Jharkhand Industrial Infrastructure Development Corporation Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Jharkhand Industrial Infrastructure Development Corporation - JIIDC Tender

Works
Eprocure
Opening Date11 Jun 2018
Closing Date29 Jun 2018
Tender Amount₹ 3,81,05,061 
Notes
Download

Costs

Summary

Construction of New PCC Road in santhal Pargana industrial area

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing dry lean cement concrete sub base over aprepared sub graded with coarse and fine aggregate confirming to is 383 the size of coarse aggregate not exceeding 25mm size. Aggregate cement ratio not to exceed 15:1 aggregrade gradation after blending to be as per table 600-1 cement content not to be less than 150 kg/cum optimum moisture content to be determined during trial length construction concrete strength not to be less than 10 mpa at 7 days mixed in abatching plant transported to site laid with a paver with electronic censor compacting with 8-10 tones vibratory roller finishing and curring . 3169 M m x 4.10 m x 0.100mm = 1299.29 cum

1299.29

-

-

... More
Cement concrete pavement / construction of unreinforcement dowel joint cement concrete over prepared surface 43 grade cement not less than 400 kg per cum. Coarse and fine aggregate confirming to IS- 383, maximum size of coarse aggregate not exceeding 25 mm in batching and mixing plant as per approved mixed designed, transported to site lade with a fixed from or slip form paver, spread, compacted finished in a continuous operation including provision of contraction, expansion, construction and longitudinal joints, feeler separation membrane sealant primer joint sealant debonding strip, dowel bar, tie rode ad mixture as approved curing compound finishing to lines and grades as per drawing.

3169

-

-

... More
Earth filling in both side shoulder with compacted by road roller. Filing in foundation trenches in layer not exceeding 150mm thick well watered rammed fully compacted and fine dressed with earth obtained from excavation of foundation trenches with in a lead of 50m and lift of 1.5m all completed as per direction of EI.

3327.45

-

-

... More
carriage of material : cement lead 5 km

1463.05

-

-

... More
sand lead 5 km

2010.73

-

-

... More
b. Stone metal lead 30 km

3624.68

-

-

... More
Stone chips lead 30 km

9458.56

-

-

... More
Kutcha drain Earthwork in excvation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 m including all lifts, leavelling, ramming the foundation trenches, removing roots of trees, shurbs all complete as per approved design, building specification and direction of E/I.

3802.8

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.