Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date15 Jan 2025
Closing Date20 Jan 2025
Tender Amount₹ 15,73,950 
Notes
Download

Costs

Summary

Construction Of Rcc Drain In Central Ashoka, Ashok Kunj From House No-c-06 (amansneh) To D.n. Prasad Jee House Under Ward No-26

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M. including all lifts, levelling, ramming the foundation trenches removing roots of trees, shrubs all complete as per approved design, building specification and direction of E/I. Extra for earthwork in hard soil as per specification & direction of E/I.(vide classification of soil item-B)

129.75

167

21711.07

... More
Stone cushger dust finer than 3mm with not more than 10% passing of 0.075 sieve at quary. Basic rate =300.00 add 15.95% (CP+O.H+W.C ) =347.85

12.82

347

4459.44

... More
Supplying and laying (properly as per design and drawing )rip-rap with good quality of boulders duly packed including the cost of materials,royalty all taxes etc.but excluding the cost of carriage, all complete as per specification and direction of E/I.

16.79

1756

29489.96

... More
Reinforced cement concrete work in walls(any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement: 1:1.5:3(1 cement : 1-5 coarse sand (Zone-III) : 3 graded stone aggregate 20 mm nominal size)

58.36

6082

354971.78

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15 landings, balconies, shelves, chajjas, lintels, band, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement: with 1.1.5.3

26.39

6308

166491.08

... More
Providing Tor steel reinforcement of 8mm bar 10mm,bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I. (i) 8mm dia bar 38%

2.75

83314

229113.56

... More
10mm dia bar 62%

4.13

82096

339058.71

... More
Centering and shuttering including strutting, propping etc. and removal of form for Foundation, footing, bases of columns, etc for mass concrete

338.42

194

65822.69

... More
Sand with lead of 47 km

36.45

819

29854.74

... More
Sand dust lead 20 km

12.82

417

5349.79

... More
Stone Boulder with lead of 34 km

4.3

755

3247.36

... More
Stone chips with lead of 20 km

72.9

417

30421.17

... More
Earth (lead 01 KM)

129.74

117

15249.64

... More
Good & Service Tax (GST)

1320649.19

-

237716.85

... More
Labour Cess

1558366.05

-

15583.66



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.