State Building Construction Corporation Limited Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

State Building Construction Corporation Limited - JSBCC Tender

Works
Civil And Construction
Civil Works Others
Eprocure
Opening Date10 Dec 2024
Closing Soon23 Dec 2024
Tender Amount₹ 1,63,06,803 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing designation 100A brick work with fly ash lime brick (FLAG) confirming to IS 12894-1990 (9" x 4.5" x 3") in C.M. (1:6) in superstructure with approved quality of clean sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes and royalty all complete as per building specification and direction of E/I.

663.4

-

-

... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:3:6 (1 Cement : 3 coarse sand (zone-III): 6 graded stone aggregate 40 mm nominal size) M 10

37.91

-

-

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)

179.88

-

-

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)

83.4

-

-

... More
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).

31.59

-

-

... More
Centering and shuttering including strutting, propping etc. and removal of form for :

-

-

-

... More
Foundations, footings, bases of columns, etc. for mass concrete

272.94

-

-

... More
Lintels, beams, plinth beams, girders, bressumers and cantilevers

2021.8

-

-

... More
Columns, Pillars, Piers, Abutments, Posts and Struts

1570.69

-

-

... More
Providing Tor steel reinforcement of 8mm. dia. rods as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l. TMT Fe 500 ( Only valid for Tata (Tiscon), SAIL, JSPL, Electrosteel Steels Ltd.. Bokaro, and Vizag (RINL).

19.5

-

-

... More
Providing Tor steel reinforcement of 10mm. ,12mm & 16mm dia. bars as per approved design and drawing with cutting, bending and binding with annealed wire with cost of wire, removal of rust placing the rods in position all complete as per building specification and direction of E/l.

-

-

-

... More
(a) 10mm TMT Fe 500 ( Only valid for Tata (Tiscon), SAIL, JSPL, Electrosteel Steels Ltd.. Bokaro, and Vizag (RINL).

14.62

-

-

... More
(c) 12/16mm TMT Fe 500 ( Only valid for Tata (Tiscon), SAIL, JSPL, Electrosteel Steels Ltd.. Bokaro, and Vizag (RINL).

14.62

-

-

... More
Supplying, fitting and fixing M.S. grill gate with M.S. grill made of 20X6mm M.S. flats or 16mm M.S. square bars fitted on 25X25X6mm M.S. Angle frame of size 60X60X6mm. Including cost of fabrication, providing necessary locking arrangement with haskal and domny duly fixed in P.C.C. (1:2:4) blocks of required size applying a priming red lead paint over steel work, taxes all complete as per drawing specification and direction of E/I.

850.5

-

-

... More
Providing 12mm cement plaster (1:6) with clean coarse sand of F.M. 1.5 including screening, curing with all leads and lifts of water, scaffolding taxes and royalty all complete as per building specification and direction of E/l.

6511.12

-

-

... More
Labour for scrapping old paint with paint remover and below lamp as required on wooden or steel surface including cost of all labour and materials and scaffolding all complete as per building specification and direction of E/I.

37.8

-

-

... More
Providing two coats of synthetic enamel paint of approved shade and make over steel surface including cleaning the surface thoroughly, scaffolding and taxes all complete as per building specification and direciton of E/l.

37.8

-

-

... More
Finishing walls with Acrylic Smooth exterior paint of required shade : New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 0.90 Liter /10 sqm)

6511.12

-

-

... More
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.

4094.15

-

-

... More
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length ( total length 90 m), having 50 nos rounds per 6 metre length, upto 3 m height of wall with existing angle iron 'Y' shaped placed 2.4 m or 3.00 m apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angle iron, all complete as per direction of Engineer-in-charge, with reinforced barbed tape(R.B.T.) / Spring core (2.5mm thick) wire of high tensile strength of 165 kg/ sq.mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)

1378.5

-

-

... More
Carriage of materials from source to site work including loading & unloading all complete job as per specification and direction of E/I

-

-

-

510.03

-

-

... More
Aggregate

289.98

-

-

... More
Fly Ash Brick

269.34

-

-

... More
Add GST 18 %

18

-

-

... More
Add Labour cess 1%

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.