The JUIDCO has issued a formal invitation for competitive bids for the Urban Development Department project, for Construction Of 300mm Np2 Drain From Beni Mahato To Hydt In Ward No. 10 Under Amc in Saraikela Kharsawan, Jharkhand, with an estimated contract value of Rs. 5,74,773. The bid opening date for this tender is 06-03-2025 and the last date for bid submission is 12-03-2025. Interested bidders for Urban Development Department tender can download the important documents here to check the scope of work, eligibility criteria and technical requirements.
Urban Development Department - JUIDCO Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date6 Mar 2025
Closing Date12 Mar 2025
Tender Amount₹ 5,74,773
Costs
EMD
₹ 11,500Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_UDD_99208_6Bid Award Id
ViewTender No
UDD/AMC/11/2024-25 2ND CALLTender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Providing precast rcc slab of m - 20 with nominal mix (1:1.5:3) on prepared chamber ......... do ........ do ...........E/I. [5.3.4]
3.14
5247
16456.6
... More
Add 18% GST
1
84151
84151.2
... More
Add for Signboard and photography
1
8000
8000
... More
Providing TMT reinforcement bar ......... do ........ do ...........E/I.
-
-
-
... More
Providing labour for fitting and fixing 300 mm dia NP2 RCC Hume pipe …..do…do…direction of E/I.[3.3.6.4]
153
361
55370.7
... More
Cement 5 K,(P)
4.49
456
2049.51
... More
Sand 1Km(K) + 5Km(P)
20.42
357
7299.75
... More
Providing 1.5 mm cement punning ......... do ........ do ...........E/I. [5.7.11]
78.43
54
4268.94
... More
Earthwork in back filling the trench after laying different types and sizes of R.C.C. spun pipes …do..do..E/I.[3.3.2]
47.32
93
4444.77
... More
Plastering of 12 mm thickness with c.m [1:6] ......... do ........ do ...........E/I. [5.7.3]
78.43
165
13003.16
... More
Providing course clean sand in filling in foundation tranches or in plinth including ramming and watering in layer not exceeding 150 mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building a specification and direction of E/I.[5.1.10]
8.76
589
5165.84
... More
Bricks 1Km(K) + 7 Km(K)
10954
1
19552.89
... More
Providing designation 75B one brick on flat soling joints filled with local sand including cost of watering taxes royality all complete as per buinidng specifiacation and direction of E/I.[5.6.3]
116.76
330
38570.5
... More
Supplying 300 mm dia NP2 RCC Hume pipe with collar …..do…do…direction of E/I.
153
586
89734.5
... More
Carriage of Materials
-
-
-
... More
Disposal of excavated earth in borrow area of lead 1km(k) +2km(p)
69.91
166
11609.56
... More
10mm dia bar
0.13
82096
10281.77
... More
making connection of drain or sewer line with existing manhole including breaking into and making good the walls, floors with cement concrete for pipes 100 to 250mm dia do……………do………as per direction of E/I.[dsr-19.21.2]
50
660
33008
... More
Providing and laying PCC M-20 with nominal mix (1:1.5:3)in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :[5.3.1.1]
3.14
5218
16363.65
... More
Adding Labour Cess @ 1%
1
5516
5516.58
... More
12MM DIA Main bar
0.18
80879
14540.44
... More
300mm dia hume pipe 5 Km(P)
153
89
13678.2
... More
Reinforcement bar 5 Km(P)
0.31
456
139.12