Urban Development Department Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 19,530Document Cost
₹ 5,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_UDD_61475_1Bid Award Id
ViewTender No
UDD/NPB/25/2022-23Tender Authority
Urban Development Department ViewPurchaser Address
-Website
http://http://juidco.jharkhand.gov.in/
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
Providing designation 75A one Brick flat soling joints filled with local sand incuding cost of Watering Royality and Taxes all complete as per Builiding Specification and direction of E/I.................................
473.98
-
356.52
providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto pilinth level 1:2:4 (1 cement : 2 coarse sand (zone- III) : 4 graded stone aggregate 20 mm nominal size)
72.21
-
4598.23
Filling in foundation trenches and pilinth layers not exceeding 150 mm thick well water, ramming, Fully compacted and fine dressed with earth obtained doctors after cutting with in a lead 50 mtr and lift of 1.5 mtr as per building specification and direction of E/I ...................
19.82
-
128.88
GUARD WALL Earthwork in excavation in foundation trenches in ordinary soil (vide classificationsoil item A) and disposal …do….do…. all complete as per approved design, building specification and direction of E/I.
19.11
-
167.33
Providing coarse clean sand in filling in foundation trenches or in plinth …do….do…. all complete as per specification and direction of E/I
3.19
-
589.51
Providing designation 75A one Brick flat soling joints filled with local sand incuding cost of Watering Royality and Taxes all complete as per Builiding Specification and direction of E/I.................................
41.82
-
356.52
Providing P.C.C. M-150 in nominal mix of (1:2:4) in foundation & plinth …do….do… all complete as per specification and direction of E/I.
3.19
-
4598.23
Providing random rubble stone masonry in C.M. (1:4) in foundation & plinth …do…do….all complete as per specification and direction of E/I. B=(4+2)/2=3
35.84
-
2739.68
Providing P.C.C.M150 in nominal mix of (1:2:4) infoundation with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of F.M 2.5 to 3 including screening ,shuttering,mixing cement concrete in mixer and placing in position ,vibrating ,striking,curing ,taxes and royalty all complete as per building specification and direction of E/I
1.59
-
4598.23
Providing 25mm thick C.P. (1:4) with clean coarse sand of F.M 1.5 including ,screening ,curing,with all leads and lift of water, scaffolding,taxes and royalty all comp. as per building specification & direction of E/I.
73.19
-
258.87
Filling in foundation trenches and pilinth layers not exceeding 150 mm thick well water, ramming, Fully compacted and fine dressed with earth obtained doctors after cutting with in a lead 50 mtr and lift of 1.5 mtr as per building specification and direction of E/I ...................
73.62
-
128.88
Carriage Choarge of Materials Cement (0k+5p)
30.48
-
456.1
Sand (2k+8p)
97.07
-
302.2
Chips (2k+8p)
69.29
-
302.2
Bricks (2k+6p)
16.76
-
747
Soil (2k+0p)
93.44
-
171.66
Stone (2k+8P)
35.84
-
310.39
Add 18% GST
18
-
8192.36
Add 01% Labour Cess
1
-
9641.36
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements