Rural Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date17 Aug 2024
Closing Date28 Aug 2024
Tender Amount₹ 2,90,31,982 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification RCC Grade M25 RCC Grade M25 using batching plant & Concrete pump

253.37

1088426

4295.8

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

45.69

3993068

87394.8

... More
Providing Steel Liner 10 mm thick for Curbs and 6 mm thick for Steining of Wells including Fabricating and Setting out as per Detailed Drawing.

18.06

1726008

95570.8

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump Height upto 5m

78.53

363664

4630.9

... More
Height 5 to 10m

82.48

394460

4782.5

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

22.13

1941794

87744.9

... More
Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications

241920

195955

0.81

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

48

5304

110.5

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Sandy material

102.25

89427

874.6

... More
Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drwaing and technical specification.

76.81

126375

1645.3

... More
RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump. For T-beam & slab, 25-35 per cent of (a+b+c) Height 5m to 10m

234

1286040

5495.9

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

34.51

3033215

87893.8

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

32.67

355335

10876.5

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

130.24

258865

1987.6

... More
Drainage Spouts complete as per drawing and Technical specification

24

19629

817.9

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump

5.73

19514

3405.64

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

16.49

144247

8747.6

... More
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

33.8

347802

10290

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder

205.2

237703

1158.4

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

102.6

188845

1840.6

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications PCC Grade M20 Height upto 5m PCC Grade M20 using batching plant, transit mixer & concrete pump

26.46

110290

4168.2

... More
Clearing and Grubbing road land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Manual means:- In area of thorny jungle

0.08

6637

88499.5

... More
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

2176.85

282772

129.9

... More
Compacting Original ground Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.

112.5

5917

52.6

... More
Granular Sub-Base with Graded Material (Table:- 400-1) By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material

90

129384

1437.6

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

64.72

110095

1701.1

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

431.4

34641

80.3

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

431.4

5435

12.6

... More
Open-Graded Premix Surfacing Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.

431.4

64019

148.4

... More
Seal Coat Case-II : Type B Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade.

431.4

23338

54.1

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder

28.16

32620

1158.4

... More
Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means

552

31684

57.4

... More
Sand Filling in foundation trenches as per drawing & technical specification

36.8

20895

567.8

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

36.8

124240

3376.1

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M25 RCC Grade M25 using batching plant,transit mixer & Concrete pump

221.4

969355

4378.3

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump

84

388995

4630.9

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

10.32

901914

87394.8

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

13.44

1179291

87744.9

... More
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres By Mechanical means Prestressed/ Reinforced cement concrete grade M-20 & above

113.4

100585

887

... More
Dismantling of Structures Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concree, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with allk lifts and lead of 1000 metres Dismantling stone masonry By Mechanical means Dismantling Brick/ Tile work/ rubble masonary/pitching/ etc. by mechanical means

594

79833

134.4

... More
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

1016.4

132030

129.9

... More
Granular Sub-Base with Graded Material (Table:- 400-1) By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material

60.98

87664

1437.6

... More
Laying Reinforced Cement Concrete Pipe NP4 / Prestressed Concrete Pipe on First Class Bedding in Single Row . Laying Reinforced cement concrete pipe NP4 / prestressed concrete pipe for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works, backfilling, concrete and masonry works in head walls and parapets . 1000 mm dia

30

191667

6388.9

... More
Sand (Barakar River )

664.29

269940

406.36

... More
Cement (Tilaiya)

513.45

344011

670

... More
Boulder (Dhabtham)

233.36

202901

869.48

... More
Aggregate (Dhabtham)

1634.68

1112301

680.44

... More
Steel (Tilaiya)

149.11

99903

670

... More
Bitumen (Bokaro)

0.92

1660

1804.6

... More
Bitumen Emulsion (Bokaro)

0.35

631

1804.6

... More
Hume Pipe (Ranchi)

30

52464

1748.8

... More
Goods & Services Tax (G.S.T.) - 18%

24359776.38

4384759

0.18

... More
Labour Cess - 1%

28744536.13

287445

0.01



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.