Urban Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Urban Development Department - JUIDCO Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date19 Jun 2024
Closing DateCancelled
Tender Amount₹ 84,32,202 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in soil by manual means. (Excavation for roadway in soil using manual means including in truck for carrying of cut earth to embankment site with all lift and lead uoto 1000m metres.) (ii) including royalty @ Rs. 30.00 per. Cum, cost of watering, rolling & compaction

32.33

6388

197.6

... More
Providing concrete for plain/reinforced in open foundation complete as per drawings and technical specification Clause 802 803 1202 1203 P.C.C- M15

8.61

32325

3754.4

... More
Stone masonrt work in cement mortar in foundation complete as per drawings and technical specification Clause 702 704 1202 1203 (ii) in (1:3) cement Mortar

27.03

93485

3458.6

... More
Providing and laying Reinforced cement concrete Pipe NP-3 as per design in single Row including fixing collar with cement morter 1:2 but excluding excavation, protection works, backfilling concrete and masonary works in head. Clause 1106

10

63889

6388.9

... More
Supply of NP3 R.C.C Hume pipe coller as per Sl No. M-301.(vii) 1000 mm dia

10

51267

5126.77

... More
excavation for strcutures - Earthwork in excavation for structure as per drawing and technical specification in ordinary soil by mechanical means upto 3m

612.72

35170

57.4

... More
Sand filling in foundation trenches as per Drawing and Technical specification.

29.1

16522

567.8

... More
P.C.C. M10 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days)

116.38

392910

3376.1

... More
random rubble masonry work in cement mortar (1:3) for foundation complete as per drawing and technical specification.

244.32

845015

3458.6

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification. Granular material

222.92

142647

639.9

... More
Random Rubble masonry work in cement mortar 1:3 for sub–structure complete as per drawing and technical specification.

327.11

1134686

3468.8

... More
Providing weep holes in Brick Masonry/Plain/ Reinforced Concrete Abutment, Wing Wall/Return Wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.

77

8508

110.5

... More
P.C.C.M15 (1:2:4) in sub structure (Plain Cement Concrete 1:2:4 nominal mix in sub structure complete as per drawings and technical specifications

4.31

16157

3746.2

... More
Carriage of Materials (i)  Cement

352.05

176938

502.6

... More
(ii)               Sand

539.09

219063

406.36

... More
(iii)              Stone chips

861.76

419677

487

... More
(iv)              Stone Metal /Aggregate

109.63

56959

519.55

... More
(v)         Dust :

265.99

112840

424.23

... More
(Vi) stone Boulder

598.47

352866

589.62

... More
GST @18%

1273532.72

1273532

1

... More
Labour Cess @1%

83487.15

83487

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.