Jharkhand State Rural Road Development Authority Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand State Rural Road Development Authority - JSRRDA Tender

Works
Civil And Construction
Road Construction
Eprocure
Opening Date17 Feb 2023
Closing Date25 Feb 2023
Tender Amount₹ 12,29,65,000 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Scrarifying Existing Bituminous Surface to a Depth of 150 mm and disposal disposal of scrarified materials with a lift upto 3m and lead upto 1000m as per technical specification clause 301.4

15346.88

-

14.08

... More
Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

261.8

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

197.85

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

5537.68

-

98.43

... More
(Lead upto 250m))

5537.68

-

144.38

... More
Lead from 250m to 500m

7383.57

-

190.33

... More
Stabilized Sub-base / Base: Providing, Laying, Spreading and Compacting in-situ/borrow area soil of CBR 5% mixed with 30% GSB Grade-II as per mix design. Application:

220.67

-

1903.14

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

4650.1

-

2479.22

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

31000.69

-

53.37

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

31000.69

-

17.99

... More
Providing and laying bituminous macadam Using Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

1550.03

-

8266.43

... More
Providing and laying semi dense bituminous concrete ( replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

775.02

-

10470.93

... More
Construction of Panel concrete ,plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Caluse 1501.2.2 M 30(Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25mm, mixed in a concrete mixer of not less than 0.2 cum capasity and appropriate weigh batcher using approved mix design ,laid in approved fixed side formwork (steel channel,laying and fixing of 125 micron thick polythene film,wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continous operation including provision of contraction and expansion ,construction joints, applying debonding strips ,primer ,sealant ,dowel bars, near approaches to bridge/ culvert and construction joints, admixture as approved ,curing of concrete slabs for 14 days. Curing compound (where specified) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCC Grade M-30 EachPanel (1.25X1.25) thickness 150 mm

259.63

-

6759.3

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

2285

-

24.28

... More
i) 5th km stone (Precast)

1

-

3279.68

... More
ii) Ordinary Kilometer Stone (Precast)

9

-

1975.26

... More
iii) 200 m stone (Precast)

36

-

587.09

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

7

-

11054.58

... More
600 mm equilateral & triangle

27

-

3973.98

... More
600 mm circular

4

-

5291.81

... More
600 mm x 450 mm rectangular

6

-

5156.92

... More
900 mm side octagon, OR

5

-

9328.31

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

97.4

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1649

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

20

-

3047

... More
Pinting lines dashes, arrow etc on road in two coat on new work with ready mixed road marking paint conforming to IS 164 on between a surface including cleaning of the surface of all dust and other foreign matter.

10

-

95

... More
Painting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

281.25

-

60

... More
Painting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

15

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

120

-

573.46

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

208.59

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.17

-

4627.49

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

236.2

-

4085.64

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

52.5

-

6231.42

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

144.48

-

102.51

... More
Plastering with cement mortar (1:4 ) on Stone Masonry work in sub-structure as per Technical Specifications

461.24

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

92.82

-

54.19

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

227.04

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

657.36

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

30.08

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

83.36

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

10.56

-

150.63

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

34.56

-

102.51

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

266.77

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

21.63

-

2287.04

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

28.84

-

4801.4

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

166.09

-

3934.39

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

59.23

-

4085.64

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

3.09

-

5051.4

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

151.93

-

68.88

... More
For 1st Year

1

-

870974.87

... More
For 2nd Year

1

-

957063.87

... More
For 3rd Year

1

-

1075229.87

... More
For 4th Year

1

-

1335867.87

... More
For 5th Year

1

-

1397950.87

... More
2.MRL19-DURGABADI MORE TO CHAMPA VIA JARHATOLI (7.77 KM)

-

-

-

... More
Providing & Fixing of Working benchmark Pillars 01 nos. per km & 04 Nos. of reference pillars required for 1 Km. as per drawings given and direction of E/I

7.77

-

21411.59

... More
Clearing and Grubbing Road Land ( By manual means) including uprooting wild vegetation , grass ,bushes ,shrubs , saplings and trees of girth upto 300mm , removals of stumps of such trees cut earlier & disposal of unserviceable materials & stacking of serviceable materials to be used or auctioned upto a lead of 1000 m including removal and disposal of top organic soil not exeeding 150mm in thickness as per technical specification - clause 201.1 and direction of E/I

4.66

-

57699.09

... More
Scrarifying Existing Bituminous Surface to a Depth of 150 mm and disposal disposal of scrarified materials with a lift upto 3m and lead upto 1000m as per technical specification clause 301.4

3303.75

-

14.08

... More
Compacting original ground supporting subgrade : Loosening of the ground upto level of 300mm below the subgrade level, watered, graded and compacted in layers to meet requirement of Table 300.1 and 300.2 for sub grade construction as per Technical Specification Clause 303.5.2

5300.08

-

22.38

... More
Excavation in cutting in soil by manual means with lead upto 50m Excavation for roadway in soil using manual means for carrying of cut earth to embankment side with a left upto 1.5m and lead upto 50m as per Technical Specification clause 302.3.

350.83

-

143.67

... More
Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of of Table 300.1 and 300.2 as per Technical specification clause 301.5

350.83

-

43.32

... More
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 250m as per Technical Specification Clause 301.5 Free Lead

7449.34

-

98.43

... More
(Lead upto 250m))

7449.34

-

144.38

... More
Lead from 250m to 500m

9932.45

-

190.33

... More
Stabilized Sub-base : Providing, Laying, Spreading and Compacting 70% in-situ/borrow area soil of CBR ≥ 5% mixed with 30% GSB Grade-II as per mix design. Application: (1) Rip and loosen soil with excavator / tractor operated ripper and scarify with tractor operated rotavator to achieve desired thickness. Mix aggregates/GSB II Material as per mix design with rotavator. (2)Spread Cement (minimum 3% or as per mix design) by weight of soil-aggregate mix as per mix design provided and mix with tractor operated rotavator. (3) Prepare and apply 0.75 kg /cum (By Volume of compacted Mix) organosilane Nanotechnology and 0.75 kg/cum (By Volume of compacted Mix) acrylic copolymer mixed in OMC water (1000 ppm TDS) . Scarify the treated mix with rotavator. (4).Compact the stabilized soil-aggregate-cement base with 8 to 10 tonne vibratory roller to achieve stabilized layer with the desired density and thickness. Rates include all material, labour, hire charges of machinery etc. as per MoRD specifications & direction of Engineer-in-Charge. IRC accreditation of Terrasil is : IRC-24(7)/2017 (ACC-224) and Zycobond is : IRC-24(7)/2017 (ACC-225)

2292.1

-

1857.16

... More
Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406.

3326.37

-

2312.91

... More
Prime CoatProviding and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502

22175.81

-

53.34

... More
Tack CoatProviding and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.3 kg per sqm on the prepared bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503.

22175.81

-

17.98

... More
Providing and laying bituminous macadamUsing Waste Plastic with 100-120 TPH hot mix plant producing an average output of 75 tonnes per hour using crushed aggregates of specified grading premixed with bituminous binder, transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction.

1108.79

-

8086.64

... More
Providing and laying semi dense bituminous concrete ( replacing bitumen by 8% with waste plastic ) with 100-120 TPH batch type HMP producing an average output of 75 tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 4.5 to 5 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 508 complete in all respects.

554.36

-

10287.32

... More
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical

1086.38

-

6616.83

... More
Panel cutting in concrete pavement in square panels of 1.25Mx1.25M (Maximum panel) sizes sawing in straight line up to 1/3rd depth from surface including labour and hireage of cutting machine inclusive of taxes under R & D projects in PMGSY

9575

-

24.28

... More
i) 5th km stone (Precast)

1

-

3238.75

... More
ii) Ordinary Kilometer Stone (Precast)

8

-

1947.12

... More
iii) 200 m stone (Precast)

32

-

582.06

... More
(I)Providing and Fixing 'Logo' of Project Providing and fixing of typical PMGSY informatory sign board with Logo as per MORD specifications and drawing. Three MS Plates of 1.6 mm thick, top and middle plate duly welded with MS flat iron 25mm x 5m size on back on edges. The lower plate will be welded with MS angle iron frame of 25mm x 25mm x 5mm. The angle iron frame of the lower most plate and flat iron frame of middle plate will be welded to 2 nos. 75mm x 75 mm of 12 SWG sheet tubes posts duly embedded in cement concrete M-15 grade blocks of 450mm x 450mm x 600mm, 600mm below ground level. The top most diamond plate will be welded to middle plate by 47mm x 47mm of 12 SWG steel plate tube. All M.S. will be stove enameled on both sides. Lettering and printing arrows, border etc. will be painted with ready mixed synthetic enamel paint of superior quality in required shade and colour. All sections of framed posts and steel tube will be painted with primer and two coats of epoxy paint as per drawing Clause 1701 and Annexure 1700.1

6

-

11028.29

... More
600 mm equilateral & triangle

44

-

3960.84

... More
600 mm circular

10

-

5278.67

... More
600 mm x 450 mm rectangular

10

-

5143.77

... More
900 mm side octagon, OR

5

-

9315.17

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

389

-

535.5

... More
Providing and laying of hot applied thermoplastic compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5 mm is exclusive of surface applied glass beads as per IRC:35 .The finished surface to be level, uniform and free from streaks and holes.

1183

-

510

... More
Type A "W" Metal beam Crash Barrier providing and eracting a "W" Metal beam crash barrier Comprising of 3mm thick corrigated sheet metal beam rail, 70cm above road/ground level, fixed on LSMC series channnel vertical post 150x75x5 mm Spaceed 2m centre to centre, 1.8 m height, 1.1m below ground road level all sheet parts.......

25

-

3047

... More
Painting on TreesPainting on wood surface- providing and applying two coat ready mix paint of approved brand on wood surface after through cleaning of surface to give an even face

375

-

60

... More
Painting on Electric PolesPainting two coats on new concrete surface after filling the surface with synthetic enamel paint in all shades on plastered concrete surface

30

-

64

... More
Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704

296

-

570.96

... More
Earth work in excavation for foundation of structures upto 3.0 m depth as per drawing and technical specification clause 1104

208.59

-

306.49

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.17

-

4523.16

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

236.2

-

3902.37

... More
Providing and laying RCC pipe NP-3 for culverts on first class bedding of PCC M10 material in single row including fixing collar with cement mortar 1:2 but excluding excavation, protection works,backfilling concrete and masonary works in head walls and parapets as per clause 1106

52.5

-

6161.15

... More
Painting on Parapet Wall (Black & White Strips) Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

144.48

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

461.24

-

150.63

... More
Providing 1.5 mm cement punning including curing carriage of water with all leads and lifts as per building specification and direction of E/I

92.82

-

54.16

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

250.9

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

2.61

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

36.2

-

4523.16

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

160.7

-

3751.23

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

78.12

-

3902.37

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

13.39

-

5271.75

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

9.74

-

6188.8

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.49

-

88902.18

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

45

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

84

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

6

-

890.93

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

195.08

-

306.49

... More
Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108.

4.12

-

828.24

... More
Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

32.78

-

4523.16

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

115.71

-

3751.23

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

84.06

-

3902.37

... More
Plain/Reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

9.32

-

5271.75

... More
RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

18.58

-

6188.8

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

1.77

-

88902.18

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

15

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

42

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

4

-

890.93

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

329.09

-

306.49

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108 - rate as per item No. 11.2 (I) of Chapter 11

17.66

-

828.24

... More
Brick Flat Soling in Foundation & Flooring :-- Brick Flat Soling in foundation Trenches as per drawing and technical specification Clause 1108

176.6

-

328

... More
Providing M15 (PCC 1:2.5:5) as levelling course in foundation :-- Providing PCC M 15 concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

47.9

-

4523.16

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

132.75

-

3751.23

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

57.63

-

3902.37

... More
Plain/reinforced cement concrete(M-20) in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204

15.86

-

5271.75

... More
Providing RCC M25 in Deck Slab :-- Providing and laying reinforced cement concrete in superstructure (Deck slab M25) as per drawing and technical specifications Clauses 800, 1205.4, 1205.5

22.03

-

6188.8

... More
Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications

2.87

-

88902.18

... More
Providing and filling joint sealing compound as per drawings and technical specifications with coarse sand and 6 per cent bitumen by weight

22.5

-

46.14

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing

20

-

107.61

... More
Drainage spouts complete as per drawing and technical specifications Clause 1209.

8

-

890.93

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

73.92

-

150.47

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

241.92

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

28.16

-

150.47

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

78.56

-

102.51

... More
Plastering with cement mortar (1:4 ) on brick work in sub-structure as per Technical Specifications

87.36

-

150.47

... More
Painting two coats including primer coat after filling the surface with synthetic enamel paint in all shades on new, plastered / concrete surfaces as per drawing and Technical Specification Clause 1701

226.56

-

102.51

... More
Earth work in excavation of foundation trenches :-- Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

128.25

-

222.59

... More
Sand Filling in Foundation :-- Sand Filling in Foundation Trenches as per drawing and technical specification Clause 1108

20.25

-

412.62

... More
Providing PCC M-15 :-- Providing PCC M 15 (1:2.5:5) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203.

27

-

3723.26

... More
Random Rubble Stone Masonry in 1:3 cement mortar for substructure complete as per drawing & technical specification clauses 702, 704, 1202 and 1204

45

-

3691.62

... More
Pointing with cement mortar (1:3) on stone masonary as per drawing and technical specification Clauses 613.3 and 1204

60

-

52.47

... More
Providing R.C.C. M-15 as coping:-- Providing PCC / RCC M15 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

6

-

3723.26

... More
Providing R.C.C. M-20 as cover slab:-- Providing PCC / RCC M20 (1:2:4) concrete for plain/reinforced concrete in Abutement cap complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

10

-

4383.94

... More
Providing HYSD Bars :-- Supplying, fitting and placing HSYD / TMT bar reinforcement in superstructure complete as per drawings and technical specifications Clauses 1002, 1010 and 1202

1

-

56701.38

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

155.4

-

306.49

... More
Providing and laying pitching on slopes laid over prepared filter media as per drawing and technical specification Clause 1302

12.6

-

2106.03

... More
Providing M10 (PCC 1:3:6) as levelling course in foundation :-- Providing PCC M 10 (1:3:6) concrete for plain concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203

16.8

-

4677.45

... More
Stone Masonary in C.M.(1:4) in Foundation :-- Stone masonry work in cement mortar (CM 1:4) in foundation complete excluding pointing and plastering as per drawing and technical specifications Clauses 602, 603, 604, 1202 & 1203

96.75

-

3751.23

... More
Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204

34.5

-

3902.37

... More
Providing concrete for plain/reinforced concrete M-15 in coping over protection wall complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 P.C.C grade M 15

1.8

-

4934.57

... More
Providing Weepholes in brick masonary , Plain / Reinforced concrete abutement , wing wall , return wall with 100 mm dia AC pipe extending through the full width of the structure with slope of 1V: 20H towards drawing face complete as per drawing and technical specification

1

-

107.61

... More
Pointing with cement mortar (1:3) :-- Pointing with cement mortar (1:3) on Stone Masonry work as per drawing and technical specification Clauses 613.3 and 1204

88.5

-

68.86

... More
For 1st Year

1

-

687212.21

... More
For 2nd Year

1

-

687011.21

... More
For 3rd Year

1

-

805314.21

... More
For 4th Year

1

-

1035902.21

... More
For 5th Year

1

-

1090411.21

... More
GST @ 18%

1

-

18

... More
Labour Cess @ 1%

1

-

1



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.