Urban Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date28 Dec 2022
Closing Date6 Jan 2023
Tender Amount₹ 10,74,615 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing designation 75A one Brick flat soling joints filled with local sand incuding cost of Watering Royality and Taxes all complete as per Builiding Specification and direction of E/I.................................

116.17

-

356.52

... More
providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto pilinth level 1:2:4 (1 cement : 2 coarse sand (zone- III) : 4 graded stone aggregate 20 mm nominal size)

8.85

-

4598.23

... More
providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto pilinth level 1:2:4 (1 cement : 2 coarse sand (zone- III) : 4 graded stone aggregate 20 mm nominal size)

17.7

-

5218

... More
Reinforced cement concrete works in wall (any thickness, including attached plasters, buttresses, pilinth course, fillets, columns, pillars, piers, abutments, posts and struts etc. above pilinth level upto floor five level, excluding cost of centring, shuttering, finishing and reinforcement 1:1.5:3 (1 cement : 1.5 coarse sand (zone- III) : 3 graded stone aggregate 20 mm nominal size)

28.32

-

6082.45

... More
providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto pilinth level 1:2:4 (1 cement : 2 coarse sand (zone- III) : 4 graded stone aggregate 20 mm nominal size)

17.7

-

5218

... More
Providing Tor steel reinforcement of 10mm, 12mm, & 16mm dia bars as per approved design and drawing -----do-----do----E/I......

3.38

-

82096.54

... More
Centering and shuttering including strutting, propping etc. and removal of from foundation footing, bases of columns etc for mass concrete

488.15

-

194.5

... More
Filling in foundation trenches and pilinth layers not exceeding 150 mm thick well water, ramming, Fully compacted and fine dressed with earth obtained doctors after cutting with in a lead 50 mtr and lift of 1.5 mtr as per building specification and direction of E/I ...................

28.32

-

128.88

... More
Carriage Charge of materials

-

-

-

... More
Cement (0k+5p)

29.11

-

456.1

... More
Sand (2k+8p)

45.51

-

302.2

... More
Chips (2k+8p)

62.76

-

302.2

... More
Bricks (2k+8p)

3.78

-

747

... More
Steel (0k+5P)

3.38

-

456.1

... More
Soil (2k+0p)

28.32

-

171.66

... More
The Total value of Schedule4

18

-

9021.39

... More
The Total value of Schedule5

1

-

10090.56



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.