Jharkhand Urja Sancharan Nigam Limited Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Costs
EMD
₹ 51,400Document Cost
₹ 5,900Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2024_JSEB_82403_1Bid Award Id
ViewTender No
523/PR/JUSNL-2023-24Tender Authority
Jharkhand Urja Sancharan Nigam Limited ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
Trip top Patrolling of 132 KV Transmission Lines including tree prunning along the corridor with complete checking and sort out the minor causes of tripping and vehicle with fuel & driver required for the work.
756
-
-
Break-Down and Scheduled Maintenance of Transmission lines.
-
-
-
Replacement of insulators at Suspension/Tension tower of 132 KV line (Excluding Material & Transportation cost)
4
-
-
Restoration (Opening and closing both) of Jumpers in lines
4
-
-
Fabrication of Tower members for missing tower members replacement
1
-
-
Minor Repairing of conductor with Repair sleeve
4
-
-
Replacement of conductor (Inluding Lowering & Re-stringing and re-sagging work) Per conductor per span for HTLS / Panther Conductor
4
-
-
Stringing and other associated work of Earth wire/OPGW
5
-
-
Repairing of stub including civil work for leg chimney (excluding Paint)
2
-
-
Jumper Tightning in Transmission Line
-
-
-
Upto 25 Nos.
20
-
-
Beyond 25 and upto 50 Nos.
20
-
-
Beyond 50 Nos.
40
-
-
Mobilization of Labour Gang during supply of gang (One gang consist of 40 Person)
2
-
-
Demobilization of Labour Gang during supply of gang (One gang consist of 40 Person)
2
-
-
Supply of Emergency Gang with T&P for the work not mentioned above like snapping of conductor/earth wire/OPGW/Tower Collapse etc. (One Gang consist of 40 persons)
2
-
-
Rectification of optical Fiber cable (OPGW) including OTDR and splicing
-
-
-
In plain Area
10
-
-
In Hilly Area
10
-
-
Transportation of materials by Small / Medium size truck from transmission central stores Namkum or other GSS to different sites/locations of line within 100KM radius or for line visit.
4
-
-
Measurement of Earth Footing Resistance of Transmission Line Towers at an interval of 1 KM by electrical resistivity method or by ERM Method. (Total Line length- 158.203 KM)
126
-
-
Only Blue colour Column fill by agency.
-
-
-