Rural Works Department Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Works Department - RWD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Aug 2023
Closing Date14 Aug 2023
Tender Amount₹ 9,61,80,100 
Notes
Download

Costs

Summary

Jh-m-pak-01-2023-24

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

106.98

211516

1977.16

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

789.66

64862

82.14

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

789.66

12839

16.26

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

276.97

2209378

7976.96

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

9761.56

128169

13.13

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

131.89

1381797

10476.89

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

2

3481

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.08

14800

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

278.58

162774

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

198.56

11079

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

31.2

131107

4202.17

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

41

159148

3881.68

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

23

89326

3883.74

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

3.28

13756

4193.97

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

69

7689

111.44

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

40

2377

59.43

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

15.6

27783

1780.99

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

68.38

273604

4001.23

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

37.45

155223

4144.82

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

6.74

31332

4648.78

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

6.14

31552

5138.89

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

2.64

30161

11424.65

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

0.98

86497

88262.87

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

103.67

11291

108.92

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

25.73

28025

1089.21

... More
2.Dumarsol to Saidpur Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201.

0.75

14820

19760.3

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20

13.5

8812

652.8

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

3406.67

447295

131.3

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

167.05

362655

2170.94

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

1196.03

98217

82.12

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

1196.03

19435

16.25

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

495.66

4046865

8164.6

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

17686.17

232042

13.12

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

236.03

2517073

10664.21

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

3

5222

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.08

14800

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

498.54

291296

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

347.57

19394

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

51.59

226739

4395.02

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

100.8

413932

4106.47

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

68.25

279688

4098

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

5.31

23294

4386.82

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

109

12176

111.71

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

105

6289

59.9

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

22.9

44625

1948.73

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

101.5

428773

4224.37

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

56.12

245145

4368.24

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

10.1

48859

4837.58

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

8.66

46084

5321.5

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

3.99

46305

11605.27

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

1.41

124409

88233.57

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

154.74

17207

111.2

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

38.49

41923

1089.21

... More
3.REO Road to Dongi Barmasiya Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201.

1.18

23317

19760.3

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20

13.5

8812

652.8

... More
Removing all type of Hume pipes and stacking within a lead of 1000 meters including Earthwork and Dismanting of Masonary works

7.5

5970

796

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

4880.06

640751

131.3

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

435.64

889472

2041.76

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

3090.29

253836

82.14

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

3090.29

50248

16.26

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

716.83

5762961

8039.51

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

24217.59

317734

13.12

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

341.35

3597596

10539.32

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

187.48

1106651

5902.77

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

4

6963

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.08

14800

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

721

421280

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

689.55

38476

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

101.45

431699

4255.29

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

252

995029

3948.53

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

170.63

673401

3946.56

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

10.67

45316

4247.09

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

223

24860

111.48

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

262.5

15621

59.51

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

36.5

67047

1836.91

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

165.6

673629

4067.81

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

90.95

383035

4211.5

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

16.8

78969

4700.54

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

12.6

65373

5188.4

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

6.75

77447

11473.68

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

2.15

189744

88253.1

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

236.15

25811

109.3

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

63.8

69491

1089.21

... More
4.REO Road to Gaipathar Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201.

0.91

17981

19760.3

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20

4.5

2937

652.8

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

4071.96

534648

131.3

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

188.17

416608

2214

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

1368.86

112438

82.14

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

1368.86

22257

16.26

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

601.56

4937706

8208.17

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

21547.79

282707

13.12

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

286.46

3067923

10709.78

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

4

6963

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.62

22200

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

605.06

353536

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

229.41

12801

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

34.29

152306

4441.71

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

112.03

465843

4158.2

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

72.88

302269

4147.49

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

6.63

29394

4433.51

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

93

10394

111.77

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

115

6903

60.03

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

7.3

14497

1986.01

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

33.12

141610

4275.68

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

30.67

135549

4419.61

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

3.36

16413

4885.08

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

2.52

13530

5369.19

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

1.35

15733

11654.47

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

0.43

37948

88253.1

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

147.07

16439

111.78

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

12.76

13898

1089.21

... More
5.Raghunatpur to Benagariya Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201.

0.63

12448

19760.3

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20

9

5875

652.8

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

2231.21

292957

131.3

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

230.53

545141

2364.73

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

1662.64

136635

82.18

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

1662.64

27051

16.27

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

297.19

2484692

8360.62

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

9658.96

126918

13.14

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

141.52

1538226

10869.32

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

340.31

2121380

6233.67

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

3

5222

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.08

14800

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

298.92

174658

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

290.82

16227

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

44.58

204700

4591.75

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

108.85

471264

4329.49

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

67.75

292026

4310.35

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

5.5

25209

4583.55

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

108

12091

111.96

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

110

6639

60.36

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

14.6

30900

2116.46

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

66.24

294491

4445.82

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

38.54

176897

4589.98

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

6.72

33855

5037.98

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

5.04

27834

5522.71

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

2.7

31895

11813.33

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

0.86

75956

88321.46

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

111.74

12669

113.38

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

25.52

27796

1089.21

... More
6.Sagbera to Chota Udalphari Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201.

0.64

12646

19760.3

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20

18

11750

652.8

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

2806.39

368479

131.3

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

393.51

972906

2472.38

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

2821.8

231980

82.21

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

2821.8

45938

16.28

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

425.17

3600977

8469.5

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

13375.06

175882

13.15

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

202.46

2223672

10983.27

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

3

5222

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

1.08

14800

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

427.64

249870

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

443.34

24738

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

67.36

317615

4715.2

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

125.33

559428

4463.64

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

79.5

352918

4439.23

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

7.32

34455

4707

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

138

15478

112.16

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

127.5

7740

60.71

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

29.2

64522

2209.66

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

132.48

606595

4578.77

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

74.68

352719

4723.08

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

13.44

69396

5163.46

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

10.08

56938

5648.64

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

5.4

64492

11943.08

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

1.72

151996

88370.28

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

204.28

23506

115.07

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

51.04

55593

1089.21

... More
7.Rajpokhar to Lakhhipokhar Clearing grass and removal of rubbish up to a distance of 50 metres outside the periphery of the area as per Technical Specification Clause 201.

1.08

21341

19760.3

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Cement Concrete Grade M-15 & M-20

16.5

10771

652.8

... More
Construction of sub-grade and earthen shoulders with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

4175.09

548189

131.3

... More
Wet Mix Macadam (Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.)

445.13

1023856

2300.13

... More
Prime coat Over WMM/WBM(Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.).

3194.42

262453

82.16

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

3194.42

51973

16.27

... More
Bituminous Macadam for Grading II with VG-30 Grade Packed Bitumen ( Providing and laying bituminous macadam 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction). Bituminous Macadam for Grading II (19 mm Nominal size)

590.41

4897616

8295.28

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.) as per Technical Specification Clause 503

19297.27

253373

13.13

... More
Providing and laying semi dense bituminous concrete with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects. Semi-Dense Bituminous Concrete, Grading II: (10 mm size)

281.15

3036687

10800.95

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501

350.99

2168065

6177

... More
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast)

4

6963

1740.9

... More
Providing and fixing of retro- reflectorised cautionary, mandatory and informatory sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 1.5 mm thick supported on a mild steel angle iron post 75 mm x 75 mm x 6 mm firmly fixed to the ground by means of properly designed foundation with M15 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing 801. 80 mm x 60 mm rectangular

1

7526

7526

... More
Direction and Place Identification Signs with size more than 0.9 sqm size Board.(Providing and erecting direction and place identification retro- reflectorised sign as per IRC :67 made of high intensity grade sheeting vide clause 801.3, fixed over aluminium sheeting, 2 mm thick or Aluminium composite material sheet with overall thickness of 4 mm with area exceeding 0.9 sqm fixed over back support frame of min 40 x 40 x 5 mm Angle mounted on two nos. of mild steel circular pipe 65 NB, 3.2mm thickness and 4.5m meter total height firmly fixed to the ground by means of properly designed foundation with M 25 grade cement concrete 45 cm x 45 cm x 60 cm, 60 cm below ground level as per approved drawing)

2.16

29601

13704.3

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

593.84

346980

584.3

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling in trenches with excavated suitable material.

731.55

40820

55.8

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and Technical Specifications (P.C.C. Grade M-15)

107.45

487296

4535.1

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications. Random Rubble Stone Masonary in C.M. (1:3) in foundation

280.8

1196662

4261.62

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random Rubble Masonry Work in Cement Mortar 1:3 in S/S

190.13

807377

4246.45

... More
Plain/Reinforced Cement Concrete on Top of Wall complete as per Drawing and Technical Specifications. (P.C.C. Grade M-15)

10.99

49750

4526.9

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

242

27079

111.9

... More
Pointing with cement mortar (1:3 ) on brick or stone work in substructure as per Technical Specifications

292.5

17631

60.28

... More
Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 2506

36.5

75210

2060.56

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.. Square Rubble Coursed Rubble Masonry (first sort) in C.M. (1:3) in foundation

165.6

725038

4378.25

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications. Coursed rubble masonry in C.M. (1:3) in (first sort ) sub-structure

88.55

400450

4522.31

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (P.C.C. Grade M-20)

16.8

83665

4980.11

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in sub-structure as per drawing and Technical Specification (R.C.C. Grade M-25 in Deck Slab)

12.6

68853

5464.57

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

6.75

79332

11752.91

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

2.15

189828

88292.16

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications.

216.95

24506

112.96

... More
Backfilling behind abutment, wing wall and return wall with Sandy Material complete as per drawings & technical specification Clause 710.1.4.of IRC:78 & 2200

63.8

69491

1089.21

... More
Good & Service Tax (GST)

80701554.38

14526279

0.18

... More
Labour Cess

95227834.17

952278

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.