Jharkhand State Rural Road Development Authority Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand State Rural Road Development Authority - JSRRDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date1 Feb 2023
Closing Date11 Feb 2023
Tender Amount₹ 51,23,88,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

8019.48

-

143.67

... More
Construction of embankment with material obtained from Road way cuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

8019.48

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

12042.9

-

98.43

... More
(Lead upto 250m))

12042.9

-

144.38

... More
Lead from 250m to 500m

16057.2

-

190.33

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

1166.48

-

1944.55

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

1166.63

-

2562.39

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

9828.51

-

3308.26

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

39314.25

-

116.79

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

47091.75

-

53.11

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

47091.75

-

17.9

... More
Providing and laying bituminous macadam( replacing bitumen by 8% with waste plastic ) with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.

388.03

-

8332.31

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

1412.75

-

11210.63

... More
i) 5th km stone (Precast)

2

-

3299.28

... More
ii) Ordinary Kilometer Stone (Precast)

12

-

1988.73

... More
iii) 200 m stone (Precast)

52

-

589.49

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

9

-

11067.18

... More
600 mm equilateral & triangle

61

-

3980.28

... More
600 mm circular

6

-

5298.11

... More
600 mm x 450 mm rectangular

12

-

5163.22

... More
900 mm side octagon, OR

2

-

9334.61

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

6

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

2594

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

50

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

562.5

-

60

... More
Painting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

24

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

424

-

574.65

... More
QUANTITY FOR NEW H.P. CULVERTEarth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

506.57

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

78.12

-

4677.51

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

573.63

-

4176.12

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

127.5

-

5985.72

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

350.88

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

1120.15

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

225.42

-

54.19

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

423.55

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

6.27

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

63.29

-

4677.51

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.

270.38

-

4024.87

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

131.31

-

4176.12

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

24.42

-

5445.72

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

23.04

-

6363.86

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

3.08

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

75

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

140

-

107.66

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

10

-

890.93

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

390.16

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

8.24

-

828.24

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

65.56

-

4677.51

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

231.42

-

4024.87

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

168.12

-

4176.12

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

18.64

-

5445.72

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

37.16

-

6363.86

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

3.54

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

30

-

46.14

... More
Providing weep holes in abutement :-- Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

84

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

8

-

890.93

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

389.39

-

306.49

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108 - rate as per item No. 11.2 (I) of Chapter 11

21.97

-

828.24

... More
Brick Flat Soling in Foundation & Flooring :-- Brick Flat Soling in foundation Trenches as per drawing and technical specification Clause 1108

219.67

-

328

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

60.79

-

4677.51

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

152.42

-

4024.87

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

100.89

-

4176.12

... More
Plain/reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

19.13

-

5445.72

... More
Providing RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

38.51

-

6363.86

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

4.42

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

22.5

-

46.14

... More
Providing weep holes in abutement :-- Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

30

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

8

-

890.93

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

185.76

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

537.84

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

87.36

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

226.56

-

102.51

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

520.59

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

42.21

-

2377.55

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

56.28

-

4861.43

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

324.11

-

4024.87

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

115.58

-

4176.12

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

6.03

-

5107.68

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

296.48

-

68.88

... More
For 1st Year

1

-

1354822.76

... More
For 2nd Year

1

-

1513031.76

... More
For 3rd Year

1

-

1679502.76

... More
For 4th Year

1

-

2059200.76

... More
For 5th Year

1

-

2149563.76

... More
2.0 MRL16-T05 To NH 01 SUNSET POINT VIA PANDAY PURA (8.575 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

8.58

-

21570.14

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

5.15

-

57699.09

... More
Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

535.09

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

535.09

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

9603.71

-

98.43

... More
(Lead upto 250m))

9603.71

-

144.38

... More
Lead from 250m to 500m

12804.94

-

190.33

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

752.85

-

2141.49

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

697.09

-

2811.86

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

4960.68

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.

19842.71

-

119.16

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

24489.98

-

53.17

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

24489.98

-

17.92

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

230.06

-

8603.4

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

734.7

-

11447

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

351.48

-

2141.49

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

1791.73

-

6984.37

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

10545

-

24.28

... More
i) 5th km stone (Precast)

1

-

3358.05

... More
ii) Ordinary Kilometer Stone (Precast)

9

-

2029.13

... More
iii) 200 m stone (Precast)

35

-

596.67

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

7

-

11105

... More
600 mm equilateral & triangle

42

-

3999.19

... More
600 mm circular

4

-

5317.02

... More
600 mm x 450 mm rectangular

5

-

5182.13

... More
900 mm side octagon, OR

5

-

9353.52

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

427.8

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1305.2

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

30

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

375

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

30

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

216

-

578.23

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

238.38

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

36.76

-

4827.57

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

269.94

-

4447.56

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

60

-

6196.32

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

165.12

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

527.13

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

106.08

-

54.19

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

83.63

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

0.87

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

12.07

-

4827.57

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

53.57

-

4296.31

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

26.04

-

4447.56

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

4.46

-

5614.53

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

3.25

-

6532.67

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.5

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

28

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

315.52

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

927.52

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

61.92

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

179.28

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

21.12

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

69.12

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

28.16

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

78.56

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

128.25

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

20.25

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

27

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

45

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

60

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

6

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

10

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

116.55

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

9.45

-

2649.06

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

12.6

-

5041.49

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

72.56

-

4296.31

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

25.88

-

4447.56

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

1.35

-

5276.49

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

66.38

-

68.88

... More
For 1st Year

1

-

522102.53

... More
For 2nd Year

1

-

591831.53

... More
For 3rd Year

1

-

865232.53

... More
For 4th Year

1

-

1189942.53

... More
For 5th Year

1

-

1250131.53

... More
3. T10- NH01 To SHT03 (Negain) Via Ichak (12.5 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

12.5

-

21570.14

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

7.5

-

57699.09

... More
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 m as per Technical Specification Clause 202.

206.25

-

462.09

... More
Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

535.09

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

535.09

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

9899.97

-

98.43

... More
(Lead upto 250m))

9899.97

-

144.38

... More
Lead from 250m to 500m

13199.96

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

7049.41

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.

28197.94

-

119.16

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

28197.94

-

53.17

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

28197.94

-

17.92

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

845.94

-

11447

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

464.73

-

2141.49

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

3291.17

-

6984.37

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

25150

-

24.28

... More
i) 5th km stone (Precast)

2

-

3358.05

... More
ii) Ordinary Kilometer Stone (Precast)

12

-

2029.13

... More
iii) 200 m stone (Precast)

50

-

596.67

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

9

-

11105

... More
600 mm equilateral & triangle

57

-

3999.19

... More
600 mm circular

6

-

5317.02

... More
600 mm x 450 mm rectangular

10

-

5182.13

... More
900 mm side octagon, OR

5

-

9353.52

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1017

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1501

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

60

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

93.75

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

21

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

440

-

578.23

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

446.97

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

68.93

-

4827.57

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

506.15

-

4447.56

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

112.5

-

5915.52

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

309.6

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

988.37

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

198.9

-

54.19

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

669.06

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

6.95

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

96.53

-

4827.57

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

428.52

-

4296.31

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

208.33

-

4447.56

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

35.71

-

5614.53

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

25.96

-

6532.67

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

3.96

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

120

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

224

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

16

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4827.57

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

4296.31

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

4447.56

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5614.53

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6532.67

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

144.48

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

418.32

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

10.56

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

34.56

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

28.16

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

78.56

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

224.44

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

35.44

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

47.25

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

78.75

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

105

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

10.5

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

17.5

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1.75

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

77.7

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

6.3

-

2649.06

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

8.4

-

5041.49

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

48.38

-

4296.31

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

17.25

-

4447.56

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

0.9

-

5276.49

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

44.25

-

68.88

... More
For 1st Year

1

-

1153211.39

... More
For 2nd Year

1

-

957113.39

... More
For 3rd Year

1

-

1177732.39

... More
For 4th Year

1

-

1507155.39

... More
For 5th Year

1

-

1594844.39

... More
4. T10-NH To SH VIA BANDUA (14.127 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

14.13

-

21511.64

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

8.48

-

57699.09

... More
Compacting original ground supporting subgrade : Loosening of the ground upto level of 300mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Table 300.1 and 300.2 for sub grade construction as per Technical Specification Clause 303.5.2

8377.34

-

22.38

... More
Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

2290.7

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

802.64

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

8536.94

-

98.43

... More
(Lead upto 250m))

8536.94

-

144.38

... More
Lead from 250m to 500m

11382.58

-

190.33

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with tractor mounted grader arrangement on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

4058.8

-

1892.03

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

3758.15

-

2495.86

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

5843.12

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.

23372.62

-

116.57

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

48248.74

-

53.32

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

48248.74

-

17.97

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

1252.72

-

8279.61

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

1447.46

-

11182.05

... More
Construction of Panel concrete ,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Caluse 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capasity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion ,construction joints, applying debonding strips ,primer ,sealant ,dowel bars, near approaches to bridge/ culvert and construction joints, admixture as approved ,curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCC Grade M-30 EachPanel (0.50X0.50) thickness 100 mm

593.12

-

6811.73

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

5220

-

24.28

... More
i) 5th km stone (Precast)

2

-

3290.02

... More
ii) Ordinary Kilometer Stone (Precast)

14

-

1982.36

... More
iii) 200 m stone (Precast)

57

-

588.37

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

10

-

11061.21

... More
600 mm equilateral & triangle

58

-

3977.3

... More
600 mm circular

6

-

5295.13

... More
600 mm x 450 mm rectangular

8

-

5160.23

... More
900 mm side octagon, OR

7

-

9331.62

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

214.8

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

2612.6

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

45

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

468.75

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

18

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

432

-

574.06

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

417.17

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

64.33

-

4653.79

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

472.4

-

4116.28

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

105

-

5747.26

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

288.96

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

922.47

-

151.5

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

185.64

-

54.22

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

83.63

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

0.87

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

12.07

-

4653.79

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

53.57

-

3964.44

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

26.04

-

4116.28

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

4.46

-

5417.1

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

3.25

-

6336.34

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.5

-

88934.94

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

28

-

107.68

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

548.09

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

12.14

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

86.41

-

4653.79

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

354.7

-

3964.44

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

236.36

-

4116.28

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

37.51

-

5417.1

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

48.06

-

6336.34

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

5.48

-

88934.94

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

90

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

240

-

107.68

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

12

-

890.93

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

389.39

-

306.49

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108 - rate as per item No. 11.2 (I) of Chapter 11

21.97

-

828.24

... More
Brick Flat Soling in Foundation & Flooring :-- Brick Flat Soling in foundation Trenches as per drawing and technical specification Clause 1108

219.67

-

328

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

60.79

-

4653.79

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

152.42

-

3964.44

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

100.89

-

4116.28

... More
Plain/reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

19.13

-

5417.1

... More
Providing RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

38.51

-

6336.34

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

4.42

-

88934.94

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

22.5

-

46.14

... More
Providing weep holes in abutement :-- Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

30

-

107.68

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

8

-

890.93

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

103.2

-

151.5

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

298.8

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

21.12

-

151.5

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

69.12

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

87.36

-

151.5

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

226.56

-

102.51

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

155.4

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

12.6

-

2305.14

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

16.8

-

4829.31

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

96.75

-

3964.44

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

34.5

-

4116.28

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

1.8

-

5078.95

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.68

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

88.5

-

69

... More
For 1st Year

1

-

1378502.37

... More
For 2nd Year

1

-

1500081.37

... More
For 3rd Year

1

-

1692522.37

... More
For 4th Year

1

-

2109912.37

... More
For 5th Year

1

-

2209102.37

... More
5. T14-NH To KOYALI VIA LANKA,KOPE (12.832 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

12.83

-

21479.38

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

7.7

-

57699.09

... More
Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

1213.4

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

802.64

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

13737.71

-

98.43

... More
(Lead upto 250m))

13737.71

-

144.38

... More
Lead from 250m to 500m

18316.94

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

8769.96

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, sprayed at the rate of 15 kg per 10 sqm and spreading 11.2 mm crushed stone aggregates @ 0.12 cum per 10 sqm, sweeping the surface for uniform spread of aggregates and surface finished to conform to clause 902.

35079.83

-

116.76

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

35079.83

-

53.35

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

35079.83

-

17.98

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

1052.4

-

11201.12

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

82.72

-

1905.15

... More
Construction of Panel concrete ,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Caluse 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capasity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion ,construction joints, applying debonding strips ,primer ,sealant ,dowel bars, near approaches to bridge/ culvert and construction joints, admixture as approved ,curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCC Grade M-30 EachPanel (0.50X0.50) thickness 100 mm

1654.3

-

6781.81

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

14560

-

24.28

... More
i) 5th km stone (Precast)

2

-

3287.52

... More
ii) Ordinary Kilometer Stone (Precast)

12

-

1980.64

... More
iii) 200 m stone (Precast)

52

-

588.05

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

9

-

11059.62

... More
600 mm equilateral & triangle

46

-

3976.5

... More
600 mm circular

4

-

5294.33

... More
600 mm x 450 mm rectangular

9

-

5159.44

... More
900 mm side octagon, OR

5

-

9330.83

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

588.4

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1864.4

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

25

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

375

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

15

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

232

-

573.93

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

238.38

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

36.76

-

4647.5

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

269.94

-

4121.83

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

60

-

5754.06

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

165.12

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

527.13

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

106.08

-

54.19

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4647.5

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3970.58

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

4121.83

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5411.95

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6330.09

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.68

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

61.92

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

179.28

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

147.84

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

483.84

-

102.51

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

518

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

42

-

2323.24

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

56

-

4825.41

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

322.5

-

3970.58

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

115

-

4121.83

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

6

-

5073.91

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

295

-

68.88

... More
For 1st Year

1

-

1139122.72

... More
For 2nd Year

1

-

1151120.32

... More
For 3rd Year

1

-

1347622.36

... More
For 4th Year

1

-

1732202.12

... More
For 5th Year

1

-

1822262.72

... More
GST @ 18%

1

-

18

... More
Labour Cess @ 1%

1

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.