Jharkhand State Rural Road Development Authority Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand State Rural Road Development Authority - JSRRDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date25 Jan 2023
Closing Date6 Feb 2023
Tender Amount₹ 7,92,91,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Depth between 3m to 6m

320.51

-

391.46

... More
Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

402.94

-

412.06

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification

747.06

-

886.73

... More
PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.)

16.08

-

4967.7

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling

110.21

-

4897.68

... More
PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification

5.26

-

4807.17

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)

356.64

-

6013.76

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)

-

-

-

... More
Height Upto 5m

131.02

-

5605.79

... More
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.

188

-

114.8

... More
Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M 30 RCC T-Beam & Slab (Height between 5m to 10m)

114.5

-

6822.58

... More
Approach Slab (M30 Grade) including reinforcement and formwork complete as per drawing and Technical specification.

15.76

-

11428.48

... More
Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer's instructions for installation.

16.9

-

10290

... More
Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification.

100800

-

0.84

... More
Providing drainage spout complete as per drawing and technical specification

8

-

1207.51

... More
Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins.

50.8

-

3306.68

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification.

14.29

-

13665.51

... More
Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

16.89

-

93986.17

... More
Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

57.74

-

94159.05

... More
Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

17.59

-

95589.68

... More
Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification

499.07

-

2601.57

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications

199.31

-

2155.41

... More
Carrying out confirmatory boring for soil investigation/geotechnical investigation for each foundation as per clause 2400 of MOST Specification.

2

-

15000

... More
Providing and constructing one span service road to reach island location from one pier location to another pier location including Royality for earth @ Rs. 225.00 per m for service Road.

25

-

2644

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.

1920

-

98.43

... More
Compacting original ground supporting embankment (. Rolling with vibratory roller

11.25

-

19.1

... More
Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401)

8.66

-

1744

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

8.44

-

2280.73

... More
Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means)

56.25

-

51.75

... More
Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

56.25

-

18.89

... More
Providing and laying bituminous macadam( replacing bitumen by 8% with waste plastic ) with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.

2.81

-

8102.85

... More
Providing and laying semi dense bituminous concrete ( replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

1.69

-

10244.02

... More
Providing PMGSY LOGO as per drawing and technical specification.

2

-

9814.24

... More
Providing Rectrorefractive sign board as per IRC 67 made of encapsulated lense type reflecting sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thk. Supported on mild steel angle.

2

-

4064.79

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means.

66.8

-

143.67

... More
Sand filling in foundation trenches as per Drawing and Technical specification

6.56

-

1474.84

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification

40.6

-

886.73

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 )

22.34

-

4947.37

... More
Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications.

26.2

-

3959.75

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.

32.6

-

4202.28

... More
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.

36

-

114.8

... More
Pointing with cement mortar (1:3) on stonework in substructure as per Technical specifications

66.39

-

565.6

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping

1.5

-

5956.18

... More
5 YEAR MAINTENANCE WORKS

-

-

-

... More
First Year

1

-

7685.8

... More
Second Year

1

-

11547.5

... More
Third Year

1

-

15409.19

... More
Fourth Year

1

-

11666.74

... More
Fifth Year

1

-

15528.43

... More
2.Construction of HL Bridge Over local Stream on Road MRL03-PCB Road to Ghoragara via Madhudih,Parbahal, Ghaghri at CH-3900 Mtr.

-

-

-

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

-

-

-

... More
Depth upto 3m

890.64

-

329.65

... More
Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

652.82

-

412.06

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification

362.07

-

886.73

... More
PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.)

25.7

-

4999.9

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling

196.99

-

4929.88

... More
PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification

5.26

-

4839.37

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)

481.45

-

6044.91

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)

-

-

-

... More
Height Upto 5m

162.47

-

5636.63

... More
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.

122

-

114.8

... More
Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M 30 RCC T-Beam & Slab (Height between 5m to 10m)

198.24

-

6853.42

... More
Approach Slab (M30 Grade) including reinforcement and formwork complete as per drawing and Technical specification.

15.76

-

11459.33

... More
Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer's instructions for installation.

33.8

-

10290

... More
Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification.

172800

-

0.84

... More
Providing drainage spout complete as per drawing and technical specification

24

-

1207.51

... More
Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins.

102.74

-

3309.28

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification.

28.9

-

13696.36

... More
Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

23.32

-

93986.17

... More
Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

51.77

-

94159.05

... More
Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

31.12

-

95589.68

... More
Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification

299.46

-

2774.23

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications

117.54

-

2191.2

... More
Carrying out confirmatory boring for soil investigation/geotechnical investigation for each foundation as per clause 2400 of MOST Specification.

4

-

20000

... More
Dewatering for Foundation

4

-

25000

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5

1389.11

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 as per Technical Specification Clause 301.5

658.29

-

97.11

... More
Compacting original ground supporting embankment (. Rolling with vibratory roller

112.5

-

19.1

... More
Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401)

86.63

-

1770.04

... More
Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

84.38

-

2311.87

... More
Grading -III (Using Screening Crushable type such as moorum or gravel) (with Vibratory Roller)

-

-

-

... More
Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means)

562.5

-

51.75

... More
Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

562.5

-

14.44

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

28.13

-

8143.29

... More
Providing and laying semi dense bituminous concrete ( replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

16.88

-

10284.95

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications. (Stone / Boulder )

-

-

-

... More
Providing PMGSY LOGO as per drawing and technical specification.

2

-

9814.24

... More
Providing Rectrorefractive sign board as per IRC 67 made of encapsulated lense type reflecting sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thk. Supported on mild steel angle.

2

-

4064.79

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means.

81.5

-

143.67

... More
Sand filling in foundation trenches as per Drawing and Technical specification

8.38

-

1461.91

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification

45.3

-

886.73

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 )

22.34

-

4979.88

... More
Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications.

36.2

-

3992.56

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.

87.16

-

4233.91

... More
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.

36

-

114.8

... More
Pointing with cement mortar (1:3) on stonework in substructure as per Technical specifications

66.39

-

565.6

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping

1.5

-

5987.33

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

283.4

-

127

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 using Concrete Mixer)

14.28

-

4813.38

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)

70.8

-

5331.02

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)

32

-

6041.73

... More
Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

3.54

-

71788.09

... More
Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

3.62

-

73200.09

... More
Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification

72

-

2260.77

... More
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.

120

-

110.48

... More
1st Year Maintenance

1

-

16195.47

... More
2nd Year Maintenance

1

-

24481.15

... More
3rd Year Maintenance

1

-

32766.82

... More
4th Year Maintenance

1

-

25673.56

... More
5th Year Maintenance

1

-

33959.23

... More
3.Construction of HL Bridge Over local Stream on Road T07-Dumardaha to Singhdih via Bandhdih, Bijuliya more at CH-1300 , Length - 50.76 M

-

-

-

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

-

-

-

... More
Depth upto 3m

742.25

-

329.65

... More
Depth between 3m to 6m

495.28

-

391.46

... More
Excavation for structures in ordinary Rock not requiring blasting (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

543.87

-

412.06

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification

612.29

-

886.73

... More
PCC 1:3:6 in foundation (Plain Cement Concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40mm nominal size mechanically mixed, placed in foudation and compacted by vibration including curing for 14 days.)

21.59

-

5098.37

... More
Plain/Reinforced cement concrete in open foundation complete as per drawing and technical specification, (PCC Grade M15) Annular Filling

179.93

-

5028.35

... More
PCC M-15 Grade Levelling Course below Approach Slab complete as per drawing and Technical specification

5.26

-

4937.84

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)

413.93

-

6142.32

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)

-

-

-

... More
Height Upto 5m

123.11

-

5733.07

... More
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and technical specification.

166

-

114.8

... More
Furnishing and placing Reinforcement/ Prestressed cement concrete in Super-Structure a per drawing and Technical specification, RCC Grade M 30 RCC T-Beam & Slab (Height between 5m to 10m)

243.46

-

6949.87

... More
Approach Slab (M30 Grade) including reinforcement and formwork complete as per drawing and Technical specification.

15.76

-

11555.77

... More
Strip Seal Expansion Joint ( providing and laying of a strip seal expansion joint catering to maximum horizontal movement upto 70mm, complete as per approved drawings and standard specifications to be installed by the manufacturer/supplier or their authorised representative ensuring complaince to the manufacturer's instructions for installation.

25.35

-

10290

... More
Supplying, fitting and fixing in position true to line and level Elastomeric bearing confirming to IRC:83 (Part-II) section IX and clause 2005 of MORTH Specifications complete including all accessories as per drawing and technical specification.

115200

-

0.84

... More
Providing drainage spout complete as per drawing and technical specification

16

-

1207.51

... More
Construction of railing of M30 grade in-situ with 20mm nominal size aggregate, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specificatoins.

101.52

-

3317.42

... More
Providing and laying Cement Concrete Wearing Coat M-30 grade including reinforcement complete as per drawing and Technical Specification.

28.55

-

13792.8

... More
Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

19.89

-

93986.17

... More
Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

59.45

-

94159.05

... More
Supplying , fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

20.75

-

95589.68

... More
Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification

431.49

-

2830.17

... More
Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and technical specifications

171.18

-

2244.89

... More
Carrying out confirmatory boring for soil investigation/geotechnical investigation for each foundation as per clause 2400 of MOST Specification.

3

-

20000

... More
Dewatering for Foundation

3

-

25000

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.

964.59

-

43.32

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2.

1082.81

-

97.11

... More
Compacting original ground supporting embankment (. Rolling with vibratory roller

112.5

-

19.1

... More
Granular Sub- Base with coarse graded material (Table 400-2) (Construction of granular sub-base by providing coarse graded material, spreading in uniform layers with motor grader on prepared sruface, mixing by mix in place method with rotavatory at OMC, and compactiing with vibratory roller to achieve the desire density, complete as per clause 401)

86.63

-

1862.63

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

84.38

-

2453.15

... More
Prime Coat (Providing and applying Primer Coat with bitumen emulsion on prepared surface of Granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means)

562.5

-

51.77

... More
Providiing and applying Tack Coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom.

562.5

-

18.89

... More
Providing and laying bituminous macadam( replacing bitumen by 8% with waste plastic ) with hot mix plant using crushed aggregates of grading as per Table 500.4 premixed with bituminous binder, transported to site upto a lead of 1000 m laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled to achieve the desired compaction as per Technical Specification Clause 504.

28.13

-

8205.24

... More
Providing and laying semi dense bituminous concrete ( replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

16.88

-

10348.41

... More
Providing PMGSY LOGO as per drawing and technical specification.

2

-

9814.24

... More
Providing Rectrorefractive sign board as per IRC 67 made of encapsulated lense type reflecting sheeting vide clause 1701.2.3 fixed over aluminium sheeting 1.5 mm thk. Supported on mild steel angle.

2

-

4064.79

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Manual means.

81.5

-

143.67

... More
Sand filling in foundation trenches as per Drawing and Technical specification

8.38

-

1515.6

... More
Back filling behind abutment, wing wall and return wall complete as per drawing and technical specification

45.3

-

886.73

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 )

22.34

-

5079.34

... More
Stone masonry work in cement mortar 1:3 for foundation complete as per drawing and technical specifications.

36.2

-

4041.78

... More
Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and technical specifications.

87.16

-

4281.35

... More
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.

36

-

114.8

... More
Pointing with cement mortar (1:3) on stonework in substructure as per Technical specifications

66.39

-

565.6

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (PCC garde M 20 ) For Coping

1.5

-

6084.74

... More
Excavation for structures in ordinary soil (Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and bockfilling with approved material) Mechanical means

736.76

-

127

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (PCC Grade M15 using Concrete Mixer)

37.8

-

4782.21

... More
Plain/Reinforced cement concrete in Foundation complete as per drawing and technical specification, (RCC Grade M25 using Concrete Mixer)

206.6

-

5292.08

... More
Plain /Reinforced Cement Concrete in Sub-Structure complete as per drawing and technical specifications (RCC M 25 using concrete mixer)

108

-

6003.26

... More
Supplying , fitting and placing un-coated HYSD bar reinforcement in foundation complete as per drawing and technical specifications

11.02

-

71703.04

... More
Supplying , fitting and placing HYSD bar reinforcement in sub-structure complete as per drawing and technical specifications

13.06

-

71856.04

... More
Providing and laying Filter material under pitching in slopes complete as per drawing and technical specification

199.2

-

2176.21

... More
Providing weep hole in Brick, masonary/Plain/Reinforced Cement Concrete abutment, wing wall/returnwall with 100mm dia AC pipe, extending through the full widt of the structure with slope of 1V:20H towards drawing foce. Complete as per drawing and Technical specification.

332

-

110.48

... More
5 YEAR MAINTENANCE WORKS

-

-

-

... More
First Year

1

-

16012.85

... More
Second Year

1

-

24207.22

... More
Third Year

1

-

32401.59

... More
Fourth Year

1

-

25399.63

... More
Fifth Year

1

-

33593.99

... More
GST @ 18%

1

-

18

... More
Labour Cess @ 1%

1

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.