Rural Development Department Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Rural Development Department - RDD Tender

Works
Civil And Construction
Bridge Construction
Eprocure
Opening Date11 Sep 2024
Closing Date19 Sep 2024
Tender Amount₹ 5,28,55,411 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying of PCC M15 levelling course 100 mm thick below the pile cap. PCC Grade M15 using batching plant & Concrete pump

20.41

69508

3405.6

... More
Cement Concrete for Reinforced Concrete in Pile Cap complete as per Drawing and Technical Specification (RCC M30)

342.41

1491469

4355.8

... More
Supplying,Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

105.39

9210537

87394.8

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. G) RCC Grade M30 RCC Grade M30 using batching plant, transit mixer & concrete pump Height upto 5m

91.67

430335

4694.4

... More
Height 5m to 10m

122.99

593635

4826.7

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

38.87

3410644

87744.9

... More
Back filling behind abutment, wing wall, return wall complete as per drawing and technical specifications (B) Sandy Materials

79.32

69373

874.6

... More
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

54.36

89438

1645.3

... More
Supplying , fitting and fixing in position true to line and level elastomeric bearing conforming to IRC:83 (Part-II) section IX and clause 2005 of Mort&H specification complete including all accessories as per drwaing and technical specifications.

403200

326592

0.81

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

92

10166

110.5

... More
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification. C) RCC Grade M30 Using Batching Plant,Transite Mixer and Concrete Pump. (ii) For T-beam & slab, (q) (Height 5m to 10m)

390

2143401

5495.9

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

57.4

5045104

87893.8

... More
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications.

58.39

635078

10876.5

... More
PCC M15 Grade levelling course below approach slab complete as per drawing and Technical Specification.

7.88

26836

3405.64

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification.

15.75

137774

8747.6

... More
Construction of RCC railing of M30 Grade in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.

207.6

412625

1987.6

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

50.7

521703

10290

... More
Drainage Spouts complete as per drawing and Technical specification

40

32716

817.9

... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications. (A) Stone/Boulder

287.06

332530

1158.4

... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification.

143.53

264181

1840.6

... More
Clearing and grubbing road land (Clearing and grubbing road land including uprooting rank vegetation, grass, bushes, shrubs, sapling and tress girth upto 300 mm, removal of stumps of tree cut earlier and disposal of unserviceable materials and stacking of sericeable material to be used of auctioned, up to a lead of 1000 metres including removal and disposal of top organic soil not exceeding 150mm in thickness.)

0.24

21239

88499.5

... More
Embankment Construction with Material Obtained from Borrow Pits (Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.)

6667.75

866140

129.9

... More
Compacting original ground supporting embankment (Loosening of the ground upto a level of 500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.)

720

37872

52.6

... More
Granular Sub-Base with Graded Material (Table:- 400-1) Gr-I (By Mix in Place Method) Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.

314.4

451981

1437.6

... More
Wet Mix Macadam (Plant Mix Method) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density.

188.44

320555

1701.1

... More
Prime Coat over WMM/WBM (Providing and applying primer coat with SS1 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means.)

1256.25

100876

80.3

... More
Tack Coat on Bituminous surfaces (Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous surface cleaned with mechanical broom.)

1256.25

15828

12.6

... More
Open graded Premix surfacing (Providing, laying and rolling of open-graded pemix surfacing of 20mm thickness composed of 13.2mm to 5.6mm aggregates using viscosity grade bitumen to required line, grade and level to serve as wearing course on a previously prepared base, including mixing in a suitable hot mix plant of appropriate capcity not less than 200 tonnes/hour, laying and rolling with a smooth wheeled roller finished to required level and grades.)

1256.25

186427

148.4

... More
Seal Coat (Providing and laying seal coat sealing the voids in a bituminous surface laid to the specified levels, grade and cross fall using ) Type B seal coats.

1256.25

67963

54.1

... More
Boundary pillar (Reinforced cement concrete M15 grade boundary pillars of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting).

100

54580

545.8

... More
Excavation for structures in Ordinary soil - (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I (B) - Mechanical Means (i) (Depth upto 3m)

272

15612

57.4

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

17

57393

3376.1

... More
FILTER MEDIA - Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2. of MoRTH specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and Technical Specification.

105

172756

1645.3

... More
RePlain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications. (E) RCC Grade M25 Case - I (RCC Grade M25 using batching plant & Concrete pump)

118

516639

4378.3

... More
Plain/Reinforced cement concrete in sub-strucutre complete as per drawing and Technical specifications. F) RCC Grade M25 RCC Grade M25 using batching plant, transit mixer & concrete pump (p) Height upto 5m

96.25

445724

4630.9

... More
Supplying,Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications.

7.35

642351

87394.8

... More
Supplying, fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and Technical Specifications

9.51

834454

87744.9

... More
Providing weep holes in Brick masonry/ Plain/Reinforced concrete abutment , wing wall/ returen wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20 H towards drawing face. Complete as per drawing and technical specifications.

150

16575

110.5

... More
Excavation for structures in Ordinary soil - (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.) I (B) - Mechanical Means (i) (Depth upto 3m)

255

14637

57.4

... More
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.

51

172181

3376.1

... More
Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical Specification. (b) Random Rubble Masonry

157.99

546424

3458.6

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical Specifications (A) Random Rubble Masonry

131.96

457742

3468.8

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications. PCC M20

2.55

10628

4168.2

... More
Sand, Damodar River 55 Km (P) + 1 Km (K).

1231.53

1191480

967.48

... More
Stone Chips, Manika 68 Km (P) + 0 Km (K).

2092.19

2357563

1126.84

... More
Stone Metal, Manika 68 Km (P) + 0 Km (K).

216.11

262655

1215.38

... More
Stone Boulder, Manika 68 Km (P) + 0 Km (K).

835.66

978649

1171.11

... More
Bitumin, Bokaro 180 Km (P) + 0 Km (K).

2.69

5604

2083.6

... More
Cement, Daltonganj 105 Km (P) + 0 Km (K).

846.39

1173181

1386.1

... More
Steel, Daltonganj 105 Km (P) + 0 Km (K).

253.11

350835

1386.1

... More
Emulsion, Bokaro 180 Km (P) + 0 Km (K).

1.13

2354

2083.6

... More
Goods & Service Tax (G.S.T.) @ 18%

12

7982861

1

... More
Labour Cess @1%

1

523320

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.