National Rural Employment Programme Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

National Rural Employment Programme - NREP Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date2 Sep 2023
Closing Date15 Sep 2023
Tender Amount₹ 24,70,452 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

7.03

34146

4854.5

... More
PROVIDING RANDOM RUBBLE STONE MASONRY IN C.M (1:4) IN FOUNDATION AND PLINTH WITH HAMMER DRESSED STONE OF LESS THAN 0.03 M3 IN VOLUME AND CLEAN COARESE SAND OF F.M 2 TO 2.5 INCLUDING COST OF SCREENING , RAKING OUT JOINTS TO 20MM DEPTH CURING TAXES AND ROYALY ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I

19.95

54656

2739.68

... More
PROVIDING RANDOM RUBBLE STONE MASONRY IN CEMENT MORTAR (1:4) IN SUPERSTRUCTUR - DO -- INCLUDING COST OF SCREENING OF MATERIALS SCAFFOLDING , RAKING OUT JOINTS TO 20MM DEPTH - DO --

16.93

49210

2906.96

... More
REINFORCED CEMENT CONCRETE WORK IN WALLS. (ANY THICKNESS) INCLUDING ATTACHED PILASTERS, BUTTERSSES ,PLINTH AND STRING COURSES ,FILLETS, COLUMNS, PILLARS ,PIERS, ABUTMENTS , POSTS, AND STRUTS ETC ABOUT PLINTH LEVEL UP TO FLOOR FIVE LEVEL EXCLUDING COST OF CENTRING SHUTTERING FINISHING AND REINFORCEMENT

1.41

8575

6082.45

... More
PROVIDING P.C.C.M 200 IN NOMINAL MIX OF (1:1.5:3) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

2.09

10891

5218

... More
PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

1.09

5013

4598.23

... More
PROVIDING TOR STELL REINFORCEMENT OF 20MM,25MM,28MM,32MM, DIA BARS AS PER APPROVED DESIGN AND DRAWING -DO -

0.34

27272

80879.08

... More
PROVIDING 25 MM THEEK CEMENT PLASTER (1:4) RED CLEAN COURSE SEND AAP FM 1.5 INCLUDING SCREENING CURING WITH ALL LEADS AND LIFTS OF WATER SCAFFOLDING TAXES AND ROYALTY ALL COMPLETE AS PER BUILDINGS SPECIFICATIONS AND DIRECTION OF E/I

40.36

10448

258.87

... More
DEWATING DURING CONST

1

5000

5000

... More
ADD. CARRIAGE COST OF MATERIALS , (1) CEMENT LEAD FROM 6+1 KM

9.4

4574

486.7

... More
(2) STONE CHIPS LEAD FROM 7+1KM

10.4

2633

253.24

... More
(3) STONE BOULDER LEAD FROM 7+1 KM

40.5

17155

423.59

... More
(4) SAND LEAD FROM 44+1 KM

30.4

24435

803.8

... More
(5) ROD LEAD FROM 6+1 KM

0.34

164

486.7

... More
EARTHWORK IN EXCAVATION IN FOUNDATION TRENCHES IN ORDINARY SOIL ( VIDE CLASSIFICATION OF SOIL ITEM _ A ) AND DISPOSAL OF EXCAVATED EARTH AS ABTAINED TO A DISTANCE UPTO 50 M. INCLUDING ALL LIFTS, LEVELLING, RAMMING THE FOUNDATION TRENCHES , REMOVING ROOTS OF TREES, SHURBS ALL COMPLETE AS PER APPROVED DESIGN . BUILDING SPECIFICATION AND DIRECTION OF E/I OR EXTRA OF EARTHWORK IN HARD SOIL AS PER SPECIFICATION AND DIRECTION OF ( VIDE CLASSIFICATION OF SOIL ITEM _ B)

33.64

5628

167.33

... More
PROVIDING COARSE CLEAN SAND IN FILLING IN FOUNDATION TRENCHES OR IN PLINTH INCLUDING RAMMING AND WATERING IN LAYERS NOT EXCEEDING 150MM THICK WITH ALL LEADS AND LIFTS INCLUDING COST OF ALL MATERIALS , LABOUR , ROYALTY AND TAXES ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I (MODE OF MEASUREMENT COMPLETED VOLUME )

1.84

1087

589.51

... More
SUPPLYING AND LAYING ( PROPERLY AS PER DESIGN AND DRAWING ) RIP RAP WITH GOOD QUALITY OF BOULDERS DULY PACKED INCLUDING THE COST OF MATERIALS ROYLTY ALL TAXES ETC. BUT EXCLUDING THE COST OF CARRIAGE ALL COMPLETE AS PER SPECIFICATION AND DRIECTION OF E/I.

3.69

6479

1756.4

... More
PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

7.03

34146

4854.5

... More
PROVIDING RANDOM RUBBLE STONE MASONRY IN C.M (1:4) IN FOUNDATION AND PLINTH WITH HAMMER DRESSED STONE OF LESS THAN 0.03 M3 IN VOLUME AND CLEAN COARESE SAND OF F.M 2 TO 2.5 INCLUDING COST OF SCREENING , RAKING OUT JOINTS TO 20MM DEPTH CURING TAXES AND ROYALY ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I

19.95

54656

2739.68

... More
PROVIDING RANDOM RUBBLE STONE MASONRY IN CEMENT MORTAR (1:4) IN SUPERSTRUCTUR - DO -- INCLUDING COST OF SCREENING OF MATERIALS SCAFFOLDING , RAKING OUT JOINTS TO 20MM DEPTH - DO --

16.93

49210

2906.96

... More
REINFORCED CEMENT CONCRETE WORK IN WALLS. (ANY THICKNESS) INCLUDING ATTACHED PILASTERS, BUTTERSSES ,PLINTH AND STRING COURSES ,FILLETS, COLUMNS, PILLARS ,PIERS, ABUTMENTS , POSTS, AND STRUTS ETC ABOUT PLINTH LEVEL UP TO FLOOR FIVE LEVEL EXCLUDING COST OF CENTRING SHUTTERING FINISHING AND REINFORCEMENT

1.41

8575

6082.45

... More
PROVIDING P.C.C.M 200 IN NOMINAL MIX OF (1:1.5:3) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

2.09

10891

5218

... More
PROVIDING P.C.C.M 150 IN NOMINAL MIX OF (1:2:4) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO ------

1.09

5013

4598.23

... More
PROVIDING TOR STELL REINFORCEMENT OF 20MM,25MM,28MM,32MM, DIA BARS AS PER APPROVED DESIGN AND DRAWING -DO -

0.34

27272

80879.08

... More
PROVIDING 25 MM THEEK CEMENT PLASTER (1:4) RED CLEAN COURSE SEND AAP FM 1.5 INCLUDING SCREENING CURING WITH ALL LEADS AND LIFTS OF WATER SCAFFOLDING TAXES AND ROYALTY ALL COMPLETE AS PER BUILDINGS SPECIFICATIONS AND DIRECTION OF E/I

40.36

10448

258.87

... More
DEWATING DURING CONST

1

5000

5000

... More
ADD. CARRIAGE COST OF MATERIALS , (1) CEMENT LEAD FROM 6+1 KM

9.4

4574

486.7

... More
(2) STONE CHIPS LEAD FROM 7+1KM

10.4

2633

253.24

... More
(3) STONE BOULDER LEAD FROM 7+1 KM

40.5

17155

423.59

... More
(4) SAND LEAD FROM 44+1 KM

30.4

24435

803.8

... More
(5) ROD LEAD FROM 6+1 KM

0.34

164

486.7

... More
SITE CLERANCE

80

26148

326.85

... More
STONE CRUSHER DUST FINER THAN 3MM WITH NOT MORE THAN 10% PASSING 0.075 SIEVE QUARRY

71.51

21452

300

... More
SUPPLYING AND LAYING ( PROPERLY AS PER DESIGN AND DRAWING ) RIP RAP WITH GOOD QUALITY OF BOULDERS DULY PACKED INCLUDING THE COST OF MATERIALS ROYLTY ALL TAXES ETC. BUT EXCLUDING THE COST OF CARRIAGE ALL COMPLETE AS PER SPECIFICATION AND DRIECTION OF E/I.

143.02

251198

1756.4

... More
PROVIDING P.C.C.M 200 IN NOMINAL MIX OF (1:1.5:3) IN FOUNDATION WITH APPROVED QUALITY OF STONE -----DO -----

191.65

1005686

5247.64

... More
FILLING IN FOUNDATION TRENCHES AND PLENTH IN LAYERS NOT EXCEEDING 150MM . THICK WELL WATYERED RAMMED FULLY COMPACTED AND FINE DRESSED WITH EARTH OBTAINED FROM EXCAVATION OF FOUNDATION TRENCHES WITHIN A LEAD OF 50M AND LIFT OF 1.5M ALL COMPLETE AS PER BUILDING SPECIFICATION AND DIRECTION OF E/I (MODE OF MEASUREMENT COMPACTED VOLUME)

57.21

3162

55.28

... More
ADD. CARRIAGE COST OF MATERIALS ,(1) CEMENT LEAD FROM 6+1 KM

79.53

38708

486.7

... More
(2) STONE CHIPS LEAD FROM 7+1KM

164.82

41737

253.24

... More
(3) STONE BOULDER LEAD FROM 7+1 KM

143.02

60581

423.59

... More
(4) SAND LEAD FROM 44+1 KM

82.41

66239

803.8

... More
5) DUST LEAD FROM 7+1 KM

71.51

18974

265.34

... More
add 18 % GST

1

372354

372354.7

... More
add S/B & PHOTOGRAPHY

1

5000

5000

... More
add 1 % labour cess

1

24459

24459.92



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.