Jharkhand State Rural Road Development Authority Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand State Rural Road Development Authority - JSRRDA Tender

Works
Eprocure
Opening Date4 Aug 2018
Closing Date14 Aug 2018
Tender Amount₹ 1,12,75,900 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Compacting original ground supporting subgrade: Loosening, of the ground upto level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

540

11118

20.59

... More
Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

-

-

-

... More
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
FREE LEAD

897.11

105894

118.04

... More
Lead Upto 250m to 500m

1345.66

204271

151.8

... More
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 500 m as per Technical Specification Clause 303.1.

540

64281

119.04

... More
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 500 m as per Technical Specification Clause 303.1.

2019.68

309252

153.12

... More
Granular sub-base with well graded materials aggregate Gr - II with 5% Cement stablished (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

272.73

640254

2347.62

... More
Granular sub-base with well graded materials aggregate Gr - III with 5% Cement stablished of unit wieght of material (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

299.73

657602

2194.02

... More
Surface Dressing using Nominal aggregate size 13.2 mm mixing with Bitumen Emulsion By Manual Means Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.

2727.25

327188

119.97

... More
Surface Dressing using Nominal aggregate size 9.5 mm mixing with Bitumen Emulsion By Manual Means Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.

2727.25

300051

110.02

... More
Providing and applying Primer Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

2727.25

118389

43.41

... More
Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per drawing and Technical Specification Clause 1703

-

-

-

... More
(i) 5th Kilometer Stone (precast)

-

-

-

... More
(ii) Kilometer Stone (precast)

-

-

-

... More
(iii) 200m Stone (precast)

3

1279

426.58

... More
TRAFFIC SIGN :- Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm × 47mm × 12 SWG sheet tube firmly fixed to the ground by mean of property designed foundations with M-15 grade cement concrete 450×450×600mm, 600mm below ground level as per approved drawing Clause 1701.2.2 - Cautionary Sign Board

1

1560

1560.85

... More
DIRECTION SIGN :- Providing and erecting direction and place identification semi reflective sign board as per IRC:67 made of 2mm thick MS steel dully stove white colour in front and gray colour on back with red reflective border of 70mm width and required letters and figures with reflective tape engineering grade as per MORD for rural road of required shade and colour supported and welded on 47mmx47mmx12swg square tube of 3050mm height duly strengthened by 25mmx5mm MS flat iron on edges on back firmly concrete 450x450x600mm, 600mm below ground level as per approved drawing clause 1701.

-

-

-

... More
(i) Place (Village) Identification Board

1

2326

2326.26

... More
(ii) Place (Public Importance - School, Health Centre) Identification Board

-

-

-

... More
(iii) Place (Bus Bay) Identification Board

-

-

-

... More
(I) Providing and Fixing 'Logo' of PMGSYproject:- Providing and fixing of typical PMGSY/Bharat Nirman informatory sign board with logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plare duly welded with MS flat iron 25mm x 5mm size on back on edges.

-

-

-

... More
(i) Entrance Point Logo Board

-

-

-

... More
(ii) PMGSY Logo Board

1

9827

9827.99

... More
(iii) Informatory Sign Board

-

-

-

... More
Boundary Pillar cum FI Post : Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 at Sharp curves & high embankment.

1

396

396.64

... More
Citizen Information Board 'A' for Flexible Pavement

1

4247

4247

... More
Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out,construction of shorting and bracing, removal of stumps and other deleterious matte, dressing of sides and bottom and backfilling with approved material.

33.87

6736

198.89

... More
Bedding for Pipe Type B (First Class) Bedding : Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)

4.24

2900

684.63

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in single Row Providing and laying reinforced concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets as per Clause 1106.

7.5

40009

5334.59

... More
Providing and laying boulder soling in foundation with stone boulders of minimum size & weight as per table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications clause 1301.

-

-

-

... More
Plain Cement Concrete M10 (1:3:6 niminal mix) in levelling course below open foundation of Head walls as per drawings & Tech. Specification Clause 1109

3.2

13986

4369.29

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.

34.12

124306

3642.78

... More
Pointing with cement mortar (1:3) on stonework in substructure as per technical specification Clauses 613.4 & 1204

42.25

2122

50.23

... More
Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material.

12.25

2412

196.9

... More
Construction of toe walls for protection of slopes as per drawing and technical specifications Clause 1302.5

23.38

76476

3271.71

... More
Providing PCC M-20 architectural coping on the top of wing wall, return wall etc. complete as per drawing and technical specification Clauses 615, 710 and 1204.3.11

50

16689

333.78

... More
5 YEARS MAINTENANCE COST

-

-

-

... More
1st Year Maintenance cost

1

38092

38092.89

... More
2nd Year Maintenance cost

1

51918

51918.25

... More
3rd Year Maintenance cost

1

65576

65576.2

... More
4th Year Maintenance cost

1

78194

78194.25

... More
5th Year Maintenance cost

1

91351

91351.64

... More
B-L053-L029 TO UPPERTOLI (01.100K.M.)

-

-

-

... More
Setting out Pillars - Providing & fixing of Bench Mark pillars @ four nos. per km as per drawings given. (Size 1.00x0.345x0.345)

1.1

4400

4000

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201.

0.44

16501

37502.61

... More
Compacting original ground supporting subgrade: Loosening, of the ground upto level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

660

13589

20.59

... More
Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

875.31

51345

58.66

... More
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
FREE LEAD

855.52

100985

118.04

... More
Lead Upto 250m to 500m

1283.29

194802

151.8

... More
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 500 m as per Technical Specification Clause 303.1.

660

78566

119.04

... More
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 500 m as per Technical Specification Clause 303.1.

2466.93

377736

153.12

... More
Granular sub-base with well graded materials aggregate Gr - II with 5% Cement stablished (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

332.81

781313

2347.62

... More
Granular sub-base with well graded materials aggregate Gr - III with 5% Cement stablished of unit wieght of material (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

365.81

802596

2194.02

... More
Surface Dressing using Nominal aggregate size 13.2 mm mixing with Bitumen Emulsion By Manual Means Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.

3328.11

399273

119.97

... More
Surface Dressing using Nominal aggregate size 9.5 mm mixing with Bitumen Emulsion By Manual Means Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.

3328.11

366158

110.02

... More
Providing and applying Primer Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

3328.11

144473

43.41

... More
Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per drawing and Technical Specification Clause 1703

-

-

-

... More
(i) 5th Kilometer Stone (precast)

-

-

-

... More
(ii) Kilometer Stone (precast)

1

1529

1529.13

... More
(iii) 200m Stone (precast)

5

2132

426.58

... More
TRAFFIC SIGN :- Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm × 47mm × 12 SWG sheet tube firmly fixed to the ground by mean of property designed foundations with M-15 grade cement concrete 450×450×600mm, 600mm below ground level as per approved drawing Clause 1701.2.2 - Cautionary Sign Board

1

1560

1560.85

... More
DIRECTION SIGN :- Providing and erecting direction and place identification semi reflective sign board as per IRC:67 made of 2mm thick MS steel dully stove white colour in front and gray colour on back with red reflective border of 70mm width and required letters and figures with reflective tape engineering grade as per MORD for rural road of required shade and colour supported and welded on 47mmx47mmx12swg square tube of 3050mm height duly strengthened by 25mmx5mm MS flat iron on edges on back firmly concrete 450x450x600mm, 600mm below ground level as per approved drawing clause 1701.

-

-

-

... More
(i) Place (Village) Identification Board

1

2326

2326.26

... More
(ii) Place (Public Importance - School, Health Centre) Identification Board

1

2326

2326.26

... More
(iii) Place (Bus Bay) Identification Board

-

-

-

... More
(I) Providing and Fixing 'Logo' of PMGSYproject:- Providing and fixing of typical PMGSY/Bharat Nirman informatory sign board with logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plare duly welded with MS flat iron 25mm x 5mm size on back on edges.

-

-

-

... More
(i) Entrance Point Logo Board

-

-

-

... More
(ii) PMGSY Logo Board

1

9827

9827.99

... More
(iii) Informatory Sign Board

-

-

-

... More
Boundary Pillar cum FI Post : Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 at Sharp curves & high embankment.

4

1586

396.64

... More
Citizen Information Board 'A' for Flexible Pavement

1

4247

4247

... More
Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out,construction of shorting and bracing, removal of stumps and other deleterious matte, dressing of sides and bottom and backfilling with approved material.

33.87

6736

198.89

... More
Bedding for Pipe Type B (First Class) Bedding : Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)

4.24

2954

697.37

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in single Row Providing and laying reinforced concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets as per Clause 1106.

7.5

40009

5334.59

... More
Providing and laying boulder soling in foundation with stone boulders of minimum size & weight as per table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications clause 1301.

-

-

-

... More
Plain Cement Concrete M10 (1:3:6 niminal mix) in levelling course below open foundation of Head walls as per drawings & Tech. Specification Clause 1109

3.2

14002

4374.38

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.

34.12

124421

3646.16

... More
Pointing with cement mortar (1:3) on stonework in substructure as per technical specification Clauses 613.4 & 1204

42.25

2123

50.26

... More
5 YEARS MAINTENANCE COST

-

-

-

... More
1st Year Maintenance cost

1

46242

46242.75

... More
2nd Year Maintenance cost

1

63120

63120.3

... More
3rd Year Maintenance cost

1

79792

79792.21

... More
4th Year Maintenance cost

1

95194

95194.15

... More
5th Year Maintenance cost

1

111254

111254.28

... More
C-L051-T04 TO UPPERTOLI (01.100K.M.)

-

-

-

... More
Setting out Pillars - Providing & fixing of Bench Mark pillars @ four nos. per km as per drawings given. (Size 1.00x0.345x0.345)

1.1

4400

4000

... More
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical specification Clause 201.

0.44

16501

37502.61

... More
Compacting original ground supporting subgrade: Loosening, of the ground upto level of 300 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of of Tables 300.1 and 300.2 for subgrade construction as per Technical Specification Clause 303.5.2.

660

13589

20.59

... More
Excavation in Cutting in Soil by manual means with lead upto 50 m Excavation for roadway in soil using manual means for carrying of cut earth to embankment site with a lift upto 1.5 m and lead upto 50 m as per Technical Specification Clause 302.3

846.3

49643

58.66

... More
Construction of Embankment with Material Obtained from Borrow Pits Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5

-

-

-

... More
FREE LEAD

826.16

97519

118.04

... More
Lead Upto 250m to 500m

1239.24

188116

151.8

... More
Construction of earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 500 m as per Technical Specification Clause 303.1.

660

78566

119.04

... More
Construction of subgrade with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 500 m as per Technical Specification Clause 303.1.

2473.16

378690

153.12

... More
Granular sub-base with well graded materials aggregate Gr - II with 5% Cement stablished (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

334.89

786187

2347.62

... More
Granular sub-base with well graded materials aggregate Gr - III with 5% Cement stablished of unit wieght of material (Table 400.13) by mix in place method normal Construction of granular sub-base by providing local material spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at once and compacting with smooth wheel roller to achieve the desired density complete as per Clause 401.4 as per Technical Specification Clause 408.

367.89

807151

2194.02

... More
Surface Dressing using Nominal aggregate size 13.2 mm mixing with Bitumen Emulsion By Manual Means Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.

3348.87

401764

119.97

... More
Surface Dressing using Nominal aggregate size 9.5 mm mixing with Bitumen Emulsion By Manual Means Providing and laying surface dressing as wearing course consisting of a layer of bitumen emulsion laid on the prepared surface, followed by a cover of crushed stone chippings of specified size and rolling with 80-100 kN roller including cleaning the road surface as per Technical Specification Clause 507.

3348.87

368442

110.02

... More
Providing and applying Primer Coat with Bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.90-1.2 kg/sqm using mechanical means as per Technical Specification Clause 502.

3348.87

145374

43.41

... More
Reinforced cement concrete M15 grade kilometer stone/local stone of standard design as per IRC:8 fixing in position including painting and printing, etc. as per drawing and Technical Specification Clause 1703

-

-

-

... More
(i) 5th Kilometer Stone (precast)

-

-

-

... More
(ii) Kilometer Stone (precast)

1

1529

1529.13

... More
(iii) 200m Stone (precast)

5

2132

426.58

... More
TRAFFIC SIGN :- Providing and fixing of semi reflective cautionary, mandatory and informatory sign board as per IRC:67 made of 1.5mm thick MS Sheet duly stove white colour in front and gray colour on back with red reflective border of 65 mm width and required letters and figures with reflective tape engineering grade as per Clause 1701.3.9 of MORD for Rural Roads of required shade and colour supported and welded on 47mm × 47mm × 12 SWG sheet tube firmly fixed to the ground by mean of property designed foundations with M-15 grade cement concrete 450×450×600mm, 600mm below ground level as per approved drawing Clause 1701.2.2 - Cautionary Sign Board

1

1560

1560.85

... More
DIRECTION SIGN :- Providing and erecting direction and place identification semi reflective sign board as per IRC:67 made of 2mm thick MS steel dully stove white colour in front and gray colour on back with red reflective border of 70mm width and required letters and figures with reflective tape engineering grade as per MORD for rural road of required shade and colour supported and welded on 47mmx47mmx12swg square tube of 3050mm height duly strengthened by 25mmx5mm MS flat iron on edges on back firmly concrete 450x450x600mm, 600mm below ground level as per approved drawing clause 1701.

-

-

-

... More
(i) Place (Village) Identification Board

1

2326

2326.26

... More
(ii) Place (Public Importance - School, Health Centre) Identification Board

1

2326

2326.26

... More
(iii) Place (Bus Bay) Identification Board

-

-

-

... More
(I) Providing and Fixing 'Logo' of PMGSYproject:- Providing and fixing of typical PMGSY/Bharat Nirman informatory sign board with logo as per MORD specifications and drawing. Three MS plates of 1.6 mm thick, top and middle plare duly welded with MS flat iron 25mm x 5mm size on back on edges.

-

-

-

... More
(i) Entrance Point Logo Board

-

-

-

... More
(ii) PMGSY Logo Board

1

9827

9827.99

... More
(iii) Informatory Sign Board

-

-

-

... More
Boundary Pillar cum FI Post : Reinforced cement concrete M15 grade boundary pillars/local stone of standard design as per IRC:25, fixed in position including finishing and lettering but excluding painting as per drawing and Technical Specification Clause 1704 at Sharp curves & high embankment.

3

1189

396.64

... More
Citizen Information Board 'A' for Flexible Pavement

1

4247

4247

... More
Excavation for Structures Earthwork in excavation for foundation of structures upto 3 m depth as per drawing and technical specification Clause 1104 includding setting out,construction of shorting and bracing, removal of stumps and other deleterious matte, dressing of sides and bottom and backfilling with approved material.

33.87

6736

198.89

... More
Bedding for Pipe Type B (First Class) Bedding : Laying (First Class) bedding on well compacted sand, moorum or approved granular material as per Clause 1105 (ii)

4.24

2954

697.37

... More
Providing and Laying Reinforced Cement Concrete Pipe NP3 as per design in single Row Providing and laying reinforced concrete pipe NP3 for culverts on first class bedding of granular material in single row including fixing collar with cement mortar 1:2 excluding excavation, protection works, backfilling, concrete and masonry work in head walls and parapets as per Clause 1106.

7.5

40009

5334.59

... More
Providing and laying boulder soling in foundation with stone boulders of minimum size & weight as per table 1300.1, no fragment weighing less than 25 kg laid dry complete as per drawing and technical specifications clause 1301.

-

-

-

... More
Plain Cement Concrete M10 (1:3:6 niminal mix) in levelling course below open foundation of Head walls as per drawings & Tech. Specification Clause 1109

3.2

14002

4374.38

... More
Stone masonry work in cement mortar in foundation complete as per drawing and technical specifications Clauses 702, 704, 1202 & 1203.

34.12

124421

3646.16

... More
Pointing with cement mortar (1:3) on stonework in substructure as per technical specification Clauses 613.4 & 1204

42.25

2123

50.26

... More
5 YEARS MAINTENANCE COST

-

-

-

... More
1st Year Maintenance cost

1

46242

46242.75

... More
2nd Year Maintenance cost

1

63120

63120.3

... More
3rd Year Maintenance cost

1

79792

79792.21

... More
4th Year Maintenance cost

1

95194

95194.15

... More
5th Year Maintenance cost

1

111254

111254.28



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.