Urban Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Drainage Work
Eprocure
Opening Date18 Jul 2024
Closing Date24 Jul 2024
Tender Amount₹ 23,99,292 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing,supplying & spreding of stone dust in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick with all leads and lifts including cost of materials, labour,royality and taxes all complete as per specification and direction of E/I ( Mode of measurment compacted volume.)

11.01

3829

347.85

... More
Supplying and laying (properly as per design and drawing) rip-rap with good quality of boulders duly packed including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direction of E/I.

27.09

47580

1756.4

... More
Reinforced cement concrete work in walls (any thickness),including attached pilasters, buttresses, plinth and string courses, fillets, columns,pillars, piers, abutments, posts and struts etc.above plinth level upto to five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1½:3 (1 cemet : 1½ coarse sand (zone-iii) : 3 graded stone aggregate 20mm nominal size )

92.71

563903

6082.45

... More
Reinforced cement concrete work in beam, suspended floors, roofs having slope up to 15° landing,balconies, shelves, chajjas, lintel, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinfocement, with 1:1.5:3(1 cement : 1.5 coarse sand(zone-iii) : 3 graded stone aggregate 20mm nominal size)

33.87

213681

6308.87

... More
Providing Tor steel reinforcement of 8 mm dia bars as per approved design and drawing excluding carriage of Rods (straight or in coils) to work site, cutting, bending and binding with annealed wire with cost of wire, removal of rust, placing the rods in position all complete as per building specification and direction of E/I.

4.02

335172

83314.02

... More
Providing Tor steel reinforcement of 10mm and 12mm dia rods as per approved …...........do…..........TMT Fe 500(Only valid for Tata (Tiscon),SAIL,JSPL,Electrosteel Steels Ltd, Bokaro and Vizag(RINL)

6.03

495370

82096.54

... More
Centering and shuttering including strutting, propping etc. and removal of from for Foundations,footings, bases of columns, etc. for mass concrete.

781.3

151962

194.5

... More
Sand with lead of 49 km

54.43

46201

848.82

... More
Stone dust lead 22 km

11.01

4922

447.06

... More
Stone Boulder with lead of 36 km

27.09

18411

679.66

... More
Stone chips with lead of 22 km

108.86

48666

447.06

... More
Earth (lead 01 KM)

298.18

35048

117.54

... More
Good & Service Tax (GST)

2013166.73

362370

0.18

... More
Labour Cess

2375536.74

23755

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.