Rural Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date26 Dec 2024
Closing Date3 Jan 2025
Tender Amount₹ 93,77,078 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Compacting original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of table 300-2 for sub-grade construction.

900

52

47340

... More
Construction of Subgrade and Earthen Shoulders Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2

1012.5

131

132941.25

... More
Granular Sub-Base with Close Graded Material (Table:- 400-1) Construction of granular sub-base by providing close graded Material, mixing in a mechanical mix plant at OMC, carriage of mixed Material to work site, spreading in uniform layers with motor grader on prepared surface and compacting with vibratory power roller to achieve the desired density, complete as per clause 401

607.5

1437

873342

... More
Construction of un-reinforced, dowel jointed, plain cement concrete pavement over a prepared sub base with 43 grade cement @ 400 kg per cum, coarse and fine aggregate conforming to IS 383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a batching and mixing plant as per approved mix design, transported to site, laid with a fixed form or slip form paver, spread, compacted and finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, joint filler, separation membrane, sealant primer, joint sealant, debonding strip, dowel bar, tie rod, admixtures as approved, curing compound, finishing to lines and grades as per drawing

750

5360

4020300

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.

64.41

57

3697.13

... More
providing and laying of dry rubble flooring Complete as per drawing and Technical

7.3

1544

11274.12

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications(.PCC M-150)

9.79

3754

36755.58

... More
Stone Masonry Work in Cement Mortar 1:3 in Foundation complete as per Drawing and Technical Specifications.Random rubbel masonarywork In cement mortar (1:3) in foundation

32.31

3458

111747.37

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications Random rubbel masonarywork In cement mortar (1:3) in superstructure

17.47

3468

60599.94

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (PCC M-150)

0.59

3746

2210.26

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (PCC M-20 in s/s )

3.36

4208

14141.9

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and Technical Specifications (PCC M-25 in Deck slab )

2.52

4630

11669.87

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

0.9

10876

9788.85

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

0.43

87744

37730.31

... More
Plastering with cement mortar (1:3 ) on brick work in sub-structure as per Technical Specifications

41.06

100

4138.85

... More
Painting Two Coats on New Concrete SurfacesPainting two coats after filling the surface with synthetic enamel paint in all shades on new plastered concrete surfaces

41.06

70

2886.52

... More
Providing and fixing 20mm thick compressible fiber board in expansion joint complete as per drawing and Technical Specifications

15

268

4033.5

... More
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

20

110

2210

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification

12.76

874

11159.9

... More
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work.

105

55

5859

... More
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications(.PCC M-150)

15

3754

56316

... More
Providing random rubble stone masonry in cement mortar (1:3) in foundation and plinth with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening, raking out joints to 20 mm depth, curing,taxes and royalty all complete job as per specification and direction of E/I. 4.28 COMMON [5.2.28 BCD 2018]

72

3458

249019.2

... More
Providing random rubble stone masonry in cement mortar (1:3) in superstructure with hammer dressed stone of less than 0.03 M3 in volume and clean coarse sand of F.M 2 to 2.5 including cost of screening, raking out joints to 20 mm depth, curing,taxes and royalty all complete job as per specification and direction of E/I. 4.31 COMMON [5.2.31 BCD 2018]

48.75

3468

169104

... More
Plain/Reinforced Cement Concrete in open foundation complete as per drawing and technical specifications PCC Grade M15

2

3754

7508.8

... More
Providing weep hole with dry graded stone filter of 20mm to 40mm size in abutment and wing wall as per specification and direction of E/I. 6.9 COMMON [6.7.6 WRD 2018]

50

110

5525

... More
Providing 25mm cement plaster (1:4) with clean coarse sand of F.M 1.5 including screening , curing with all leads and lifts … Do… E/I

60

257

15472.2

... More
Back filling behind abutment, wing wall and return wall (with Sandy Materials) Complete as per drawing and technical specification.

35

874

30611

... More
Carriage of Materials CEMENT- 10

715.83

502

359776.16

... More
Sand -20 Km

658.29

417

274704.42

... More
Stone chips-30 Km

1293.19

604

781733.36

... More
Stone Metal -30 Km

221.74

604

134041.83

... More
Stone Boulder -30 Km

183.54

604

110949.93

... More
ADD GST 18%

1

1416239

1416239.34

... More
ADD LABOUR CESS 1%

1

92842

92842.36



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.