Rural Development Department Tender

... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date11 Mar 2025
Closing Date17 Mar 2025
Tender Amount₹ 3,88,92,947 
Notes
Download

AI Insights

Class Of Bidder
... View More
A specific class of contractor in Rural Works Department (RWD)/RCD, Govt. of Jharkhand, Public undertaking or any other State Govt./Central Govt. Department, as mentioned in the NIT, though the exact class is not specified.
Bid Capacity
... View More
Assessed Available Bid capacity = [ ( A x N x 2) - B ] where A = Maximum value of civil engineering works executed in any one year during the last five years. N = Number of years prescribed for completion of the works for which bids are invited (period up to 6 months to be taken as half-year and more than 6 months as one year). B = Value, at the current price level, of existing commitments and on-going works to be completed during the period of completion of the works for which bids are invited. Alternatively, Bid Capacity = 10% of the contract/BoQ price of works.
Technical Capacity
... View More
The bidder is required to have prior work experience as a prime contractor on construction works of a similar nature and volume. Specifically, they should have: * Completed at least 1.3 times the work as a prime contractor in the same name and style over the last three years from the tendered financial year. * Completed at least 44.74 M length of single bridge work, with a minimum of 50% of the bridge length of the tender invited. * In case of Pile/Well foundation work, completed at least 119.40 M (50% of the total pile length) of Well Sinking/piling work. The value of similar works completed is not explicitly mentioned, but the bidder should have achieved a minimum financial turnover of at least Rs. 583.40 Lac (one and a half times the estimated cost of the project) in any one year. The percentage of similar works completed is 50% of the bridge length of the tender invited and 50% of the Total Pile Length, respectively. The bidder should provide proof of completion of similar works during the last 5 years, with a list of similar works in hand, and provide details of works in progress or contractually committed. The bidder should also provide the total monetary value of civil construction works performed for each of the last five years in terms of Rs. In Lakhs.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Levelling course (PCC M15) for Pile cap

27.7

3405

94335.12

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

159.75

1701

271750.73

... More
Random rubble stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification.

116.64

3458

403411.1

... More
Aggregate,BARASLOYA 84 Km.(P) + 1 Km (K) .

454.63

1511

687105.05

... More
Providing Steel liner 10 mm thick for Curbs and 6mm thick for piles including fabricating and setting out as per detailed drawing (Unit Weight = 47.1 kg/sqm.

21.31

95570

2036422.61

... More
Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25-1967, fixed in position including finishing and lettering but excluding painting. (2x2x25 Nos. = 100 Nos.)

100

545

54580

... More
Sand,SANKH RIVER 39 Km.(P) + 1 Km (K) .

780.68

729

569427.99

... More
Bitumen ,Bokaro 278 Km.(P) + 2 Km (K) .

6.46

3037

19622.9

... More
Bored Cast-in-situ M35 grade RCC pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000m. (Pile diameter - 1200mm).

238.8

8162

1949300.52

... More
Supplying, fiiting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.

62.75

87394

5483586.73

... More
PCC 1:3:6 in Foundation (Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.)

30.96

3376

104524.06

... More
Granular Sub-Base with Graded Material (Shoulder) with Close Graded Material Gr-I (By Mix in Place Method) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.

106.5

1437

153104.4

... More
Back filling behind abutment, wing wall and return wall (with Sandy Material) complete as per drawing and Technical specification

190.67

874

166759.98

... More
CARRIAGE OF MATERIALS Cement,SIMDEGA 24 Km.(P) + 1 Km (K) .

658.25

654

430561.33

... More
Protective Work 1(Guard Wall):120 M Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

217.8

57

12501.72

... More
Drainage Spouts complete as per Drawing and Technical Specification.

24

817

19629.6

... More
Open graded Premix surfacing (Providing, laying and rolling of open- graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.)

1793.1

148

266096.04

... More
Furnishing and placing Reinforced/Prestressed cement concrete (RCC Grade M30) in super-structure (for T-beam & slab) as per drawing and Technical Specification.

382

5495

2099433.8

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessrories as per drawing and Technical Specifications.

322560

-

261273.6

... More
PCC M15 Grade levelling course below approach slab complete as per drawing and Technical Specification.

5.29

3405

18015.84

... More
GST @ 18%

32633787.05

-

5874081.67

... More
Protective Work 1(RCC Retaining Wall):48 M Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.

474.72

57

27248.93

... More
Providing and laying of filter media with granular materials/tone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specifications to a thickness of not less than 600mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.

101.32

1645

166701.8

... More
Plain/Reinforced cement concrete (PCC Grade M15) in open foundation complete as per drawing and technical specifications.

43.56

3376

147062.92

... More
Furnishing and Placing Reinforced/Prestressed cement concrete (PCC Grade M20) in super-structure (coping) as per drawing and Technical Specification

7.2

4168

30011.04

... More
Cement concrete for reinforced concrete M-25 in pile cap complete as per drawing and Technical Specification

300.18

4295

1289513.24

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return all with 100 mm dia AC pipe, extending through the full width of the structures with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specifications.

60

110

6630

... More
CONSTRUCTION OF APPROACH ROAD Excavation in Soil with Dozer with lead upto 100 metres (Excavation for road way in soil by mechanical means including cutting and pushing the earth to site of embankment upto a distance of 100 metres (average lead 50 metres), including trimming bottom and side slopes in accordance with requirements of lines, grades and corss sections.)

524.06

154

81019.68

... More
Supplying, fiiting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specification.

8.05

87744

706346.45

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

42.25

10290

434752.5

... More
Reinforced cement concrete (RCC Grade M25) in substructure complete as per drawing and technical specifications. (Stem)

58.8

4630

272296.92

... More
Supplying, fiiting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specification.

26.3

87744

2307954.1

... More
Construction of Embankment with Material Obtained from Borrow Pits. (Construction of embankment with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-2) Rolling with Vibratory roller

2153.51

129

279740.95

... More
Providing and laying cement concrete wearing coat M-30 grade including reinforcement comlete as per drawing and Techncial Specifications.

50.31

10876

547196.72

... More
Seal Coat (Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade. (Case-II : Type B)

1793.1

54

97006.71

... More
Labour cess @ 1%

38507868.71

-

385078.69

... More
Granular Sub-Base with Graded Material (Carriageway) with Close Graded Material Gr-I (By Mix in Place Method) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401.

172.53

1437

248029.13

... More
Prime coat over WMM/WBM (Providing and applying primer coat with bituminen emulsionon on the prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.7kg/sqm using mechanical means)

1065

80

85519.5

... More
Boulder,KOLEBIRA 84 Km.(P) + 1 Km (K) .

207.84

1619

336530.37

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return all with 100 mm dia AC pipe, extending through the full width of the structures with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specifications.

72

110

7956

... More
Plain/Reinforced cement concrete (RCC Grade M25) in substructure complete as per drawing and technical specifications.

232.74

4630

1077795.67

... More
Supplying, fiiting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications.

5.19

87394

453142.04

... More
Supplying, fiiting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specification.

56.68

87893

4982172.16

... More
Reinforced cement concrete in approach slab including reinforcement and formwork complete as per drawing and Technical specification

15.44

8747

135062.94

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance to vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

192.96

1987

383527.3

... More
Tack coat on Bituminus surfaces (Providing and applying tack coat with bitumen emulsion on pressure distributor at the rate of 0.2kg/sqm on the prepared surface of bituminous/granular Base cleaned with mechanical broom).(in Two Layers)

1065

12

13419

... More
Pointing with cement mortar (1:3) on stone work as per Technical specifications.

150

57

8661

... More
Reinforced cement concrete (RCC Grade M25) in open foundation complete as per drawing and technical specifications.

119.88

4378

524870.6

... More
Chips,BARASLOYA 84 Km.(P) + 1 Km (K) .

1698.2

1399

2375781.8

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return all with 100 mm dia AC pipe, extending through the full width of the structures with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specifications.

66

110

7293

... More
Steel,SIMDEGA 24 Km.(P) + 1 Km (K) .

188.3

654

123163.76



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.