Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date28 Feb 2025
Closing Soon6 Mar 2025
Tender Amount₹ 4,70,88,557 
Notes
Download

AI Insights

Technical Capacity
... View More
The bidder is required to have prior work experience as a prime contractor on construction works of a similar nature and volume over the last three years. Specifically, the bidder should have satisfactorily completed at least 48.42 M Length of single bridge work, which is a minimum of 50% of the bridge length of the tender invited. In case of Pile/Well foundation work, the bidder should have completed Well Sinking/piling of at least 50% of the Total Pile Length. The bidder should also have executed works outside of Jharkhand State. The value of similar works completed is mentioned as 1.3 (in Rs. Lakhs), but the percentage is not specified in this context. However, it is mentioned that the bidder should have completed at least 50% of the bridge length of the tender invited and 50% of the Total Pile Length for Pile/Well foundation work. The bidder should have achieved a minimum financial turnover of at least Rs.706.33 Lac (One and a half times the estimated cost of the project) in any one year in the last five years. The bidder must provide proof of completion of similar works during the last 5 years and submit a list of similar works in hand in the prescribed formats.

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Filling Annular Space around footing in rock

26.22

3376

88521.34

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

38.86

3376

131195.25

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M25 RCC Grade M25 using batching plant,transit mixer & Concrete pump

501.12

4378

2194053.7

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

37

87394

3233607.6

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump Sub-Total For Upto 5 m=

190.88

4630

883946.19

... More
Sub-Total For 5 m to 10 m=

213.73

4782

1022163.73

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

53.02

87744

4652234.6

... More
Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications

403200

-

326592

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

170

110

18785

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications Sandy material

430.71

874

376698.97

... More
Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drwaing and technical specification.

172.82

1645

284340.75

... More
RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump. For T-beam & slab, 25-35 per cent of (a+b+c) Height 5m to 10m

390

5495

2143401

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

57.52

87893

5055651.38

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications

54.45

10876

592225.43

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

207.68

1987

412784.77

... More
Drainage Spouts complete as per drawing and Technical specification

40

817

32716

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification PCC Grade M15 using batching plant & Concrete pump

5.73

3405

19514.32

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

16.49

8747

144247.92

... More
Strip Seal Expansion Joint Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.

50.7

10290

521703

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder

216

1158

250214.4

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification

108

1840

198784.8

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications PCC Grade M20 Height upto 5m PCC Grade M20 using batching plant, transit mixer & concrete pump

27.07

4168

112833.17

... More
APPROACH ROAD PART Clearing and Grubbing road land Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness. By Manual means:- In area of thorny jungle

0.25

88499

22124.88

... More
Construction of Embankment with Material obtained from Borrow pits. Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.

12964.46

129

1684083.35

... More
Compacting Original ground Compacting Original ground supporting sub-grade Loosening of the ground upto a level of 500 mm below the sub-grade level, watered, graded and compacted in layers to meet requirement of Table 300-2 for sub-grade construction.

369

52

19409.4

... More
Granular Sub-Base with Graded Material (Table:- 400-1) By Mix in Place Method Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401. Rate per cum for grading-I Material

295.2

1437

424379.52

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

190.14

1701

323447.15

... More
Prime Coat over WMM/WBM Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.

1267.6

80

101788.28

... More
Tack Coat on Bituminous surfaces Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.25 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.

1267.6

12

15971.76

... More
Open-Graded Premix Surfacing Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.

1267.6

148

188111.84

... More
Seal Coat Case-II : Type B Providing and laying of premix sand seal coat with HMP of appropriate capacity not less than 200 tonnes/hours using crushed stone chipping 6.7mm size and penetration bitumen of suitable grade.

1267.6

54

68577.16

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. Stone/Boulder

371.08

1158

429859.07

... More
RETAINING WALL Excavation for strucutres Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Mechanical Means

690

57

39606

... More
Sand Filling in foundation trenches as per drawing & technical specification

46

567

26118.8

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

46

3376

155300.6

... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. RCC Grade M25 RCC Grade M25 using batching plant,transit mixer & Concrete pump

276.75

4378

1211694.53

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump

105

4630

486244.5

... More
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

12.9

87394

1127392.92

... More
Supplying, fitting and placing HYSD bar reinforcement in sub structure complete as per drawing and technical specifications

16.8

87744

1474114.32

... More
BOX CULVERT Excavation for structures Earth work in excavation of foundation of structures as per drawing and technical specifications, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary soil Manual Means Depth 3 m to 6 m

429

57

24624.6

... More
PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

56.54

3376

190884.69

... More
Plain/Reinforced Cement concrete in open Foundation complete as per Drawing and Technical specifications. RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump

48.03

4630

222422.13

... More
Plain/Reinforced cement concrete for wall & slab etc. complete as per Drawing and Technical specifications. RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump

124.64

5262

655905.54

... More
Supplying, fitting and placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical specifications

12.51

87595

1095824.71

... More
Providing weep holes in Brick masonary/ plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.

154

110

17017

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical specifications. Granular material

198.07

639

126744.99

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

70.77

1645

116437.88

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical specifications.

6.19

9753

60372.93

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

22

1987

43727.2

... More
Drainage spouts complete as per Drawing and Technical Specifications.

2

817

1635.8

... More
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specifications. PCC Grade M15 using batching plant & concrete pump

8.71

3405

29662.78

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per Drawing and Technical specifications.

16.7

8647

144411.58

... More
CARRIAGE PART Sand (Local) - 22KM (P), 1KM (K).

1090.08

476

519357.72

... More
Cement (Chaibasa) - 32KM (P), 1KM (K).

834.91

728

608231.94

... More
Boulder (Nowamundi) - 78KM (P), 1KM (K).

587.08

1526

896054.33

... More
Aggregate (Nowamundi) - 78KM (P), 1KM (K).

2948.18

1309

3861290.31

... More
Steel (Chaibasa) - 32KM (P), 1KM (K).

198.74

728

144782.09

... More
Bitumen (Bokaro) - 202KM (P), 0KM (K).

2.71

2288

6201.02

... More
Bitumen Emulsion (Bokaro) - 202KM (P), 0KM (K).

1.01

2288

2311.08

... More
G.S.T @ 18%

39510451.56

-

7111881.28

... More
Labour Cess 1%

46622332.84

-

466223.33



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.