Jharkhand Urja Sancharan Nigam Limited Tender
... More
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 1,00,000Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2025_JSEB_97698_1Bid Award Id
ViewTender No
322/PR/JUSNL/2024-25Tender Authority
Jharkhand Urja Sancharan Nigam Limited ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Area - 132KV switchyard.
-
-
-
... More
L= 45m, W = 47m, Area= 45m x 47m = 2115M2
-
-
-
... More
Total Area = 1320M2 + 2115M2 = 3435M2
-
-
-
... More
Deduction of area in terms of cable trench and foundation of different equipment like power transformer, CT. Breaker, Isolator etc. = 10% of working area.
-
-
-
... More
Actual working area = (3435-10%*3435) = 3091.5m2
-
-
-
... More
Volume = 3091.5m2 x 0.40m = 1236.6m3
-
-
-
... More
Providing coarse clean sand in filling in foundaiton trenches or in plinth including ramming and watering as per direction of E/I. 3091.5m2 x 0.10m = 309.15m3
309.15
-
-
... More
Providing designation 75A one brick flat soiling joints filled with local sand including cost of watering ..as per direction of E/I.
3091.5
-
-
... More
Providing PCC M-150 in nominal mix of (1:2:4) in foundation wit approved quantity of stone chips 20mm to 6mm size graded…as per direction of E/I.
3091.5m2 x 0.10m = 309.15m3
309.15
-
-
... More
Supply and laying good quality of stone metal filter (20mm to 63mm) excluding cost of carriage.. All complete job…as per direction of E/I.
3091.5m2 x 0.15m = 463.72 - 30% of it = 324.60m3 (30% to be reused from existing laid gravel, which must be recovered before excavation of soil).
324.6
-
-
... More
Un skillied labour for recovering of existing laid gravel from switchyard (10 Mandays for 10 days) (and keep it safe for reuse).
100
-
-
... More
Carriage of Materials
-
-
-
... More
Sand (Surface Road 18Km + Kutcha Road 02 Km).
494.64
-
-
... More
Cement (Surface Road 05 Km + Unsurfaced Graveled Road 0Km).
102.25
-
-
... More
Bricks (Surface Road 15Km + Unsurfaced Road 2 Km + Kutcha Road 2 Km) ( Quoted rate should be per Bricks).
100473.75
-
-
... More
Stone Chips & Stone Metal (Surface Road 13 Km + Kutcha Road 2 Km).
602.84
-
-