Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 44,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of Pcc Road And Drain With Slab In Vidya Nagar Under Ward No-40
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UDD_99983_6Bid Award Id
ViewTender No
27/eng 2025Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Stone crusher dust finer than 3mm with not more than 10% passing of 0.075 sieve at quarry. Basic rate =300 add 15.95%(CP+O.H+W.C)=347.85
60.5
347
21044.93
... More
Supplyig and laying(properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials,royality all taxes etc but excluding the cost of carriage,all complete as per specification and direction of E/I
101.62
1756
178485.37
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level:1:1.5:3(1 cement:1.5 coarse sand (zoneIII):3 graded stone aggregate (20mm nominal size)).
99.05
4961
491459.36
... More
Reinforced cement concrete work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts etc above plinth level upto floor five level,excluding cost of centering,shuttering,finishing and reinforcement 1:1.5:3 (1 cement:1.5 coarse sand(zone-III):3graded stone aggregate 20 mm nominal size)
40.8
6082
248163.96
... More
Reinforced cement concrete work in beam suspended floor,roof having slope upto 15 degree landings,balconies,shelves,chajjas,lintel,band,pain window sills,staircases and spiral stair case above plinth level upto floor five level,excluding the cost of centering,shuttering,finishing and reinforcement with 1:1.5:3 (1 cement:1.5 coarse sand(zone-III):3graded stone aggregate 20 mm nominal size)
21.93
6308
138353.52
... More
Providing Tor steel reinforced of 8mm bar 10 mm bar as per approved design and drawing excluding carriage of rods (straight or in coils)to work site,cutting,bending and binding with annealed wire with cost of wire,removal of rust,placing the rods in position all complete as per building specification and direction of E/I.
8mm dia bar (40%)
2.12
83314
176625.72
... More
10 mm dia bar (60%)
3.19
82096
261887.96
... More
Centering and shuttering includig struting,propping etc and removal of form for foundation,footing,bases of columns,etc for mass concrete
435.71
194
84744.62
... More
Sand(lead upto 47 km)
69.56
744
51798.55
... More
Stone dust(15km)
60.5
342
20745.45
... More
Stone boulders(29km)
101.62
570
58018.92
... More
Stone chip(15km)
139.13
342
47707.68
... More
Earth(1km)
242.39
117
28490.52
... More
Good & Service Tax (GST)
1844979.91
-
332096.38
... More
Labour Cess
2177076.29
-
21770.76