Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 2,63,500Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_RDSPL_90737_1Bid Award Id
ViewTender No
RDD/SD/BOKARO/31/2024-25/GR02Tender Authority
Rural Development Department ViewPurchaser Address
-Website
http://https://www.jharkhand.gov.in/PDepartmentdepartment
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
BOQ Items
... More
Construction of subgrade and earthen shoulders with approved materials obtained from borrow pits or any other sources free from logs, roots, rubbish or any other ingredients likely to deteriorate or effect stability of the embankment including breaking the clods maximum to 60 mm cubes, placing the earth in layers not exceeding 225 mm loose thickness, rough dressing including cost of cutting and removing shrubs & roots in borrow area all complete job as per direction of E/I (Mode of measurement after required compaction)
With initial lead of 15M & lift of 1.5M RCD 3.18
2088.45
274213
131.3
... More
Compacting original ground supporting subgrade (Loosening of the ground upto a level of 150mm below the subgrade level,watered,graded and compacted in layers to meet requirement of table 300-2 for subgrade construction).RCD 3.20 Case 1
837.68
44061
52.6
... More
By mix in Place method ( construcion of granular sub base by providing coarse graded material spreading in uniform layer with motor grader on prepared surface, mixing by mix in placed method with rotavator at OMC and compacting with vibratory power roller to achieve desire density. (Grading II Materials) RCD 4.01(B)(ii)
859.28
1131413
1316.7
... More
Cement concrete pavement (Construction of un-reinforced,dowel jointed,plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate confirming to IS 383, maximum size of coarse aggregate not exceeding 25mm mixed in batching and mixing plant as per approved mix design, transported to site, laid with a fixed form, spread compacted and finished in continuous operation including provision of contraction,expansion,construction and longitudinal joints.RCD 6.02
1248.3
6691387
5360.4
... More
Earth work in excavation in foundation trenches in ordinary soil (vide classfication of soil item -A) and extra for eath work in hard soil and disposal of excavated soil as obtained to a distance upto 50 mtr BCD 5.1.1
114.39
17366
151.82
... More
Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150 mm thick all complete job as per building specification. BCD (5.1.10)
6.03
3554
589.51
... More
Providing P.C.C. M-100 with nominal mix of (1:3:6) in foundation and plinth with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand all complete job as per specification and direction of E/I BCD (5.3.1.4)
5.7
23514
4125.41
... More
Providing Tor steel reinforcement of different dia as per approved design and drawing all complete job as per specification and direction of E/I BCD .(5.5.5.a)
2.19
179791
82096.54
... More
Providing Tor steel reinforcement of different dia as per approved design and drawing all complete job as per specification and direction of E/I BCD .(5.5.5.b)
3.28
265283
80879.07
... More
Centering and shuttering including strutting proping etc.and removal of form for mass concrete.BCD (5.3.17.2)
21.03
7838
372.72
... More
Supplying and laying boulder in the rock toe, heel trenches of the dam as per design and drawing including the cost of materials, royalty all taxes etc. but excluding the cost of carriage all complete as per specification and direcition of E/I. 6.4 (common Sor)
9.06
13509
1491.06
... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mmnominal size)
B.C.D. S.O.R. Item No. 5.3.10
42.12
256192
6082.45
... More
Excavation for structure in ordinary soil (Earth work in excavation of foundation of structure as per drawing and technical specification including setting out, construction of shoring and bracing removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved materials.(Mechanical Means) RCD 12.01 (I)(B) (i)
155.93
8950
57.4
... More
P.C.C (1:3:6) in Foundation (Plain/Reinfoced Cement concrete in open foundation) complete as per drwaing and technical specifications.RCD 12.04
12.15
41019
3376.1
... More
RCC Grade M25 using batching plant, transit mixer & manual placing RCD 12.08 (E) Case I
49.61
217207
4378.3
... More
RCC Grade M25 using batching plant, transit mixer & concrete pump RCD 13.05 (F) (p)
20.25
93775
4630.9
... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.RCD 12.42
1.94
169108
87394.8
... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specificationsRCD 13.06
2.66
232962
87744.9
... More
Providing Weep Hole in Reainforce Concrete Return Wall of 100 mm Dia AC Pipe extending Through the Full wridth RCD 13.08
30
3315
110.5
... More
Carriage of materials:-
(a) Cement
546.32
299984
549.1
... More
(b) Sand
625.7
205004
327.64
... More
(c) Stone chips
1971.76
520150
263.8
... More
(d) M.S. Reinforcement
10.06
5523
549.1
... More
(e)Dust
822.17
216888
263.8
... More
Add. 18% GST
11041310.39
1987435
0.18
... More
Add. 1% Labour Cess
13028746.26
130287
0.01