Jharkhand Urja Sancharan Nigam Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Jharkhand Urja Sancharan Nigam Limited - JUSNL Tender
Electrical Generators And Transformers
Electrical and Electronics
Eprocure
Opening Date10 Jun 2024
Closing Date2 Jul 2024
Tender Amount₹ 21,03,561
Costs
EMD
₹ 42,100Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_JSEB_86251_1Bid Award Id
ViewTender No
08/PR/JUSNL/2024-25Tender Authority
Jharkhand Urja Sancharan Nigam Limited ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Dismantalling of Jumper of HV & LV Bushing
6
-
-
Dismantalling of control cable of power transformer
75
-
-
Replacement of gasket of main tank top cover
1
-
-
Rate of replacement of gasket along with supply of Gasket of
-
-
-
Radiator
1
-
-
HV Bushing
1
-
-
LV Bushing
1
-
-
HV/LV Neutral Bushing
1
-
-
Tertiary Bushing
1
-
-
Conservator Tank
1
-
-
Oil Level Gauge
1
-
-
Silica Gel Pot
1
-
-
Replacement of gasket of door of marsheling box & OLTC Control Cable
1
-
-
Incpection cover, Main Hole Cover, Valves, Connecting Pipes,Tightening & Terminal arangement of buchholz relay, OTI, WTI.
1
-
-
Erection Testing & Commissioning of 20 MVA Power Transformer, including erection of top cover, radiators, inspection chamber pocket, OLTC chamber, all conservator tank, air seal, HV & LV Bushing, MOG, Breather, including installation of additional Cooling Fan & integration with existing local control kiosk, transformere protection relay & Valves, Local Control Panel, Nitrogen Purging & Vaccume Operation for dew point value, including hiring charges of overhead crane of suitable capacity all complete job as per direction of Engineer In Charge.
1
-
-
Construction of treated earth pit for power transformer HV-Neutral, LV-Neutral, & Body Earth respectively having (1x10)ft depth (including supply of all material) 40mm dia pipe.
3
-
-
Hiring Charges of 16 KL Oil Tank for storage of Transformer oil during Dismantaling, erection, Oil filteration & Nitrogen purging process.
336
-
-
Transformer Bushing/ CT Connector for ZEBRA conductor with bronze mounting (As per site requirement)
6
-
-
1.5 HP, 3-Phase AC Motor
6
-
-
Exhaust Fan Blade 12"
6
-
-
16/32 Amp Power contactor of type AC-1 duty-1, 3 Pole IS/IEC/60947-4-1 (fitted with thermal OLR)
12
-
-
2.5 sq mm ISI marked, FR LS PVC insulated, single core copper conductor cable. (confirms to IS:694:2010)
300
-
-
25 mm X 5 mm copper strip (1.15 Kg/mtr)
15
-
-
MCB sheet enclosure, powder painted fitted with Din Rail for 3 pole to 4 pole IS:8623- 1& 3 IEC-61439-1&3
6
-
-
3-way 4 Pole selector switch
1
-
-
2.5 sq mm copper lug
150
-
-
Welding Chagres
8000
-
-
Removal from plinth /existing position and dragging of transformer from its position from point of loading (dragging up to 100 ft) for 20 MVA Power Transformer repositioning required due to mismatched alignment of base rail with transformer body.
1
-
-
Sub-Total
-
-
-
GST @ 18% on Sub-Total (Sl.No. 22)
-
-
-
Total (Sl.No 22 + 23)
-
-
-
L.cess @1% on Total (Sl.No. 24)
-
-
-
Grand-Total (Sl.No. 24 + 25)
-
-
-
Say Rs.
-
-
-
Evaluation Notes How It Works ?
Potential Partner
Select Your Requirements