Jharkhand Industrial Area Development Authority Tender
Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.
Jharkhand Industrial Area Development Authority Tender
Civil And Construction
Drainage Work
Eprocure
Opening Date14 Feb 2022
Closing Date28 Feb 2022
Tender Amount₹ 2,68,74,992
Costs
EMD
₹ 2,68,800Document Cost
₹ 10,000Tender Fee
Refer Documents
Description
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user
Contact
Tender Id
2022_JIADA_56056_1Bid Award Id
ViewTender No
JIADA/SBD/22/Tetuldanga/ 2021-22Tender Authority
Jharkhand Industrial Area Development Authority ViewPurchaser Address
-Website
http://jharkhandtenders.gov.in
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost
Documents
BOQ Items
... More
Base Course. Wet Mix macadam (Providing ,laying, spreading and compacting grade grade stone aggregate to wet mix macadam specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site, laying in uniform layers with paver in sub-base/ base course on well prepared surface and compacting with vibratry roller to achive the desired density.) Add 1.0% for extra widening at curve & junction improvement.
1880.12
-
-
... More
Prime Coat ( Providing and applying primer coat with bitumen emulsion on prepared surface of granular base including clearing of Road surface and spraying primer at the rate of 0.06kg/sqm using mechanical means).Add 1.0% for extra widening at curve & junction improvement.
6267.05
-
-
... More
Dense Graded Bituminous Macadam (Providing and laying dense bitumen macadam with 100-120TPH batch type HMP producing an avreage output of 75 tonnes per hour using crushed aggregate of specified grading, premixing with bituminous binder @4.0 to 4.5 % by weight of total mix mix and filler , transporting the hot mix to work site, laying with a hydrostatic paver finisher with senser control to the required grade, level and alignment, rolling with smooth wheeled, vibratry and tondem roller to achive the desired compaction as per morth specification clause no 507 complete in all respects.) with VG=30 Grade Bulk Bitumen.Add 1.0% for extra widening at curve & junction improvement.
390.62
-
-
... More
Bituminous Concrete (Providing and laying bituminous concrete with 100-120 TPH batch type hot mix plant producing an avreage output of 75 tonns per hour using crushes aggregates of specified grading, premixing with bituminous binder @ 504 to 5.6 % of mix and filler transporting the hot mix to work site, laying with a hyrostatic paver finisher with sensor control to the required grade, level and alignment rolling with smooth wheeled, vibrating and tandem roller to achive the desired compaction as per morth specification clause No. 509.Comlete ain all respects.) Add 1.0% for extra widening at curve & junction improvement.
240.38
-
-
... More
Tack Caot Providing and applying tack coat with bitumen emulsion using emulsion pressure distributor at the rate of 0.20kg per sqm on the prepared bitumen/ granular surface cleaned with mechanical broom.Add 1.0% for extra widening at curve & junction improvement. Cross Drain.
6267.05
-
-
... More
Excavation for structure (earth work in excavation of foundation of structure as per drawing and technical specication, including setting out, construction of shoring and bracing, removal of stumps and other delterious matter,dressing of side and bottom and backfilling with approved material.)
84
-
-
... More
P.C.C. 1:3:6 in foundation (plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size machanically mixed, placed in foundation and compacted by vibration including curing for dayes.)
6.72
-
-
... More
Plain / Reinforced cement concrete in sub-structure as per drawing and technical specification.M-20 Base slab ,Side wall.
45.6
-
-
... More
Furnishing and placing Reinforced/ Prestressed cement in super-structure as per drawing and Technical specification.M-20 Slab .
16.8
-
-
... More
Supplying fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specification.
5.5
-
-
... More
Brick masonary work in (1:3) in sub-structure comlete excluding pointing and plastering s per drawing and Technical specification Prapaet wall.
1.89
-
-
... More
Plastering with cement mortar (1:3) on brick work in sub-structure as per Technical specification . Top prapet, Side of prapet.
14.28
-
-
... More
Painting two coats after filling the surface with synthetic enemel paint in all sheades on new plasterd concrete surface. 1Mx1M Drain.
14.28
-
-
... More
Earth work in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance upto 50 M. including all lifts, leveling ramming the foundation trenches, removing roots of trees, shrubs all comlete as per approved design, building specication and direction of E/I.
945
-
-
... More
Providing and laying in Position cement concrete of specified grade excluding the cost of centering and shuttering all work up to plinth level 1:2:4( 1cement :Coarse sand (Zone-III):6Graded stone aggregate20)
122.85
-
-
... More
Providing Tor steel reinforcement of 8mm dia. Rods as per approved design and drawing excluding carriage of bars to work site, cutting bending, and binding with annealed wire with cost of wire , removal of rust, placing the rods in position all comlete as per building specification and direction of E/I
49.74
-
-
... More
Centering and Shuttering including strutting, propping etc and removal of form for Fiundation , footing bases of columns etc, for mass concrete. Wall.
5040
-
-
... More
Providing and fixing at or near ground level precast cement concrete in kerbs, edging etc as approved pattern and setting in position with cement mortar 1:3(1cement : 3 Coarse sand ), including the cost of required centering, shuttering complete. 1:1.5:3( 1cement 1.5Coarse sand (zone III) : 3 graded stone aggregate 20mm Nominal Size). Bed, wall.
563.85
-
-
... More
Filling in foundation trenches and plinth in layers not exceeding 150mm. Thick well watered, rammed, fully compacted and fine dressed with earth obtained after cutting within a lead of 50m and lift of 1.5 M all complete as per building specication and direction of E/I.
765
-
-
... More
Carriage of material. Brick lead -8 Km.
0.77
-
-
... More
Cement Lead-10 km.
293.23
-
-
... More
Sand lead -20Km.
331.09
-
-
... More
Stone chips lead 15 Km.
658.86
-
-
... More
Steel Lead -10 K m.
55.24
-
-
... More
GST @ 12%
0.12
-
-
... More
Labour cess @ 1%
0.01
-
-