Urban Development Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 30,600Document Cost
₹ 5,900Tender Fee
Refer Documents
Summary
Construction Of Rcc Drain At Meery Amrit Bagh Nayatoli From Promila Lakra House To Alkaan Tigga House Under Ward No- 16
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_UDD_88912_17Tender No
195/ENGTender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of all materials ,labour, royalty and taxes all complete as per building specification and direction of E/I.
10.62
6260
589.51
Supplying and laying (properly as per design and drawing ) rip-rap with good quality of boulders duty packed including the cost of materials royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.
17.84
31334
1756.4
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shutering All work upto pilith level.1:1.5.3(1 Cement:1.5 coarse sand(zone iii):3graded stone Aggregate 20mm nomial size.
8.5
42192
4963.87
Providing RCC-M200 with nominal mix of (1:1.5:3) in foundation and plinth with approved quality of stone --do--all complete as per drawing and Technical specification.
55.23
335933
6082.45
Providing precast R.C.C. M-200 with nominal mix of (1:1.5:3) in slab of desired size with approved quality of stone chips and clean coarse sand of F.M. 2.5 to 3 including cost of curing ,shuttering ,carrying the slab manually to site and laying in position all complete (but excluding the cost of reinforcement )taxes and royalty all complete as per building specifications and direction of E/I.
21.24
134000
6308.87
Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.
2.43
202453
83314.02
Providing Tor steel reinforcement of 8mm,10mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of wire ,removal of rust ,placing the rods in position all complete as per building specification and direction of E/I.
2.43
199494
82096.54
Providing Tor steel reinforcement of 10mm,16mm dia bars 20% as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site ,cutting bending and binding with annealed wire with cost of wire ,removal of rust ,placing the rods in position all complete as per building specification and direction of E/I.
1.22
98669
80876.54
Centering and Shuttering including struting,propping etc and removal of from for Foundation, footing s bases of Coloumns etc for mass Concrete.
586
113977
194.5
Sand (Lead 49 KM)
36.54
31015
848.82
Sand Local / Dust(Lead 13 KM)
10.62
3325
313.14
Stone Chips (Lead 22 KM)
73.07
32666
447.06
BOULDER-LEAD-( 36 KM )
17.84
12125
679.66
Earth (Lead 01 KM)
134.24
15778
117.54
Good & Service Tax (GST)
1282876.21
230917
0.18
Labour Cess
1513793.93
15137
0.01