Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,10,000Document Cost
₹ 10,000Tender Fee
Refer Documents
Summary
Protection Work Of Bridge Approach At Km 7th, 12th And 17th Of Jori To Chopat Via Barka Dohar Road
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_CECOM_96373_1Bid Award Id
ViewTender No
RCD/GUMLA/871/2024-25(2nd Call)Tender Authority
Road Construction Department ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Plain/Reinfoced Cement concrete in open foundation complete as per drwaing and technical specifications.
A.PCC Grade M15
CaseII.PCC Grade M15 using batching plant & manual placing
14.15
5367
75952.39
... More
Stone masonry work in cement mortar 1:3 in foundation complete as per drawing and technical specifications.
(B)Random Rubble masonry (coursed/uncoursed)
43.54
5212
226969.67
... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.
A.Random Rubble Masonry (Coursed/uncoursed)
59.04
5101
301216.18
... More
Providing and laying of filter media with granular materials/stones crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRT&H specifications to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment , wing wall and return wall to the full height compacted to a firm condition complete as per drwaing and technical specification.
26.45
3375
89284.88
... More
Construction of Embankment with approved material obtained from Borrow pits with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacting to meet requirement of Table 300-2.
1520
129
197448
... More
Providing and laying pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specifications.
A.Stone/Boulder
600
2824
1694790
... More
Providing weep holes in Brick masonary/ plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical specifications.
225
110
24862.5
... More
Granular Sub-Base with Graded Material (Table:- 400-1).
B.By Mix in Place Method
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(v)Rate per cum for grading-V Material
84.7
2818
238694.76
... More
Providing and laying Filter material underneath pitching in slopes complete as per drawing and Technical specification
360
3570
1285524
... More
Add 18% G.S.T.
18
3063822
830322.76
... More
Add 1% labour cess
1
5443226
54432.27