Rural Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date5 Aug 2024
Closing Date14 Aug 2024
Tender Amount₹ 4,51,46,601 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling Annular Space around footing in rock

26.22

88521

3376.1

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

38.86

131195

3376.1

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M25 RCC Grade M25 using batching plant,transit mixer & Concrete pump

501.12

2194053

4378.3

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

37

3233607

87394.8

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump Sub-Total For Upto 5 m=

190.88

883946

4630.9

... More
Sub-Total For 5 m to 10 m=

231.19

1105666

4782.5

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

59.88

5254164

87744.9

... More
Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications

403200

326592

0.81

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

190

20995

110.5

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Sandy material

450.51

394016

874.6

... More
Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drwaing and technical specification.

180.61

297157

1645.3

... More
RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump. For T-beam & slab, 25-35 per cent of (a+b+c) Height 5m to 10m

390

2143401

5495.9

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

57.52

5055651

87893.8

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

54.45

592225

10876.5

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

207.68

412784

1987.6

... More
Drainage Spouts complete as per drawing and Technical specification

40

32716

817.9

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump

5.73

19514

3405.64

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

16.49

144247

8747.6

... More
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

50.7

521703

10290

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder

252

291916

1158.4

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

126

231915

1840.6

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications PCC Grade M20 Height upto 5m PCC Grade M20 using batching plant, transit mixer & concrete pump

26.81

111749

4168.2

... More
Clearing and Grubbing road land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Manual means:- In area of thorny jungle

0.15

13274

88499.5

... More
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

7603.43

987685

129.9

... More
Compacting Original ground Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.

225

11835

52.6

... More
Granular Sub-Base with Graded Material (Table:- 400-1) By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material

180

258768

1437.6

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

118.14

200967

1701.1

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

787.6

63244

80.3

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

787.6

9923

12.6

... More
Open-Graded Premix Surfacing Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.

787.6

116879

148.4

... More
Seal Coat Case-II : Type B Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade.

787.6

42609

54.1

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder

74.69

86520

1158.4

... More
Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means

552

31684

57.4

... More
Sand Filling in foundation trenches as per drawing & technical specification

36.8

20895

567.8

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

36.8

124240

3376.1

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M25 RCC Grade M25 using batching plant,transit mixer & Concrete pump

221.4

969355

4378.3

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump

84

388995

4630.9

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

10.32

901914

87394.8

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

13.44

1179291

87744.9

... More
Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means

429

24624

57.4

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

56.54

190884

3376.1

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M25 RCC Grade M25 using batching plant,transit mixer & Concrete pump

48.03

210289

4378.3

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump

124.64

577195

4630.9

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

13.74

1205614

87744.9

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

154

17017

110.5

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Sandy material

198.07

173232

874.6

... More
Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drwaing and technical specification.

70.77

116437

1645.3

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

6.19

67325

10876.5

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

22

43727

1987.6

... More
Drainage Spouts complete as per drawing and Technical specification

2

1635

817.9

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump

8.71

29663

3405.64

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

16.7

146084

8747.6

... More
Sand - 75 KM Bajra Ghat

1022.47

1297923

1269.4

... More
Cement - 80 KM Dumka

811.07

935650

1153.6

... More
Boulder - 65 KM Pabiya

326.69

434138

1328.9

... More
Aggregate - 65 KM Pabiya

2690.55

3015030

1120.6

... More
Steel - 80 KM Dumka

200.89

231746

1153.6

... More
Bitumen - 200 KM Bokaro

1.69

3835

2269.6

... More
Bitumen Emulsion -200 KM Bokaro

0.63

1429

2269.6

... More
Add GST @ 18%

37881021.49

6818583

0.18

... More
Add Labour Cess GST @ 1%

44699605.36

446996

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.