
20
138
2760
... More
Dolphin/Other FRP Dustbin
4
5100
20400
... More
Stone Chips Lead 22 Km From store yard
16.2
519
8410.39
... More
Lead beyond 1km but upto 2km
708.23
206
146361.78
... More
Supplying & laying 300mm thick humous laying .................................................. Of E/l.
2.3
13050
30015.41
... More
Extra for wet earth all complete as per specification and direction of E/I.
4047
13
53703.69
... More
Providing & fixing on wall face .............................................................. 75mm dia for weep hole
180
203
36542.34
... More
Centring and shuttering including strutting propping etc and removal of form for
3.96
194
770.22
... More
Trimming & dressing .............................. E/l.
6.9
3904
26942.91
... More
16Watt LED solar street fight with all accessories
all complete
4
7200
28800
... More
1:2:4 (1 cement:2 coarse sand (zone-III): 4 stone aggregate 20mm norminal size)
36
5626
202543.56
... More
Providing and laying factory made chamfared edge ......................................... Engineer-in-charge
138.91
824
114489.62
... More
Preparation of beds for hedging and shrubbery ....................................................... Up to 1.5m complete
12
193
2321.76
... More
Supplying & laying boulder in rock toe .................................................. Of E/l.
45
1756
79038
... More
Earth work in excavation ................................................ Of E/l
13.5
151
2049.57
... More
Wiring for circuit/ submain wiring along with earth ......................................... conduit as required
40
147
5880
... More
E/W in flood embackment ................................................ Of E/I. Lead beyond 150m but upto 500m
505.88
173
87814.84
... More
Extra for pre finished nosing to treads of steps of Kota stone/sand stone slab
164
20
3375.12
... More
Providing and stacking of Polyalthia .............................. Officer-in-charge
6
89
535.02
... More
Providing and fixing of Tuflex Garden ..................................................... in-charge
135.65
204
27672.6
... More
Supplying & laying sand filter blanketing .................................................... Of E/l.
18
1415
25473.06
... More
1:2:4 (1 cement:2 coarse sand (zone-III): 4 stone aggregate 20mm norminal size)
0.44
4598
2023.22
... More
Supply and stacking of Delonix regia (Gulmohar) plant .................................... Officer-in-charge
8
53
428.56
... More
Sand lead 20 km from storage yard
15.48
604
9359.21
... More
Providing coarse clean sand in filling in foundation trenchers ................................................ Of E/l
10.42
589
6142.1
... More
2c x 6sqm
20
121
2420
... More
Lead beyond 2km but upto 3km
303.53
225
68356.87
... More
Carriage of materials including loading unloading …..E/I. Cement lead 8 km from local market
4.81
487
2346.8
... More
Stone Boulders 15 Km from storage yard
45
612
27561.15
... More
Complete maintenance of the entire garden ..................................................... Open spaces
20
1
32
... More
5 YEAR O & M WITH 18% GST(OPEX)
1
513385
513385.22
... More
RCC Bench (3 Seater)
4
12450
49800
... More
Providing coarse sand in filling .............................................................. Of E/l
6.72
589
3961.51
... More
Earth work in lip cutting in side slopes and bed ............................................ of E/l.
2023.5
151
305852.03
... More
Supply and stacking of Nauclea cadamba (Kadam) plant .................................... Officer-in-charge
6
58
348.3
... More
Clearing of jungle including ................................................ Area cleared.
2266.4
14
32522.84
... More
Earth work in excavation ................................................ Of E/l
175.5
151
26644.41
... More
Steel circular hollow pole of standard ................................. above deck level
4
5839
23356
... More
GST
1
338974
338974.82
... More
Labour for rolling & compacting the earth ............................................. Of E/l
207
25
5330.25
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements