Maharashtra Natural Gas Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
Refer DocumentsDocument Cost
Refer DocumentsTender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
MNGL/CP/2024-25/42Tender No
MNGL/CP/2024-25/42Tender Authority
Maharashtra Natural Gas Limited ViewPurchaser Address
-
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
½”OD X 0.083” min Wall thk. SS Tube (Refer TS Section III - A)
563
-
-
Erection rates of following items (Refer TS Section III - A)
-
-
-
Ball Valves ¾” Size
200
-
-
Ball Valves ½” Size(2 way/3 way)
206
-
-
Ferrule Fittings ¾” (if to be changed)
23
-
-
Ferrule Fittings ½” (if to be changed)
23
-
-
Dismantaling of SS tubes along with all fittings (ie, unions, reducers, elbows, Tees , front Ferrule, Back Ferrule, NRV, Valves etc.) from the existing CNG station as per Instruction from Engineer In-Charge and scope of work including handling, lifting, transportation and submiting to Company's Stores from CNG site.
-
-
-
SS 316 tube of 3/4" OD/ 1/2" OD/ SS 304 tube of 1/2" OD
825
-
-
Supply, laying, testing and commissioning of SS 304 Tubes along with isolation valves, reducers & fittings etc.as per Technical Specification, Typical schematic drg. for Ins. air line of CNG station and scope of work including handling, storage,lifting, transportation upto CNG stations.
-
-
-
½”OD X 0.035” min Wall thk. SS Tube (Refer TS Section III - A)
240
-
-
SS Ball Valves ½” Size
14
-
-
Reducer ½” x 1/4" Size
14
-
-
Euqal Tee ½" Size
14
-
-
SECTION-B (i) : ERECTION OF MECH. EQUIPMENT Handling (including lifting and transportation from Company's store to CNG stations) and erecting in position, the following equipment either on the foundation at Ground level or on roof at 3.5 m above ground level. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
-
-
-
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (0 -50) Km
18
-
-
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (51-100) Km
13
-
-
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (101-150) Km
10
-
-
Cascade 3000 L water capacity. Erection at + 3.5 M level (Refer TS Section III - B) for (151-200) Km
6
-
-
SECTION-B (ii) : UNLOADING , SHIFITNG & LOADING OF MECHANICAL EQUIPMENT IN STATION PREMISE (CASCADE) Unloading from existing position (including Compressed natural Gas venting from cascade if necessary) at Ground level or on roof at 3.5 m above ground level, lifting & erecting on foundation at ground level in the same CNG stations. Again the same cascade is to be shifted to new foundation within the same CNG station. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
-
-
-
Cascade 3000 WLcapacity. (Refer TS Section III - B)
11
-
-
SECTION-B (iii) : SHIFTING OF MECHANICAL EQUIPMENT IN STATION PREMISE (CASCADE/ BOOSTER COMPRESSOR) Lifting of Cascade / Booster Compressor (including accessories if applicable) from existing position from ground level and shifting & erecting in the same CNG stations on foundation at ground level or on roof at 3.5 m above ground level (in case of Cascade if required) . Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, gasket, nut bolts, etc.
-
-
-
3000 WL Cascade/ Booster Compressor with accessories. Lifting & Erection at ground /3.5 m level (Refer TS Section III - B)
69
-
-
SECTION-B (iv) : UNLOADING, TRANSPORTAION & LOADING OF BOOSTER COMPRESSOR Unloading from existing position (including dismantaling of connection, packaging of booster Compressor package), handling including lifting and transportation from CNG stations to Company's store / erecting on civil foundation at or above ground level in other CNG station site if necessary. Contractor's scope shall include supply of all material and accessories including but not limited to any fixtures, clamps, wire rope, gasket, nut bolts, etc.
-
-
-
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (0-50Km)
5
-
-
450 SCMH Hydraulic Booster Compressor (Refer TS Section III - B)- (51-100Km)
6
-
-
SECTION - C : SUPPLY, ERECTION & COMMISSIONING OF MISCELLANEOUS ITEM Supply, erection & commissioning of following miscellaneous items as per technical specification and at locations (within the stations) as directed by EIC.
-
-
-
Water cooler (Refer TS Section III - C)
5
-
-
Fire fighting Equipments (Refer TS Section III - C)
-
-
-
DCP -9 Kg
65
-
-
DCP -75 Kg
5
-
-
CO2 – 4.5 Kg
20
-
-
Sand Bucket Set (6 Nos. on each strand)
20
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements