Jharkhand State Rural Road Development Authority Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand State Rural Road Development Authority - JSRRDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 Feb 2023
Closing Date25 Feb 2023
Tender Amount₹ 49,04,93,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Excavation in cutting in soil by manual means with lead up to 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left up to 1.5m and lead up to 50m as per Technical Specification clause 302.3.

674.23

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clau

674.23

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

5819.11

-

98.43

... More
(Lead upto 250m))

5819.11

-

144.38

... More
Lead from 250m to 500m

7759.11

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

4335.71

-

3308.29

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

17342.96

-

114.26

... More
Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

17342.96

-

51.93

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

17342.96

-

17.52

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

520.29

-

10988.4

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

48.21

-

1905.15

... More
Cement Concrete PavementConstruction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

1818.95

-

6755.48

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

2636

-

24.28

... More
i) 5th km stone (Precast)

1

-

3281.94

... More
ii) Ordinary Kilometer Stone (Precast)

8

-

1976.81

... More
iii) 200 m stone (Precast)

29

-

587.35

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

6

-

11056.06

... More
600 mm equilateral & triangle

35

-

3974.72

... More
600 mm circular

7

-

5292.55

... More
600 mm x 450 mm rectangular

8

-

5157.65

... More
900 mm side octagon, OR

8

-

9329.05

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1467.4

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

20

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

65.63

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

42

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

180

-

573.62

... More
HP Culvert-1x1000 mm….................................... Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

357.58

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

55.14

-

4633.35

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

404.92

-

4110.44

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

90

-

5922.36

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

247.68

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

790.69

-

149.84

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

159.12

-

54.17

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

169.42

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.51

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

25.31

-

4633.35

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

108.15

-

3959.73

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

52.52

-

4110.44

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

9.77

-

5398.12

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

9.22

-

6315.72

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.23

-

88910.37

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

30

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

56

-

107.56

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

4

-

890.93

... More
RCC Slab Culvert -------------------------------------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4633.35

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3959.73

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

4110.44

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5398.12

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6315.72

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88910.37

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.56

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Maintanance of Culverts--------------------------------Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

2.95

-

7675.58

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

20.64

-

149.84

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

59.76

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

192.38

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

30.38

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

40.5

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

67.5

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

90

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

9

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

15

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1.5

-

56701.38

... More
For 1st Year

1

-

579405.13

... More
For 2nd Year

1

-

535712.13

... More
For 3rd Year

1

-

656602.13

... More
For 4th Year

1

-

873808.13

... More
For 5th Year

1

-

924487.13

... More
2. MRL27-HUPPU (DASRATH CHOWK) TO BANDA(7.34 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

7.34

-

21523.41

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

4.4

-

57699.09

... More
Excavation in cutting in soil by manual means with lead up to 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left up to 1.5m and lead up to 50m as per Technical Specification clause 302.3.

2314.63

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clau

11.35

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

7514.84

-

98.43

... More
(Lead upto 250m))

7514.84

-

144.38

... More
Lead from 250m to 500m

10019.78

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

4828.12

-

3308.29

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

19312.46

-

113.64

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

19312.46

-

51.92

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

19312.46

-

17.52

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

579.37

-

10926.03

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

392.21

-

1852.63

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including leveling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

1633.26

-

6719.93

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

11065

-

24.28

... More
i) 5th km stone (Precast)

1

-

3280.97

... More
ii) Ordinary Kilometer Stone (Precast)

8

-

1976.16

... More
iii) 200 m stone (Precast)

30

-

587.2

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

6

-

11055.48

... More
600 mm equilateral & triangle

46

-

3974.43

... More
600 mm circular

5

-

5292.26

... More
600 mm x 450 mm rectangular

10

-

5157.37

... More
900 mm side octagon, OR

4

-

9328.76

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1492

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

102

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

127.5

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

55.5

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

244

-

573.45

... More
HP Culvert-1x1000 mm------------------------------------Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

387.37

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

59.74

-

4631.06

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

438.66

-

4071.57

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

97.5

-

5866.65

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

268.32

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

856.58

-

152.17

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

172.38

-

54.14

... More
RCC Slab Culvert--------------------------------------- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

84.71

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

1.25

-

1008.31

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

12.66

-

4631.06

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

54.08

-

3919.27

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

26.26

-

4071.57

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

4.88

-

5387.35

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

4.61

-

6303.85

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.62

-

88893.99

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

28

-

107.71

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

389.39

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

21.97

-

1008.31

... More
Brick Flat Soling in Foundation & Flooring :-- Brick Flat Soling in foundation Trenches as per drawing and technical specification Clause 1108

219.67

-

328

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

60.79

-

4631.06

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

152.42

-

3919.27

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

100.89

-

4071.57

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

19.13

-

5387.35

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

38.51

-

6303.85

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

4.42

-

88893.99

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

22.5

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

30

-

107.71

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

8

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal up to a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

556.85

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

45.15

-

2250.84

... More
Providing M10 (PCC 1:3:6) as leveling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

60.2

-

4801.55

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

346.69

-

3919.27

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

123.63

-

4071.57

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

6.45

-

5052.47

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

11

-

107.71

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

317.13

-

69.06

... More
For 1st Year

1

-

615280.68

... More
For 2nd Year

1

-

595303.68

... More
For 3rd Year

1

-

711322.68

... More
For 4th Year

1

-

930202.68

... More
For 5th Year

1

-

981696.68

... More
3. MRL28-KUSTEYGRHA TO SUTRI (5.33 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

5.33

-

21479.74

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

3.2

-

57699.09

... More
Excavation in cutting in soil by manual means with lead up to 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left up to 1.5m and lead up to 50m as per Technical Specification clause 302.3.

44.25

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clau

44.25

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

4332.88

-

98.43

... More
(Lead upto 250m))

4332.88

-

144.38

... More
Lead from 250m to 500m

5777.18

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

4660.52

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

18642.08

-

113.77

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

18642.08

-

51.91

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

18642.08

-

17.52

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

559.26

-

10940.14

... More
Construction of Panel concrete ,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion ,construction joints, applying debonding strips ,primer ,sealant ,dowel bars, near approaches to bridge/ culvert and construction joints, admixture as approved ,curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCC Grade M-30 EachPanel (0.50X0.50) thickness 100 mm

177.82

-

6699.35

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

1565

-

24.28

... More
i) 5th km stone (Precast)

1

-

3277

... More
ii) Ordinary Kilometer Stone (Precast)

6

-

1973.43

... More
iii) 200 m stone (Precast)

22

-

586.72

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

5

-

11052.92

... More
600 mm equilateral & triangle

53

-

3973.15

... More
600 mm circular

5

-

5290.98

... More
600 mm x 450 mm rectangular

9

-

5156.09

... More
900 mm side octagon, OR

12

-

9327.48

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1053

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

40

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

78.75

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

51

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

180

-

573.25

... More
HP Culvert-1x1000 mm---------------------------------Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

89.39

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

13.79

-

4620.91

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

101.23

-

4073.16

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

22.5

-

5894.47

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

61.92

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

197.67

-

151.02

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

39.78

-

54.12

... More
RCC Slab Culvert-------------------------------------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

254.13

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

3.76

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

37.97

-

4620.91

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

162.23

-

3921.64

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

78.78

-

4073.16

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

14.65

-

5379.15

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

13.82

-

6295.11

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.85

-

88885.8

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

45

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

84

-

107.63

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

6

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4620.91

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3921.64

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

4073.16

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5379.15

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6295.11

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88885.8

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.63

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

2.95

-

7678.69

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

20.64

-

151.02

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

59.76

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

147.49

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

23.29

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

31.05

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

51.75

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

69

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

6.9

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

11.5

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1.15

-

56701.38

... More
For 1st Year

1

-

520474.97

... More
For 2nd Year

1

-

570208.97

... More
For 3rd Year

1

-

640918.97

... More
For 4th Year

1

-

796124.97

... More
For 5th Year

1

-

833526.97

... More
4. MRL12-NH 33 POCHRA TO SUGIA (7.60 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

7.6

-

21416.9

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

4.56

-

57699.09

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

9239.31

-

98.43

... More
(Lead upto 250m))

9239.31

-

144.38

... More
Lead from 250m to 500m

12319.08

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

5345.16

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

21380.63

-

112.06

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

19865.63

-

52.05

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

19865.63

-

17.56

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

595.97

-

10763.76

... More
For Grading II MaterialConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

37.5

-

1695.07

... More
Cement Concrete PavementConstruction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

1113.65

-

6676.43

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

8250

-

24.28

... More
i) 5th km stone (Precast)

1

-

3229.18

... More
ii) Ordinary Kilometer Stone (Precast)

8

-

1940.5

... More
iii) 200 m stone (Precast)

31

-

580.98

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

6

-

11021.99

... More
600 mm equilateral & triangle

48

-

3957.69

... More
600 mm circular

5

-

5275.52

... More
600 mm x 450 mm rectangular

13

-

5140.62

... More
900 mm side octagon, OR

8

-

9312.02

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1452

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

40

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

146.25

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

49.5

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

168

-

570.4

... More
HP Culvert-1x1000 mm --------------------------------Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

178.79

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

27.57

-

4498.16

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

202.46

-

3838.07

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

45

-

5733.18

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

123.84

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

395.35

-

151.03

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

79.56

-

54.27

... More
RCC Slab Culvert---------------------------------------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

933.28

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4498.16

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3686.55

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

3838.07

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5244.75

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6165.62

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88959.51

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.65

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

195.08

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

4.12

-

933.28

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.78

-

4498.16

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

115.71

-

3686.55

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

84.06

-

3838.07

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

9.32

-

5244.75

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

18.58

-

6165.62

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.77

-

88959.51

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

42

-

107.65

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

4

-

890.93

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

94.48

-

7679.42

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

165.12

-

151.03

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

478.08

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

0.72

-

7679.42

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

10.56

-

151.03

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

34.56

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

28.16

-

151.03

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

78.56

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

128.25

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

20.25

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

27

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

45

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

60

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

6

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

10

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

388.5

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

31.5

-

2033.63

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

42

-

4643.08

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

241.88

-

3686.55

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

86.25

-

3838.07

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

4.5

-

4904.56

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

8

-

107.65

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

221.25

-

68.95

... More
For 1st Year

1

-

666422.4

... More
For 2nd Year

1

-

678255.4

... More
For 3rd Year

1

-

789001.4

... More
For 4th Year

1

-

1011111.4

... More
For 5th Year

1

-

1064414.4

... More
5. T06-HIRAK ROAD TO CHHOTKI CHUMBA VIA KANJAGI BUMRI (11.05 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

11.05

-

21469.3

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

6.63

-

57699.09

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

29.03

-

143.67

... More
Construction of embankment with material obtained from Road way cuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

29.03

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

10012.13

-

98.43

... More
(Lead upto 250m))

10012.13

-

144.38

... More
Lead from 250m to 500m

13349.5

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

6578.53

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

26314.13

-

114.4

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

26314.13

-

52.18

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

26314.13

-

17.6

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

789.42

-

10995.98

... More
For Grading II MaterialConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

33.41

-

1878.89

... More
Cement Concrete PavementConstruction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

2348.64

-

6759.21

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

19200

-

24.28

... More
i) 5th km stone (Precast)

2

-

3279.68

... More
ii) Ordinary Kilometer Stone (Precast)

11

-

1975.26

... More
iii) 200 m stone (Precast)

45

-

587.09

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

8

-

11054.58

... More
600 mm equilateral & triangle

44

-

3973.98

... More
600 mm circular

6

-

5291.81

... More
600 mm x 450 mm rectangular

14

-

5156.92

... More
900 mm side octagon, OR

4

-

9328.31

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

2222

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

50

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

210

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

91.5

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

304

-

573.46

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

208.59

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.17

-

4627.49

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

236.2

-

4085.64

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

52.5

-

5775.12

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

144.48

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

461.24

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

92.82

-

54.19

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4627.49

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3934.39

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

4085.64

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5389.44

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6307.58

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88918.56

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

5.76

-

7677.89

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

37.12

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

109.12

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

119.52

-

7677.89

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

185.76

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

537.84

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

4.37

-

7677.89

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

30.08

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

83.36

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

0.72

-

7677.89

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

10.56

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

34.56

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

21.6

-

7677.89

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

146.88

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

391.68

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

14.4

-

7677.89

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

174.72

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

453.12

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

128.25

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

20.25

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

27

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

45

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

60

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

6

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

10

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

259

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

21

-

2287.04

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

28

-

4801.4

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

161.25

-

3934.39

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

57.5

-

4085.64

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

3

-

5051.4

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

6

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

147.5

-

68.88

... More
For 1st Year

1

-

896855.1

... More
For 2nd Year

1

-

840638.1

... More
For 3rd Year

1

-

1022458.1

... More
For 4th Year

1

-

1354444.1

... More
For 5th Year

1

-

1431962.1

... More
6. MRL14-LABGA TO SAUNDA BASTI VIA JAINAGAR (7.802 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

7.8

-

21414.08

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

4.68

-

57699.09

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

430.02

-

143.67

... More
Construction of embankment with material obtained from Road way cuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

29.03

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

6847.11

-

98.43

... More
(Lead upto 250m))

6847.11

-

144.38

... More
Lead from 250m to 500m

9129.48

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

2734

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

10936.01

-

113.65

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

10936.01

-

52.18

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

10936.01

-

17.6

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

328

-

10920.51

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

202.5

-

1813.24

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

2758.54

-

6691.68

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

24375

-

24.28

... More
i) 5th km stone (Precast)

1

-

3255.39

... More
ii) Ordinary Kilometer Stone (Precast)

8

-

1958.55

... More
iii) 200 m stone (Precast)

32

-

584.12

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

6

-

11038.95

... More
600 mm equilateral & triangle

34

-

3966.17

... More
600 mm circular

8

-

5284

... More
600 mm x 450 mm rectangular

11

-

5149.1

... More
900 mm side octagon, OR

8

-

9320.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1566.4

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

40

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

168.75

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

63

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

120

-

572.01

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

208.59

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.17

-

4565.47

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

236.2

-

3984.92

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

52.5

-

5915.37

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

144.48

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

461.24

-

149.92

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

92.82

-

54.19

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

0.72

-

7675.88

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

10.56

-

149.92

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

34.56

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

1.92

-

7675.88

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

28.16

-

149.92

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

78.56

-

102.51

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

256.5

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

40.5

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

54

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

90

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

120

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

12

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

20

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

2

-

56701.38

... More
For 1st Year

1

-

487354.8

... More
For 2nd Year

1

-

338491.8

... More
For 3rd Year

1

-

490691.8

... More
For 4th Year

1

-

731044.8

... More
For 5th Year

1

-

785761.8

... More
7. T10-DURGI TO SANKI VIA MASMOHANA KADRU BARIDIH (9.345 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

9.35

-

21405.76

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

5.61

-

57699.09

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

709.74

-

143.67

... More
Construction of embankment with material obtained from Road way cuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

29.03

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

8135.02

-

98.43

... More
(Lead upto 250m))

8135.02

-

144.38

... More
Lead from 250m to 500m

10846.69

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

6319.98

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

25279.95

-

113.64

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

25279.95

-

52.09

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

25279.95

-

17.57

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

758.38

-

10679.15

... More
For Grading II MaterialConstruction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

433.39

-

1616.28

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

1360.23

-

6575.28

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

12065

-

24.28

... More
i) 5th km stone (Precast)

1

-

3207.74

... More
ii) Ordinary Kilometer Stone (Precast)

10

-

1925.78

... More
iii) 200 m stone (Precast)

38

-

578.31

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

7

-

11008.26

... More
600 mm equilateral & triangle

71

-

3950.82

... More
600 mm circular

8

-

5268.65

... More
600 mm x 450 mm rectangular

17

-

5133.76

... More
900 mm side octagon, OR

8

-

9305.15

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1905

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

20

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

667.5

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

67.5

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

288

-

569.06

... More
HP Culvert-1x1000 mm ------------------------Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

387.37

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

59.74

-

4443.7

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

438.66

-

3736.27

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

97.5

-

5845.54

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

268.32

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

856.58

-

151.5

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

172.38

-

54.22

... More
RCC Slab Culvert-----------------------Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4443.7

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3584.42

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

3736.27

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5180.76

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6099.99

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88934.94

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

107.68

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

778.78

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

43.93

-

828.24

... More
Brick Flat Soling in Foundation & Flooring :-- Brick Flat Soling in foundation Trenches as per drawing and technical specification Clause 1108

439.33

-

328

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

121.58

-

4443.7

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

304.84

-

3584.42

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

201.79

-

3736.27

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

38.26

-

5180.76

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

77.01

-

6099.99

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

8.84

-

88934.94

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

45

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

60

-

107.68

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

16

-

890.93

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

53.16

-

7680.52

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

123.84

-

151.5

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

358.56

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

1.92

-

7680.52

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

28.16

-

151.5

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

78.56

-

102.51

... More
Brick masonry work in cement mortar 1:3 in parapet excluding pointing and plastering as per drawing and technical specifications Clauses 600, 900 and 1208.4

14.4

-

7680.52

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

97.92

-

151.5

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

261.12

-

102.51

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

178.27

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

28.15

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

37.53

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

62.55

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

83.4

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

8.34

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

13.9

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1.39

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

375.55

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

30.45

-

1925.02

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

40.6

-

4577.21

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

233.81

-

3584.42

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

83.38

-

3736.27

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

4.35

-

4842.61

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

8

-

107.68

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

213.88

-

69

... More
For 1st Year

1

-

797265.19

... More
For 2nd Year

1

-

792685.19

... More
For 3rd Year

1

-

931712.19

... More
For 4th Year

1

-

1204778.19

... More
For 5th Year

1

-

1270342.19

... More
8. MRL12-T07 TO BIYONG (5.373 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

5.37

-

21746.85

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

3.22

-

57699.09

... More
Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 mExcavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

0.33

-

143.67

... More
Construction of embankment with material obtained from Road way cuttingConstruction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

0.33

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

3603.36

-

98.43

... More
(Lead upto 250m))

3603.36

-

144.38

... More
Lead from 250m to 500m

4804.48

-

190.33

... More
Stabilization of in-situ (existing pavement crust) or soil or otherwise sub base/ base course up to the required depth by cold in-situ recycling using cement and chemical additives / otherwise: Providing pulverizing, spreading, milling and mixing of chemical additives at the appropriate rate as per job mix design in accordance with IRC-SP-72-2015 , IRC-37-2012 & 2018 and IRC SP 89 (part II) 2018. Cementitious additive @ rate of minimum 5 - 7% and CCS/CS additive should be spread on the existing pavement using a mobile truck mounted containerized cement/ additive spreader with micro processor controlled weighing and spreading system. The additive spreader shall have variable working width sufficient to cover whole pavement lane. The in-situ stabilization process shall be carried out by a mobile and self propelled stabilizer / reclaimer of working width of 2.4 m and with minimum engine horse power of 440 kw with a variable working depth up to 50 cm. The resultant stabilized mix then would be profiled to the required grade, level and thickness using motor grader and the mix would be compacted using 20 tonne pad foot roller in combination with smooth wheel roller to achieve desired proctor density as per IRC 37-2012 & 2018 and complete in all respect and curing with water as required including all materials, labour and machinery etc. The entire in-situ process would be carried out in single pass with milling and pulverising of damaged asphalt pavement / soil/ aggregates / soil-aggregate mixture to the desired depth and with simultaneous addition of additives and water with machine integrated spray bars fited on the wheeled self-propelled and vibratory pad foot roller to achieve the desired proctor density in all respects. The tandem roller be followed by Pneumatic Tyre Roller. The minimum unconfined compressive strength (UCS) of stabilized sub base/ base should be 4.5 to 7 MPa after 7 / 28 days of curing as per IRC-SP-72-2015 , IRC-37-2012 & 2018 . Also durability aspects (wet-dry cycles) of stabilized sub base should be satisfied as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The gradation mixes and materials should be as per IRC 37-2012 & 2018 and IRC SP 89 (part II) 2018. The train of equipments to be used are binder spreader- water Tanker- Additive Truck- Recycler- Padfoot Roller (20 Tonne) + Single Drum Compactor- Grader- Tandom Roller- Pneumatic Tyre Roller (20 Tonne)

3554.6

-

3308.26

... More
Providing and laying a single coat of a stress absorbing membrane over a cracked road surface, with crack width above 9 mm and cracked area above 50 per cent after cleaning with a mechanical broom, using modified binder complying with clause 521, spraye

14218.65

-

113.59

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

14218.65

-

51.98

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

14218.65

-

17.54

... More
Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 to 5.6 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 complete in all respects

426.56

-

10919.89

... More
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader / Tractor mount grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401.

38.66

-

1839.5

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

921.27

-

6808.05

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

8045

-

24.28

... More
i) 5th km stone (Precast)

1

-

3313.2

... More
ii) Ordinary Kilometer Stone (Precast)

6

-

1998.31

... More
iii) 200 m stone (Precast)

22

-

591.16

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

5

-

11076.19

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.2

43

-

3984.79

... More
600 mm circular

8

-

5302.62

... More
600 mm x 450 mm rectangular

7

-

5167.72

... More
900 mm side octagon, OR

6

-

9339.12

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1098.6

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

30

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

255

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

37.5

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

148

-

575.17

... More
HP Culvert 1x0000 mm ----------------------------------Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

238.38

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

36.76

-

4713.24

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

269.94

-

4131.4

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

60

-

5811.65

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

165.12

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

527.13

-

157.56

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

106.08

-

54.16

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

91.35

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.02

-

1233.4

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

14.4

-

4713.24

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

59.12

-

3975.39

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

39.39

-

4131.4

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

6.25

-

5463.08

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

8.01

-

6380.13

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

0.91

-

88902.18

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

40

-

108.09

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

2

-

890.93

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

174.42

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

27.54

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

36.72

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

61.2

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

81.6

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

8.16

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

13.6

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1.36

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

569.8

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

46.2

-

2232.74

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

61.6

-

4881.54

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

354.75

-

3975.39

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

126.5

-

4131.4

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

6.6

-

5133.4

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

11

-

108.09

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

324.5

-

69.74

... More
For 1st Year

1

-

446860.05

... More
For 2nd Year

1

-

432063.05

... More
For 3rd Year

1

-

517559.05

... More
For 4th Year

1

-

677661.05

... More
For 5th Year

1

-

715354.05

... More
GST @ 18%

1

-

18

... More
Labour Cess @ 1%

1

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.