Jharkhand State Rural Road Development Authority Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand State Rural Road Development Authority - JSRRDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date27 Jan 2023
Closing Date8 Feb 2023
Tender Amount₹ 7,13,94,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Back filling behind abutments, wing walls, and return walls with selected granular material of approved quantity including all leads and lifts, complete as per drg. and MORT&H specifications clause 305 & clause 710.1.4 of IRC:78

137.52

-

749.61

... More
Providing & laying filter media behind abutments, wing walls, return walls and box structures with well packed material to the specified thickness with smaller size towards the soil and bigger size towards the wall complete with all leads and lifts as per drg. and MORT&H specifications clause 305 and clause 710.1.4 of IRC:78.

35.26

-

3070.69

... More
Providing & laying plain cement concrete / Reinforced Cement Concrete in foundations / levelling course including form work but excluding the cost of reinforcement complete as per drg. and MORT&H specifications sections 1500, 1700 and 2100. a) M-10 grade

19.09

-

4611.25

... More
Providing & laying plain cement concrete / Reinforced Cement Concrete in foundations / levelling course including form work but excluding the cost of reinforcement complete as per drg. and MORT&H specifications sections 1500, 1700 and 2100. d) M-30 grade

121.68

-

5925.62

... More
Providing & laying plain cement concrete / Reinforced Cement Concrete in sub-structure including form work but excluding the cost of reinforcement complete as per drg. and MORT&H specifications sections 1500, 1700 & 2200.d) M-30 grade

112.51

-

5958.3

... More
Providing & laying Reinforced Cement Concrete in super-structure including form work but excluding the cost of reinforcement complete as per drg. and MORT&H specifications sections 1500, 1700 & 2300.ii) M-30 grade

78

-

7269.78

... More
Supplying, placing and fixing TMT/HYSD bar reinforcement complete as per drg. and MORT&H specifications section 1600. a) For sub-structure

10.23

-

94183.03

... More
Supplying, placing and fixing TMT/HYSD bar reinforcement complete as per drg. and MORT&H specifications section 1600. b) For super-structure with Crash Barrier/Railing

13.04

-

95613.66

... More
Supplying, placing and fixing TMT/HYSD bar reinforcement complete as per drg. and MORT&H specifications section 1600. c) For foundations

9.59

-

94010.15

... More
Supply & fixing of bearings complete as per drg. and MORT&H specifications section 2000.b) Elastomeric bearing

27000

-

0.84

... More
Providing & fixing of expansion joints complete as per drg. and MORT&H specifications section 2600 a) 50mm vide strip seal joints

8.45

-

10290

... More
Providing & fixing drainage Spouts complete as per drawing & MORT&H Specifications Clause 2705.

10

-

1207.51

... More
Providing & laying 75mm thick wearing course of M30 Concrete as MORT&H specifications section 2700.New wearing coat

195

-

14080.44

... More
Providing cement concrete railing in M-25 grade including form work and reinforcement complete as per drawing & MORT&H Specifications sections 1500, 1600, 1700, 2200 & 2703.

37.5

-

3370.55

... More
Providing & laying plain cement concrete in levelling course under the approach slab complete as per drg. and MORT&H specifications sections 1700, 2100 and 2700.a) M-15 grade

7.61

-

5353.23

... More
Providing & laying reinforced cement concrete in approach slab including form work and excluding reinforcement.a) M-30 grade

15.23

-

11854.17

... More
Providing & laying filter material underneath stone boulder pitching on slopes complete as per drg. and MORT&H specifications section 2500.

13.03

-

3184.44

... More
Providing & laying stone boulder pitching on slopes with cement mortar filled joints in 1:3 (1 cement : 3 coarse sand) complete as per drg. and MORT&H specifications section 2500.

19.55

-

2680.97

... More
Providing weep holes in brick masonry / plain / reinforced concrete abutments, wing walls / return walls etc. with 100mm dia A.C. pipe, extending through the full width of structure with slope of IV:20H towards draining face complete as per drg. and MORT&H specifications clause 2706.

45

-

114.8

... More
Painting of Bridge No. and span arrangement as per drg., IRC:7-1971 and MORT&H specifications section 800.

330

-

80.4

... More
Confirmatory Boring (in Rock)

3

-

2200

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6

1

-

12461.04

... More
PMGSY Logo

2

-

2462.42

... More
Boundary Pillar

60

-

390.2

... More
APPROACH ROAD Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.By Manual Means

0.03

-

57699.09

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

550

-

143.06

... More
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

5

-

143.67

... More
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

90

-

26.4

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.For grading- II Material

30.38

-

2433.81

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.WMM

28.13

-

2745.01

... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.BM

9.38

-

8826.72

... More
Providing and laying semi dense bituminous Concrete with 100-120 TPH batch type hot mixplant producing an average output of 75 tonnesper hour using crushed aggregate of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete as per Technical Specification.SDBC

4.69

-

10496.54

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503.

187.5

-

19.15

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502.

187.5

-

52.4

... More
Maintenance 1st year

1

-

7658.83

... More
Maintenance 2nd year

1

-

16449.43

... More
Maintenance 3rd year

1

-

24482.05

... More
Maintenance 4th year

1

-

31664.01

... More
Maintenance 5th year

1

-

40881.52

... More
(2)Bridge over Ghaghri River at ch-11515 m of Parasi to T01 Khaira Via Darha road, Length - 44.76m, Block -Ichak Dist. - Hazaribagh Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Manual Means Upto 3 m depth

264.16

-

329.65

... More
Drilling inside rock for bore piles

80

-

10000

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm)

240

-

8948.52

... More
RCC Grade M30 in Foundation

201.96

-

5062.68

... More
PCC M15 in Foundation

18.54

-

4039.01

... More
Providing steel liner 10 mm thick for Pile Foundation including fabricating and setting out as per detailed drawing

18.94

-

96046.66

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

44.49

-

96046.66

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M25 Height upto 5m

112.53

-

5385.73

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M25 Height upto 5m

49.82

-

5518.03

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M30 Height Above 5m

0.95

-

5518.03

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

19.58

-

94183.03

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

180

-

114.8

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular Material

1680

-

749.61

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Sandy Material

2609.98

-

998.52

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

238.02

-

2306.21

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

230400

-

0.84

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M 25

191

-

6697.55

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

29.76

-

95613.66

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

29.09

-

13508.21

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

103.44

-

3296.04

... More
Drainage Spouts complete as per drawing and Technical specification

24

-

1207.51

... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211

8.87

-

4619.4

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

19.4

-

11281.94

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

42.25

-

10290

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder

300

-

1952.37

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

570

-

2891.95

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5

105

-

3760.93

... More
Earthwork in excavation in foudation trenches in ordinary soil vide classification of soil item -A) and disposal of earth as obtained to a distance upto 50m including all lifts, levelling, ramming the complete foundation trenches, removing roots of trees,

845.99

-

239.41

... More
Providing PCC (M-150)(1:2:4) in foundataion as per MOSRT & H specification(4rth edition)

169.2

-

4167.88

... More
Providing rough dressed coursed stone masonry work in cement mortar (1:3) in foundation do -do all all complete job as per MOSRT & H specification

397.62

-

3489

... More
Providing rough dressed coursed stone masonry work in cement mortar (1:3) in substructure do -do all all complete job as per MOSRT & H specification

437.1

-

3618.88

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC M20 at top of retaining wall

12.69

-

4854.15

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

338.4

-

599.9

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

272

-

110.48

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means

0.12

-

57699.09

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

2500

-

143.06

... More
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

5

-

143.67

... More
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

360

-

26.4

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material

121.5

-

2582.73

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. WMM

112.5

-

2139.26

... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. BM

37.5

-

8024.25

... More
Providing and laying semi dense bituminous Concrete with 100-120 TPH batch type hot mixplant producing an average output of 75 tonnesper hour using crushed aggregate of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete as per Technical Specification. SDBC

18.75

-

9665.2

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503.

750

-

19.25

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502.

750

-

67.68

... More
Confirmatory Boring (in Soil)

7

-

21428.57

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1.

2

-

12461.04

... More
PMGSY Logo

2

-

2462.42

... More
Boundary Pillar

20

-

599.92

... More
Painting

206.88

-

80.4

... More
Maintenance First Year

1

-

4108.64

... More
Maintenance Second Year

1

-

16143.97

... More
Maintenance Third Year

1

-

27733.14

... More
MaintenanceFourth Year

1

-

32104.74

... More
Maintenance Fifth Year

1

-

23924.94

... More
(3)Bridge Over Kewta River At Ch-2070 M Of Romi To Sonpura Road, Length - 34.26M, Block -Padma, Dist. - HazaribaghEarthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. Ordinary soil Manual Means Upto 3 m depth

264.16

-

329.65

... More
Bored cast-in-situ M35 grade R.C.C. pile excluding reinforcement complete as per drawing and technical specifications and removal of excavated earth with all lifts and lead upto 1000 m. (Pile diameter-1200 mm)

241

-

9064.77

... More
RCC Grade M30 in Foundation

201.96

-

5165.55

... More
PCC M15 in Foundation

18.54

-

4141.89

... More
Providing steel liner 10 mm thick for Pile Foundation including fabricating and setting out as per detailed drawing

9.47

-

96046.66

... More
Supplying, fitting and placing HYSD bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202

44.49

-

96046.66

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M25 Height upto 5m

113.55

-

5488.79

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M30 Height Above 5m

0.95

-

5621.09

... More
Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 RCC M25 Height Above 5m

49.82

-

5621.09

... More
Supplying, fitting and placing HYSD bar reinforcement (Fe 500) in substructrue complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202

19.17

-

94183.03

... More
Providing weepholes in brick masonry/stone masonry, plain/reinforced concrete abutment, wing wall, return wall with 100 mm dia AC pipe extending through the full width of the structures with slope of 1(V):20(H) towards drawing face complete as per drawing and technical specification Clauses 614, 709, 1204.3.7

180

-

114.8

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Granular Material

336

-

749.61

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8 Sandy Material

230.96

-

998.52

... More
Providing and laying filter media with granular crushed aggregates as per specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and providing over the entire surface behind abutment, wing wall, return wall to the full height, compacted to firm condition complete as per drawing and technical specification Clause 1204.3.8

69.04

-

2418.08

... More
Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications.

230400

-

0.84

... More
Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5 RCC M 25

122.4

-

6800.42

... More
Supplying, fitting, and placing HYSD bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002, 1010 and 1202

20.76

-

95613.66

... More
Providing and laying cement concrete wearing course M 30 grade including reinforcement complete as per drawing and technical specifications Clauses 800 and 1206.3

23.47

-

13611.08

... More
Construction of R.C.C. railing of M 25 grade in cast-in-situ with 20 mm nominal size aggregate, true to line and grade, tolerance of vertical railing post not to exceed 1 in 500, centre-to-centre spacing between vertical posts not to exceed 2000 mm as per drawing and technical specifications Clauses 800, 900 and 1208.3

83.44

-

3309.43

... More
Drainage Spouts complete as per drawing and Technical specification

24

-

1207.51

... More
P.C.C. M 15 ordinary grade (1:2.5:5) levelling course below approach slab complete as per drawing and technical specifications Clauses 800 and 1211

8.87

-

4715.41

... More
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification

19.4

-

11384.81

... More
Strip Seal Expansion Joint (Providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70 mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring compliance to the manufacturer's instructions for installation.)

25.35

-

10290

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specifications Clause 1302 Stone/Boulder

24

-

2058.99

... More
Providing and laying of boulder apron laid in wire crates with 4 mm dia GI wire conforming to IS:280 and IS:4826 in 100 mm x 100 mm mesh (woven diagonally) including 10 per cent extra for laps and joints laid with stone boulders weighing not less than 25 kg each as per drawing and technical specifications Clause 1301

76

-

2998.64

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5

14

-

3870.66

... More
Earthwork in excavation in foudation trenches in ordinary soil vide classification of soil item -A) and disposal of earth as obtained to a distance upto 50m including all lifts, levelling, ramming the complete foundation trenches, removing roots of trees,

120

-

329.65

... More
Providing PCC (M-150)(1:2:4) in foundataion as per MOSRT & H specification(4rth edition)

24

-

5054.89

... More
Providing rough dressed coursed stone masonry work in cement mortar (1:3) in foundation do -do all all complete job as per MOSRT & H specification

56.4

-

4249.17

... More
Providing rough dressed coursed stone masonry work in cement mortar (1:3) in substructure do -do all all complete job as per MOSRT & H specification

62

-

4249.17

... More
Plain/Reinforced cement concrete in sub-structure complete as per drawing and technical specifications PCC M20 at top of retaining wall

1.8

-

6231.22

... More
Backfilling behind abutment, wing wall and return wall complete as per drawings & technical specification Clause 1204.3.8

48

-

749.61

... More
Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment, wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications

30

-

114.8

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. By Manual Means

0.09

-

57699.09

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

1005

-

143.06

... More
Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

5

-

143.67

... More
Loosening of the ground upto a level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

270

-

26.4

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material

91.13

-

2709.18

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406. WMM

84.38

-

2244.87

... More
Providing and laying bituminous macadam with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504. BM

28.13

-

8149.44

... More
Providing and laying semi dense bituminous Concrete with 100-120 TPH batch type hot mixplant producing an average output of 75 tonnesper hour using crushed aggregate of specified grading, premixed with bituminous binder @ 4.5 to 5 percent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tendem rollers to achieve the desired compaction as per MORTH specification clause No. 508 complete as per Technical Specification. SDBC

14.06

-

9797.98

... More
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion pressure distributor at the rate of 0.30 to 0.35 kg per sqm on the prepared non-bituminous surfaces (cement concrete pavement) cleaned with Hydraulic broom as per Technical Specification Clause 503.

562.5

-

19.27

... More
Providing and applying primer coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 1.2-1.5 kg/sqm using mechanical means as per Technical Specification Clause 502.

562.5

-

68.49

... More
Confirmatory Boring (in Soil)

3

-

70000

... More
Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1.

2

-

12461.04

... More
PMGSY Logo

2

-

2462.42

... More
Boundary Pillar

20

-

602

... More
Painting

166.88

-

80.4

... More
Maintenance First Year

1

-

3473.85

... More
Maintenance Second Year

1

-

11933.62

... More
Maintenance Third Year

1

-

20049.99

... More
MaintenanceFourth Year

1

-

23507.13

... More
Maintenance Fifth Year

1

-

57136.85

... More
GST @ 18%

1

-

18

... More
Labour Cess @ 1%

1

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.