Rural Works Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Works Department - RWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date21 Jun 2024
Closing Date6 Jul 2024
Tender Amount₹ 18,15,85,400 
Notes
Download

Costs

Summary

Strengthening Of Road From (i) Mundro To Kalichatan (l-11.00 Km), (ii) L053 - T01 To Lakshi Bergi (l-1.20 Km), (iii) L080 - T03 To Teliasingha (l-1.95 Km),

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

696.54

1770472

2541.81

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

2752.99

7874019

2860.17

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

18353.25

1492119

81.3

... More
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

18353.25

292917

15.96

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

18536.78

238753

12.88

... More
Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.)

926.84

8110674

8750.89

... More
Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete for Grading II (10 mm Nominal size)

463.42

5199173

11219.14

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

1434

9384124

6544.02

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

2

5858

2929.3

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

12

20890

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.62

23316

14393.1

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

978.84

571936

584.3

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

552.98

30856

55.8

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3

17.64

44896

2545.13

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

89.62

439946

4909.02

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonary in C.M. (1:3) in foundation

261.38

1246466

4768.88

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

146.63

691197

4714.05

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Square Rubble Coursed Rubble Masonry (1st sort) in CM 1:3

84.22

411464

4885.59

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Coarse Rubble Masonary in C.M. (1:3) in sub-structure

32.68

164395

5030.45

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

11.8

57829

4900.82

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

6.76

36221

5358.2

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-25 in Deck Slab)

7.24

42277

5839.4

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

2.58

31321

12139.94

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

1.1

97293

88448.4

... More
Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204

255

15368

60.27

... More
Plastering with cement mortar (1:3), 15 mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204

80.88

9132

112.92

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

292

32266

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8

15.5

16882

1089.21

... More
(ii) L053 - T01 to Lakshi Bergi (L-1.20 KM) Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201

0.36

7113

19760.3

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

598.55

78589

131.3

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

63.84

146557

2295.7

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

816.51

5177342

6340.82

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

3

5222

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

0.41

5901

14393.1

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

77.59

4329

55.8

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3

8.82

20475

2321.47

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

11.66

54879

4706.62

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Square Rubble Coursed Rubble Masonry (1st sort) in CM 1:3

42.11

195079

4632.62

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Coarse Rubble Masonary in C.M. (1:3) in sub-structure

16.34

78058

4777.12

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

0.8

3758

4698.42

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

3.38

17407

5150.28

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-25 in Deck Slab)

3.62

20380

5629.86

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

1.29

15377

11920.48

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

0.55

48576

88321.46

... More
Plastering with cement mortar (1:3), 15 mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204

40.44

4530

112.03

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

20

2210

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8

7.75

8441

1089.21

... More
(iii) L080 - T03 to Teliasingha (L-1.95 KM) Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201

0.59

11658

19760.3

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. S.O.R. Item No. 3.15 (ii)

2589

10356

4

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

1329.15

174517

131.3

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)

876.2

54674

62.4

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

315.1

800924

2541.81

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

651.7

1863972

2860.17

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

4344.64

353088

81.27

... More
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

4344.64

69297

15.95

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

4344.64

55958

12.88

... More
Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.)

217.23

1900351

8748.11

... More
Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete for Grading II (10 mm Nominal size)

108.62

1217441

11208.26

... More
Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

42.42

153701

3623.33

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

490.88

3163643

6444.84

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

3

5222

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

0.53

7628

14393.1

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

229.42

134050

584.3

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

249.19

13904

55.8

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3

8.82

22448

2545.13

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

40.26

194102

4821.23

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonary in C.M. (1:3) in foundation

112.75

531211

4711.41

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

63.25

294296

4652.91

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Square Rubble Coursed Rubble Masonry (1st sort) in CM 1:3

42.11

203391

4830.01

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Coarse Rubble Masonary in C.M. (1:3) in sub-structure

16.34

81289

4974.87

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

5.2

25027

4813.03

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

3.38

17779

5260.14

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-25 in Deck Slab)

3.62

20751

5732.41

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

1.29

15506

12020.75

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

0.55

48560

88292.16

... More
Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204

110

6568

59.71

... More
Plastering with cement mortar (1:3), 15 mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204

40.44

4458

110.26

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

129

14254

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8

7.75

8441

1089.21

... More
(iV) L037 - Teliasingha to Garmundo (L-2.70 KM) Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201

0.81

16005

19760.3

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. S.O.R. Item No. 3.15 (ii)

4797.56

19190

4

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

2179.98

286231

131.3

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)

1221.2

76202

62.4

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

488.28

1140973

2336.72

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

1276.63

3376431

2644.8

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

8510.89

691680

81.27

... More
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

8510.89

135748

15.95

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

8510.89

109620

12.88

... More
Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.)

425.54

3632956

8537.28

... More
Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete for Grading II (10 mm Nominal size)

212.77

2340659

11000.89

... More
Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

24.75

88337

3569.2

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

273.84

1757217

6416.95

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

4

6963

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

0.63

9067

14393.1

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

449.42

262596

584.3

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

147.79

8246

55.8

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3

8.82

20804

2358.76

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

23.36

111575

4776.35

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonary in C.M. (1:3) in foundation

46.13

211264

4580.26

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

25.88

117500

4541.1

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Square Rubble Coursed Rubble Masonry (1st sort) in CM 1:3

42.11

197779

4696.73

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Coarse Rubble Masonary in C.M. (1:3) in sub-structure

16.34

79106

4841.28

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

2.6

12397

4768.15

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

3.38

17665

5226.58

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-25 in Deck Slab)

3.62

20675

5711.36

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

1.29

15493

12010.38

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

0.55

48635

88428.87

... More
Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204

45

2714

60.33

... More
Plastering with cement mortar (1:3), 15 mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204

40.44

4579

113.23

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

65

7182

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8

7.75

8441

1089.21

... More
(V) L078 - L039 to Bagro (L-5.30 KM) Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201

1.59

31418

19760.3

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. S.O.R. Item No. 3.15 (ii)

6990.15

46834

6.7

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

3794.48

498215

131.3

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)

2713.7

169334

62.4

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

853.66

2064790

2418.75

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

1759.54

4805215

2730.95

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

11730.27

953201

81.26

... More
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

11730.27

186980

15.94

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

11730.27

150968

12.87

... More
Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.)

586.51

5055845

8620.22

... More
Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete for Grading II (10 mm Nominal size)

293.26

3250733

11084.82

... More
Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

833.25

3043312

3652.34

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

1249.88

8129019

6503.84

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

1

2929

2929.3

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

6

10445

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

0.85

12234

14393.1

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

619.42

361927

584.3

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

132.19

7376

55.8

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3

8.82

21461

2433.3

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

20.76

100989

4864.62

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonary in C.M. (1:3) in foundation

35.88

167921

4680.74

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

20.13

93318

4636.93

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Square Rubble Coursed Rubble Masonry (1st sort) in CM 1:3

42.11

201979

4796.47

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203. Coarse Rubble Masonary in C.M. (1:3) in sub-structure

16.34

80738

4941.16

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

2.2

10684

4856.42

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

3.38

17965

5315.2

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-25 in Deck Slab)

3.62

20993

5799.22

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

1.29

15608

12099.76

... More
Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

0.55

48646

88448.4

... More
Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204

35

2119

60.55

... More
Plastering with cement mortar (1:3), 15 mm thick on brick or stone masonary work in substructure as per technical specification Clauses 613.4 & 1204

40.44

4621

114.27

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

55

6077

110.5

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 1204.3.8

7.75

8441

1089.21

... More
(Vi) Suriya Birni Road to Urro Via Nimatand Fakirapahri, Chhatarwar Road (L-7.90 KM) Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201

2.37

46831

19760.3

... More
Scarifying the existing bituminous road surface to a depth of 50 mm and disposal of scarified material with in all lifts and lead upto 1000 metres. S.O.R. Item No. 3.15 (ii)

14508.75

58035

4

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

5593

734360

131.3

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

573.9

1376355

2398.25

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

3011.06

8158226

2709.42

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

20073.75

1630992

81.25

... More
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

20073.75

319975

15.94

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

20073.75

258349

12.87

... More
Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.)

1003.69

8630168

8598.44

... More
Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete for Grading II (10 mm Nominal size)

501.84

5548272

11055.86

... More
Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

67.5

236891

3509.5

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

1477.13

9351724

6331.01

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

2

5858

2929.3

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

9

15668

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.2

17271

14393.1

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1060

619358

584.3

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

156

8704

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

26

122264

4702.47

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonary in C.M. (1:3) in foundation

102.5

467409

4560.09

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

57.5

259400

4511.31

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

4

18777

4694.27

... More
Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204

100

5957

59.57

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

99

10939

110.5

... More
(Vii) Dama to Pathaldiha (L-3.0 KM) Clearing grass and removal of rubbish up to a distance of 50 m outside the periphery of the area as per Technical Specification Clause 201

0.9

17784

19760.3

... More
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2)

2143.8

281480

131.3

... More
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)

150

9360

62.4

... More
Granular Sub-base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. With Grading-I Material.

295.96

594450

2008.55

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

480.75

1105845

2300.25

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

2169.71

176093

81.16

... More
Tack Coat on Granular surfaces treated with primer Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

2169.71

34520

15.91

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

11010.79

141488

12.85

... More
Bituminous Macadam Grading-II with VG-30 Grade Packed Bitumen (Providing and laying bituminous macadam with higher capacity hot mix plant using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.)

329.51

2698077

8188.15

... More
Semi-Dense Bituminous Concrete Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete for Grading II (10 mm Nominal size)

164.76

1752572

10637.12

... More
Construction of dry lean cement concrete sub-base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing.

25

83155

3326.2

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification

861.34

5300109

6153.33

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

4

6963

1740.9

... More
Retro-reflectorised Traffic signs (Providing and fixing of retroreflectorised cautionary, mandatory and informatory sign as per IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1

7526

7526

... More
Direction and Place Identification signs upto 0.9 sqm size board (Providing and erecting direction and place identification retro- reflectorised sign asper IRC :67 made of encapsulated lens type reflective sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick with area exceeding 0.9 sqm supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm, 2 Nos. firmly fixed to the ground by means of properly designed foundation with M 15 grade cement concrete45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

0.54

7772

14393.1

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

348

203336

584.3

... More
E/W in excavation for structure as per drawing and technical specification clause 305.1 including setting out, construction of shoring and brading, removal of stumps and other deleterious material and disposal utp a lead of 50m, dressing of sides and bottom backfilling in trenches with excavated suitable material.

46.8

2611

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

7.8

35172

4509.29

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonary in C.M. (1:3) in foundation

30.75

130434

4241.78

... More
Stone masonry work in cement mortar in sub-structure complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203 Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

17.25

72886

4225.32

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

1.2

5401

4501.09

... More
Pointing with cement mortar (1:3) on brick or stone masonary work as per drawing and technical specification Clauses 613.3 and 1204

30

1802

60.08

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

30

3315

110.5

... More
Goods & Service Tax (G.S.T.) -

151525767.71

27274638

0.18

... More
Labour Cess -

178800405.89

1788004

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.