Urban Development Department Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date4 Apr 2025
Closing Date12 Apr 2025
Tender Amount₹ 21,98,847 
Notes
Download

Costs

Summary

Construction Of Pcc Road And Drain With Slab In Vidya Nagar Under Ward No-40

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Stone crusher dust finer than 3mm with not more than 10% passing of 0.075 sieve at quarry. Basic rate =300 add 15.95%(CP+O.H+W.C)=347.85

60.5

347

21044.93

... More
Supplyig and laying(properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials,royality all taxes etc but excluding the cost of carriage,all complete as per specification and direction of E/I

101.62

1756

178485.37

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering-All work upto plinth level:1:1.5:3(1 cement:1.5 coarse sand (zoneIII):3 graded stone aggregate (20mm nominal size)).

99.05

4961

491459.36

... More
Reinforced cement concrete work in wall(any thickness),including attached pilasters,buttresses,plinth and string courses,fillets,columns,pillars,piers,abutments,posts and struts etc above plinth level upto floor five level,excluding cost of centering,shuttering,finishing and reinforcement 1:1.5:3 (1 cement:1.5 coarse sand(zone-III):3graded stone aggregate 20 mm nominal size)

40.8

6082

248163.96

... More
Reinforced cement concrete work in beam suspended floor,roof having slope upto 15 degree landings,balconies,shelves,chajjas,lintel,band,pain window sills,staircases and spiral stair case above plinth level upto floor five level,excluding the cost of centering,shuttering,finishing and reinforcement with 1:1.5:3 (1 cement:1.5 coarse sand(zone-III):3graded stone aggregate 20 mm nominal size)

21.93

6308

138353.52

... More
Providing Tor steel reinforced of 8mm bar 10 mm bar as per approved design and drawing excluding carriage of rods (straight or in coils)to work site,cutting,bending and binding with annealed wire with cost of wire,removal of rust,placing the rods in position all complete as per building specification and direction of E/I. 8mm dia bar (40%)

2.12

83314

176625.72

... More
10 mm dia bar (60%)

3.19

82096

261887.96

... More
Centering and shuttering includig struting,propping etc and removal of form for foundation,footing,bases of columns,etc for mass concrete

435.71

194

84744.62

... More
Sand(lead upto 47 km)

69.56

744

51798.55

... More
Stone dust(15km)

60.5

342

20745.45

... More
Stone boulders(29km)

101.62

570

58018.92

... More
Stone chip(15km)

139.13

342

47707.68

... More
Earth(1km)

242.39

117

28490.52

... More
Good & Service Tax (GST)

1844979.91

-

332096.38

... More
Labour Cess

2177076.29

-

21770.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.