GAIL India Limited Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

GAIL India Limited - GAIL Tender

Works
Energy, Oil and Gas
Eprocure
Opening Date6 Nov 2024
Closing Soon25 Nov 2024
Tender AmountRefer Documents 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
"Receiving and taking over" as defined in the specifications, handling, loading, transportation and unloading of Owner supplied 3-Layer PE coated and bare linepipes from Owner's designated stack-yard to Contractor's stock yard/workshop/work-site including preliminary activities, preparation of drawings, wherever required for crossing etc. including handling, stacking, stringing on the pipeline Right-of-Use/ pipeline route alignment, carrying out inspection of company supplied materials including linepipes at the time of taking over, laying/ installation of coated linepipes as per specification wherever required depending on site condition including execution of all works, "taking over", handling , including loading and unloading, transportation of Owner supplied materials other than linepipe from Owner's designated place (s) of issue to work site, arrangement of all

-

-

-

... More
Additional lands required for Contractor's storage, fabrication, access for construction, procurement and supply of all materials (except Owner supplied materials), consumables, equipment, labour and other inputs, carrying out all temporary, ancillary, auxiliary works, ready for commissioning of pipeline as per drawings, specifications, other provisions of Contract document and instructions of Engineer-in-charge, including but not limited to carrying out the following works:

-

-

-

... More
Surveying of route and detours required at the time of execution including marking the same in topographical sheet, preparation of construction drawings showing survey details, and submit same to Owner for review / approval.

-

-

-

... More
Staking and installation of construction markers, clearing, fencing, grubbing, full filling all the requirements of various statutory/ environment authorities to the entire satisfaction of concerned authorities. During construction, mehodology of laying of steel pipeline (i.e. open cut/ HDD/ moling without casing) shall be decided as per requirement of various Government statutory/ environment authorities and the same methodology of steel laying shall be binding to the contractor for Authority's entire satisfaction. Grading / clearing of work area and shifting of all obstruction within the ROU/ Pipeline route alignment viz. electrical lines/ poles, telephone line / poles, foreign pipeline, etc. with co-ordination with concerned authorities and obtain permissions from these authorities.

-

-

-

... More
Barricading the pipeline construction area prior to execution of the works as per drawings enclosed with tender document and / or to to the entire satisfaction of Owner / Engineer-in-charge.

-

-

-

... More
Carrying out repairs of pipe defects/ replacement in case of irreparable defects and repairs of defects of pipe coating not attributable to Owner including defects/ damages occurring during transportation / handling.

-

-

-

... More
Stringing of line pipes along pipeline trench / ROU on sand/soft soil bags including all supplies, manpower & machinary etc.

-

-

-

... More
Checking, cleaning, aligning, bending, cutting and bevelling (as required) of pipes for welding and field adjustments including pipe fittings, welding, carrying out non-destructive testing of welds as required including 100% radiography by X-ray and providing all requisite equipment, labour, supervision, materials, films, consumables, all facilities and personnel to process, develop, examine and interpret radiographs and other tests as required, carrying out repairs of weld joints found defective by Engineer-in-Charge, carrying out re-radiography and other tests as required on repaired joints.

-

-

-

... More
Coating of field weld joints, long radius bends (R=3D), elbows, buried fittings and valves etc. including supply of coating materials etc. (i.e. heat shrinkable sleeves and high build epoxy etc.) as per PJS & Technical Specification compatible with 3 layer PE coating material of the line pipe.

-

-

-

... More
Installation of LR Bend (R = 3D) , as per specification wherever required depending on site condition.

-

-

-

... More
For Open cut method:

-

-

-

... More
Trenching to all depths and to a width to accomodate the carrier pipeline during lowering & backfilling by excavation in all types of soils , rockey and slag strata including different type of pavement / footpath / roads etc. including breaking, chiselling or otherwise cutting etc. as required. Excavation of hard rock only, wherever hard rock of single piece exceeding 1.5 meter in any direction within the trecnch dimension with respect to length, width & depth and removal only by pneumatic chisel/ drill/ rock-breaker are payble by separate item rate mentioned elsewhere in the SOR. Storing of excavated soil, reusable materials at designated area as directed by Engineer in charge and to a width to accommodate the pipeline as per the relevant standard/ specification etc. [The minimum depth of the top of pipeline shall be 1.2 meter measured from top of pipeline coating to the top of undisturbed surface of the soil or as per SCC/ relevant code, whichever is higher]. Dewatering of trenches if required as per site condition.

-

-

-

... More
Pipeline laying / installation in a built-up surface / Hard surface/ Slag Surface:Raking up of hard surface of any type including concrete, tiled, brick lined soft/ hard rock which is breakable in pieces manually (without use of pneumatic machine) etc.All tiles/slabs/ curb stones etc. removed during excavation shall be placed properly.

-

-

-

... More
Installation / lowering the pipeline in trench to required depth as per PJS, Technical Specification & drawings and providing required padding over and around the pipeline with sand/graded material approved by Engineer-In-Charge (in rocky areas) including padding around pipeline with suitable soil/sand duly approved by EIC including supply of padding material, backfilling and its compaction to the satisfaction of concerned authorities with excavated earth / borrowed select soil including supply of borrowed select soil/sand duly approved by EIC before backfilling and make ready for restoration to be done by Owner / concerned authorities.

-

-

-

... More
Installation of warning mat on the entire length of the pipeline as per specification. Warning mat should have anti rodent properties.

-

-

-

... More
Supply and installation of slope breakers, wherever required or, as directed by Onwer / Engineer–in–charge.

-

-

-

... More
Crossing the all-foreign pipeline / HT line / cable / any other utilities etc. with necessary concrete / PVC protection including coordination with all agencies and obtaining NOC.

-

-

-

... More
Stabilisations of bank protection alongwith Supply of backfill materials duly approved by EIC for pipeline trench and banks falls under minor water body crossing as per technical specification & Std. Drg., wherever required or, as directed by Owner / EIC.

-

-

-

... More
Training and diversions of streams in steep slope area, wherever required.

-

-

-

... More
For HDD method

-

-

-

... More
Complete work of laying of pipeline in restricted ROU along with adjacent road/nala (if minor road/nala falling under the laying profile and not considered under separate crossing) by HDD method including "Receiving and taking over" owner supplied 3LPE coated line pipes from owner's designated place to issue/dump site(s) and transportation to contractor's stock yard/work site including all handling, loading, uploading, aligning etc. supply of all contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage. Execution of, but not limited to, following works in accordance with specifications and instruction of engineer-in-charge and as per all provision of Contract Document.

-

-

-

... More
Pre-construction survey, necessary cover required over the carrier pipeline, based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of drawings for getting their approval from concerned Authority/Engineer-in-charge, getting work permit/NOC for utlities crossings (if any) encounterd prior to start the execution of work.

-

-

-

... More
Drilling to required depth from top of ground (min 2.0 mtrs.)including maintenance of drill hole in all types of soil, rocky and slag starta, all depth to accommodate the pipeline at all conditions encountered by approved HDD methods for providing minimum cover specified in code/specification or the actual depth as decided by concerned authority, whichever is more.

-

-

-

... More
Laying of the pipeline by the approved HDD method including pipeline string prepration, welding, testing, 100% radiography by X-ray, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for laying etc.

-

-

-

... More
Backfilling of the Pit/ ditch/trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and/or as directed by concerned Authority.

-

-

-

... More
Pigging, Cleaning, Post installation hydrotest, dewatering and tie-in with pipeline at either banks or other adjusant pipeline section maintaining minimum pipeline cover 1.2 to 1.5 meter etc. all other works including pigging, Cleaning, final hydrotesting etc. alongwith mainline works(as mentioned above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document, getting NOC from all concerned authority of the facillities.

-

-

-

... More
For Manual/ Machine Moiling technique (without Casing)

-

-

-

... More
Survey of under ground utilities, execution of the work as per specification, including excavation of pits moling with the hole size not exceeding 20% of the pipe dia, jointing and insertion of carrier pipe, testing & commissioning and restoration of the pits to original condition, submission of As-Built Graph as per specifications and the instruction of Engineer-in-charge.

-

-

-

... More
Carrying out air cleaning, pigging, flushing, cleaning and hydrostatic testing of complete pipeline, supply of required quantity of corrosion inhibitor, if required including pre-testing of carrier pipeline string made for cased crossing, HDD section and other designated sections complete as per specification and approved by Engineer–in–charge to specified pressures indicated elsewhere and duration after stabilization as per specification, providing all equipment, pumps, fittings, instruments, dead weight tester, pressure recorder, thermocouples etc., and services, supervision, labour, consumables, water including supply of corrosion inhibitor, air, etc. as required, locating of leaks and rectification of defect attributable to Contractor (rectification of defects in linepipe material not attributable to contractor shall be paid separately as per other item of schedule of rate), re-testing after rectification, dewatering after successful completion of hydrotesting of entire section and as approved by Engineer-in-Charge.

-

-

-

... More
(Note : Leak detection, its rectification and successfully re-hydrotesting shall be carried out by Contractor with a view that completion of all activity for successful hydrotesting is not inordinately extended, which will hamper the overall project schedule. Further, no extra payment claim shall be entertained for re-hydrotesting and leak detection if defects found attributable to Contractor.

-

-

-

... More
All tieing-in, including the tie-in(s) of the pipeline with the adjacent sections of pipeline including cutting of test header, rebevelling as required, radiography and other NDT examination, joint coating as per specification.

-

-

-

... More
Final clean-up & restoration of right-of-use or area disturbed by contractor including obtaining NOC from respective land owner and statutory authorities during their construction activities for laying of pipeline works and disposal of debris and returning all surplus material to designated disposal areas / storage yard as and backfilling of trench and compaction of the same as per satisfaction of Owner and / Or as directed by Engineer–in–charge.

-

-

-

... More
Restoration of land, facilities and boundary wall etc. and associated facilities dismantled/damaged by the Contractor during construction;

-

-

-

... More
Installation of all burried valves inside the valve pit and making provision to operate the valve.

-

-

-

... More
Protective coating of 1000 micron thick two component (applied with the help of minimum three coats) liquid epoxy including supply of materials duly approved by Owner for all piping valves, fittings, structural steels etc. for buried installation and inside the valve pit as approved by the Engineer-in-charge.

-

-

-

... More
Carrying out all temporary, ancillary, auxiliary works and all incidental works required to make the pipeline ready for pre-commissioning;

-

-

-

... More
Hook-up work with existing pipelines.

-

-

-

... More
Obtaining work permits/ NOC from various statutory authorities having jurisdiction, before and after execution of the work, and complying with all stipulation/conditions/recommendation of the said authorities;

-

-

-

... More
Preparation of as-built drawings, pipe-book and other records as specified in the specifications. SOR shall be read in conjuction with job specific requirements, specifications, standards, drawings and other provision of contract document. All above works line pipe laying and installation all above works for buried pipeline as per following details:

-

-

-

... More
Installation of Coated Line Pipes by open cut / HDD / moiling (without casing) methods as per following details:

-

-

-

... More
Specified dia Thk (mm) Material Coating Type Length of each pipe (mm) NB

-

-

-

... More
For All Type of Soil outside like Mango/Jugsalai Sundarnagar ( Normal soil/ soft soil/hard soil/ rock, without slag) etc. and any other area in East singhbum GA.

-

-

-

... More
100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

11000

-

-

... More
For Rocky / Slag Starta (Inside the city area like Bistupur,sastrinagar, Tata Steel/Tata motor area etc. and any other area in East singhbum GA)

-

-

-

... More
200 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

3000

-

-

... More
150 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

3000

-

-

... More
100 6.4 API 5L Gr. X-52 3 Layer PE Double random Coating (Externally) (approx. 11.5 m to 12.5 m)

2000

-

-

... More
Note:

-

-

-

... More
This item shall be applicable for the underground steel grid main pipeline & branch pipeline including tap-off for distribution pipelines, valves, barred tees, insulating joints, bends (R=3D), flanges & fittings, accessories etc. and including fabrication, NDT, Testing & Installation of SVs (all types), tie-in of valve assembly including radiography of tie-in joints as per Schematic Layout Drawings and technical Specification alongwith aboveground approach pipeline upto Insulating Joint (including installation of aboveground / underground insulating joint) for various stations.

-

-

-

... More
Supply of all valves, flanges, fittings, assorted pipes, barred tees & insulating Joints, LR bend etc. shall be paid by separate item mentioned elsewhere in SOR.

-

-

-

... More
In above item, backfilling of pipeline trench by borrowed select soil duly approved by Owner / EIC shall be paid by separate item mentioned elsewhere in the SOR.

-

-

-

... More
Contractor shall execute any pipeline activities along ROU with specified hard barricading in continious stretch per Std. Drg. and other safety measures.

-

-

-

... More
The lengths of pipelines are tentative. Items except above are covered separately.

-

-

-

... More
A large part of the proposed pipeline route may falls along NH / SH / MDR/ City road / Asphalt Road etc. However, in case of non-availability of ROU along MDR/ Asphalt Road etc., the pipeline route may change and this may also require a new tap-off point at suitable location on Pipeline of M/s GAIL (I) Ltd. This may cause increase / decrease in SOR quantities.

-

-

-

... More
The rates shall be applicable for the work within all locations / region within Jamshedpur Geographical Area (GA).

-

-

-

... More
The above rate is excluding of major crossings by HDD, Boring, moiling (with casing), open cut conventional Method mentioned under separate item.

-

-

-

... More
Contractor shall ensure that no tree/plant cutting shall be carried out during Pipe Line Laying operations.Trenching shall be carried out manually if needed, so as to ensure no damage to plant/tree/water pipe line /telephone line/sewage line/electric cable and other under ground utilities.

-

-

-

... More
For Pipeline laying by opencut / HDD / moiling method - While formulating bid, Bidders are advised to visit the site & familiar themselves with the site condition for actual assessment of extent of laying of the pipeline by open cut / HDD / moiling method and to assess the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.

-

-

-

... More
To lay / install the pipeline multiple section of HDD string may required, however single HDD string length may not be more than 750 mtrs. It is bidder's responsibility to plan and lay the pipeline either by using of above methodology as per site conditions in such a manner so that all associated requirements to complet the pipeline sections in totality such as installation of tap-off points, valves, TCP etc. as per specificaions / OISD & PNGRB requirements.

-

-

-

... More
RESTORATION OF ROADS

-

-

-

... More
Restoration of asphalt / concrete / red stone roads / pavement/ pavor block including compaction of soil, to original condition as per requirement and to the entire satisfaction of EIC and / or concerned Owners having jurisdiction for following thickness.

-

-

-

... More
Restoration of Asphalt road including tack coar with compaction as per MoRTH

50

-

-

... More
Restoration of Concrete road

200

-

-

... More
Restoration of red stone road / footpath / pavement upto 4 inch thickness

240

-

-

... More
BORROWED SELECT EARTH MATHERIAL FOR BACKFILLING

-

-

-

... More
Additional work over and above item 1.0 for supply of specified and approved quality of sand in place of available excavated material and / or other suitable soil as per applicable standards / specifications, including backfilling of excavated trench for specified length after laying and padding of pipeline, including local transportation of such special backfill material over all distances, complete.

800

-

-

... More
RIVER CROSSING (by HDD Method)

-

-

-

... More
Complete work for installation of pipeline by HDD method including "Receiving and taking over" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling, loading, unloading, aligning etc. supply of all Contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage., Execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document.

-

-

-

... More
Pre-construction survey, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.; obtaining historical data/ scour depth (for river) from concerned authority, if required, ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. For road crossings,pre-construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing drawings for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for the crossing as well as utility crossings (if any) encountered during crossing prior to start the execution of work.

-

-

-

... More
In case of road crossing, drilling to required depth from top of road including maintenance of drill hole in all types of soil starta ( ie; soft/hard soil, soft/hard rock/ slag....etc), all depth to accommodate the pipeline at all conditions encountered during road crossing by approved HDD methods for providing minimum cover specified in code/ specification or the actual depth as decided by concerned authority, whichever is more.

-

-

-

... More
Laying of the carrier pipeline (for both water body and road crossing) by the approved HDD method across the crossing including, strings preparation of carrier , welding, testing, 100% radiography by x-ray, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing as per specification etc.

-

-

-

... More
Prepration of string , fabrication and welding as per specification and laying along with carrier pipeline across the crossing as per approved profile.

-

-

-

... More
Backfilling of the Pit/ditch/ trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and /or as directed by Concerned Authority.

-

-

-

... More
Pigging, Cleaning, Post installation hydrotest,dewatering and tie-in with pipeline at either banks etc. all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document; getting NOC from all concerned authority of the facilities crossed.

-

-

-

... More
Details of River Crossings by HDD Method

-

-

-

... More
River Crossing for carrier pipeline of size 150 mm NB x 6.4mm Thk. of API 5L Grade X-52

700

-

-

... More
Note: (i) Crossing width may vary as per site condition. Tenderer are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.

-

-

-

... More
(ii) Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.

-

-

-

... More
(iii) Width of above crossings indicated are tentative and for multiple crossings. This shall be as per requirement at site for crossing at different locations. Tenderer/ Contractor shall not be entitiled for any extra payment due to either location / area constraint and/or placement of higher capacity of rig required for crossing by HDD Method.

-

-

-

... More
(iv) Rate for providing end seal at both ends as per specification is included in above quoted rates

-

-

-

... More
RAIL/ NH by HDD Method

-

-

-

... More
Complete work for installation of pipeline by HDD method including "Receiving and taking over" owner supplied three layer PE coated line pipes from Owner's designated place to issue/ dump site(s) and transportation to Contractor's stock yard/ work shop/ work site including all handling, loading, unloading, aligning etc. supply of all Contractor supplied material including consumables, manpower, equipment, other resources to work site(s) and aquiring the required land for storage., Execution of, but not limited to, following works in accordance with specifications and instruction of Engineer-in-charge and as per all provision of Contract Document.

-

-

-

... More
Pre-construction survey, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing to be obtained from concerned authority, bed strata data including design & detail engineering and making of crossing drawing for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work.; obtaining historical data/ scour depth (for river) from concerned authority, if required, ascertaining under neath soil & strata, necessary cover required over the carrier pipeline from lowest bed level of the stipulated water crossing including design & calculation and detail engineering and making of crossing drawing for getting the approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for water crossings as well as utility crossings (if any) encountered during water crossing prior to start the execution of work. For road crossings,pre-construction survey based on site visit, collection of data (if required) from concerned Authority including design and detail engineering and making of crossing drawings for getting their approval from concerned Authority/ Engineer-in-charge, getting work permit/ NOC for the crossing as well as utility crossings (if any) encountered during crossing prior to start the execution of work.

-

-

-

... More
In case of road crossing, drilling to required depth from top of road including maintenance of drill hole in all types of soil starta ( ie; soft/hard soil, soft/hard rock/ slag....etc), all depth to accommodate the pipeline at all conditions encountered during road crossing by approved HDD methods for providing minimum cover specified in code/ specification or the actual depth as decided by concerned authority, whichever is more.

-

-

-

... More
Laying of the carrier pipeline (for both water body and road crossing) by the approved HDD method across the crossing including, strings preparation of carrier , welding, testing, 100% radiography by x-ray, welding repair and retest, coating of field joints with special type Dirax Heat Shrink Sleeve or equivalent (including supply of coating material) and repair of pipeline coating with special PERP-80 repair patch or equivalent material (including supply of repair patch) as per specification, pre-hydrotest of complete strings made for crossing as per specification etc.

-

-

-

... More
Prepration of string , fabrication and welding as per specification and laying along with carrier pipeline across the crossing as per approved profile.

-

-

-

... More
Backfilling of the Pit/ditch/ trench including restoration and clean-up of area, disposal of drilling fluid & waste etc. to the satisfaction of Engineer-in-charge and /or as directed by Concerned Authority.

-

-

-

... More
Pigging, Cleaning, Post installation hydrotest,dewatering and tie-in with pipeline at either banks etc. all other works including pigging, cleaning, final hydrotesting etc. alongwith mainline works (as mentioned in item no. 1.0 above) required as per specifications, codes, approved drawings, calculations, methods and as directed by Engineer-in-charge and provision of contract document; getting NOC from all concerned authority of the facilities crossed.

-

-

-

... More
Laying of 6" (168.3 mm) OD, 6.4 mm wall thk of API 5L Grade X-52 pipe by HDD Method

200

-

-

... More
Laying of 4" (114.3 mm) OD, 6.4 mm wall thk of API 5L Grade X-52 pipe by HDD Method

400

-

-

... More
Note: (i) Crossing width may vary as per site condition. Tenderer are advised to visit the site for actual assessment of extent of crossing and to access the maximum extent of cover which may have to be provided. Actual string length for HDD shall be as per design calculations so that pipe is not under stress as permitted by codes/ specifications. Final length of string shall be decided after decision of minimum cover requirement by concerned Authority/ Engineer-in-charge.

-

-

-

... More
(ii) Payment for the length of final tied-in carrier pipeline string are inclusive in the above item rate and no separate payment shall be made under other item mentioned elsewhere.

-

-

-

... More
(iii) Width of above crossings indicated are tentative and for multiple crossings. This shall be as per requirement at site for crossing at different locations. Tenderer/ Contractor shall not be entitiled for any extra payment due to either location / area constraint and/or placement of higher capacity of rig required for crossing by HDD Method.

-

-

-

... More
(iv) Rate for providing end seal at both ends as per specification is included in above quoted rates

-

-

-

... More
SUPPLY OF WARNING MAT Supply of warning mat for pipeline as per the technical specification enclosed in the bid document.The material of warning mat shall be of high density polyethylene and non biodegradable type. It shall have non-toxic and anti rodent properties.

-

-

-

... More
8" NB Pipeline

100

-

-

... More
6" NB Pipeline

100

-

-

... More
4" NB Pipeline

100

-

-

... More
REPAIR OF DEFECT IN PIPES (NOT ATTRIBUTED TO CONTRACTOR)

-

-

-

... More
Repair of defects on Owner supplied linepipes of all grades and wall thickness as specified in following items, noted and recorded at the time of "receiving and taking over" by Contractor in the presence of Engineer-in-charge.

-

-

-

... More
Cutting and rebevelling for dents in bevels exceeding 3 mm in depth for pipe sizes:

-

-

-

... More
Specified pipe size

-

-

-

... More
8" NB

20

-

-

... More
6" NB

5

-

-

... More
4" NB

5

-

-

... More
Jack out of dents in bevels ranging between 1 mm and 3 mm in depth for pipe sizes:

-

-

-

... More
Specified pipe size

-

-

-

... More
8" NB

20

-

-

... More
6" NB

5

-

-

... More
4" NB

5

-

-

... More
REPAIR OF COATING DEFECTS (NOT ATTRIBUTED TO CONTRACTOR)

-

-

-

... More
Repair of Holiday in Coating (Noted and recorded at the time of "receiving and taking over")

-

-

-

... More
Supply of all coating repair materials as per requirements of specification to be compatible with line pipe coating material, supply of all consumables, utilities, equipments and all manpower required, pipe cleaning and surface preparation, repairing of coating defects (resulting in holiday) and testing including all handling, transportation, etc. for line pipes, performing all works necessary for the completion of the works stirctly in accordance with relevant specification and instructions of Engineer-In-Charge. This rate shall be applicable per sq. cm of the exposed steel area exposed steel area.

500

-

-

... More
PERMANENT MARKERS

-

-

-

... More
Supply, fabrication and installation of all types of permanent markers along the route including all associated civil works such as excavation in all types of soil, construction in all types of soil, construction of pedestals and grouting with concrete, clearing, supply and application of approved colour and quality of primer and paint, stencil letter cutting for numbers, direction, change etc., restoration of area to original condition and performing all works as per drawing, specification and instruction of engineer-in-charge.

-

-

-

... More
Pipeline RCC boundary / route marker as per drawing

800

-

-

... More
Pipeline warning markers with post & foundations

150

-

-

... More
Pipeline direction marker with post & foundations

50

-

-

... More
LEAK / BURST (ATTRIBUTABLE TO OWNER)

-

-

-

... More
All works for locating leak / burst in Company's supplied material only (occurred during hydro-static testing) including necessary repairing/replacing defective pipe lengths including cutting and out and removing the defective pipe, pre-testing and welding of replacement pipe, NDT of welds, repair and retesting of defective welds, coating/painting of replacement pipe, pretesting the replacement pipe into mainline/branch line, coating/painting of welding joints, cleanup, retesting including cost of all labour materials, consumables and performing all works in accordance with the provisions of the Contract document and as directed by Owner /Engineer-in-charge/ Engineer in-charge

-

-

-

... More
For 8" NB Line

2

-

-

... More
For 6" NB Line

2

-

-

... More
For 4" NB Line

2

-

-

... More
Note:

-

-

-

... More
This rate is applicable for manufacturing defects in Owner supplied material only.

-

-

-

... More
Leak detection, its rectification and successfully re-hydrotesting shall be carried out as per approved procedure by Contractor with a view that completion of all activity for successful hydrotesting is not inordinalely extended which will hamper the overall project schedule.

-

-

-

... More
PRE-COMMISSIONING & COMMISSIONING ASSISTANCE OF ENTIRE UNDERGROUND PIPELINE LENGTH AND STATIONS

-

-

-

... More
Pre-commissioning activities and pre-commissioning checks to the specified acceptance criteria, making the entire pipeline system ready for commissioning, providing assistance during the complete duration of commissioning operations, supply of all equipment, manpower, consumables (including pigs and required quantity of nitrogen for valve operations) materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.

-

-

-

... More
Swabbing of pipeline sections

-

-

-

... More
8" Pipeline

3000

-

-

... More
6" Pipeline

3000

-

-

... More
4" Pipeline

13500

-

-

... More
Notes:- i) Above quantities for various pipelines sections.

-

-

-

... More
ii) For swabbing, a minimum of five (5) runs using a combination of low-density and high-density pigs shall be carried out. Swabbing shall continue until the acceptable limit, as mentioned in the technical specifications, is reached

-

-

-

... More
Complete work of carrying out drying by Vacuum drying / Super air drying / Super dry nitrogen & commissioning of pipeline section including supply of manpower, equipments & consumables (nitrogen reqiured for purging etc.), materials for all temporary works and performing all associated works, complete as per the relevant specifications, other provisions of Contract document and instructions of Engineer-in-Charge.

-

-

-

... More
Drying by Vacuum drying / Super air drying / Super dry nitrogen

-

-

-

... More
8" Pipeline

3000

-

-

... More
6" Pipeline

3900

-

-

... More
4" Pipeline

10000

-

-

... More
Note: The quantities mentioned above for various pipeline sections. Final methodology of drying shall be decided by EIC at the time of execution.

-

-

-

... More
Commissioning assistance / commissioning for underground pipeline length and stations

-

-

-

... More
8" Pipeline

3000

-

-

... More
6" Pipeline

3900

-

-

... More
4" Pipeline

10000

-

-

... More
Note:- The above rates are applicable for no. of pipeline sections. Final methodology of commissioning shall be decided by EIC at the time of execution.

-

-

-

... More
Preservation of Pipeline

-

-

-

... More
Preservation of pipeline sections and associated facilities (in event of delay in ROU acquisition, comissioning, other unforeseen reasons) including supply of nitrogen, all consumables, all equipment, man-power, etc. complete as per the requirements of specifications, other provisions of Contract document and instructions of Engineer-in-charge.

-

-

-

... More
By filling and pressurizing with nitrogen to a pressure of 2 bar(g) for a period of one month.

-

-

-

... More
For 8'' NB Pipeline

3000

-

-

... More
For 6'' NB Pipeline

3900

-

-

... More
For 4" NB Pipeline

10000

-

-

... More
For every additional period of one month or part thereof

-

-

-

... More
For 8" NB Pipeline

3000

-

-

... More
For 6" NB Pipeline

3900

-

-

... More
For 4" NB Pipeline

10000

-

-

... More
Notes: i) The above length is not for a single section but for no. of sections.

-

-

-

... More
ii) All accessrious ie;Two nos. of dished end caps and two nos tappings of 3/4 inches,PG to be considered per section and rate for the same shall be quoted by bidder under this item.

-

-

-

... More
iii) If month is partially complete, payment shall be made on prorata basis.

-

-

-

... More
LONG RADIUS BENDS

-

-

-

... More
Supply of Long Radius Bends (R = 3D) for 8" dia.pipe,x-56 (thk. 6.4 mm) as per specification enclosed in Tender Document.

-

-

-

... More
20° - 30°

30

-

-

... More
31° - 45°

10

-

-

... More
46° - 60°

10

-

-

... More
61° - 90°

10

-

-

... More
Supply of Long Radius Bends (R = 3D) for 6" dia.pipe,x-56 (thk. 6.4 mm) as per specification enclosed in Tender Document.

-

-

-

... More
20° - 30°

30

-

-

... More
31° - 45°

10

-

-

... More
46° - 60°

10

-

-

... More
61° - 90°

10

-

-

... More
Supply of Long Radius Bends (R = 3D) for 4" dia.pipe, X-52 (thk. 6.4 mm) as per specification enclosed in Tender Document.

-

-

-

... More
20° - 30°

30

-

-

... More
31° - 45°

10

-

-

... More
46° - 60°

10

-

-

... More
61° - 90°

10

-

-

... More
Note : The quantities of LR Bends may vary. For final quantity, approval shall be taken by EIC before order. Line pipe shall not be Free Issue to the contractor.

-

-

-

... More
SECTION-B( TCP WORKS )

-

-

-

... More
Design, detail engineering, Manufacturing, Inspection/FAT (Factory acceptance test), supply, Packing, insurance, transportation to site, storage at site, Handling, Transportation, Loading, installation, testing & commissioning of the temporary Cathodic protection system using Mg (Min 5.0 Kg Each) galvanic anodes to protect the external surface of 8" dia x 4 km (appox.), 6" dia x 5 km (appox.) and 4" dia x 10 km (appox.) long 3LPE Coated pipeline against corrosion for a design life of minimum 2 year or till commissioning of existing PCP system whichever is later in the Geographical Area (GA) of Varanasi as per standard specification No.- BR/TS/064 for temporary cathodic protection system, Scope of work, Data Sheets & tender drawings. Scope shall also include but not limited to the following for completion of jobs:

-

-

-

... More
Soil resistivity Survey & soil/water chemical analysis

-

-

-

... More
Measurement of soil resistivity along the right of way of the main pipeline (At 500mtr Interval) & collection of additional data as per specification for corrosion survey BR/TS/065 & applicable NACE standard incuding preperation of Design, detailed engineering, preparation of design document, preparation of Test station schedule & Bill of Material, PCP hook-up/bonding methodology as per the corrosion survey, Chemical analysis of Soil / Water samples and site visit for Cathodic Protection system of pipelines.

10

-

-

... More
Sacrificial anodes- Pre packed Mg/Zn anodes

-

-

-

... More
Prepacked Magnesium/zinc anodes for Carrier/Casing Pipe protection (Min 5.0 Kg Each) as per tender specification (1/2/3/4 Nos. of anodes). The total nos. of anodes shall be calculated as per the corrosion survey, soil chemical analysis, total weight and current requirement of the pipeline section. However, Min one anode is to be installed at every one KM with test station.

20

-

-

... More
Supply, laying, termination, Glanding and ferruling TCP-Cables--The Cables shall be annealed high conductivity, stranded copper conductor, 650/1100V grade, XLPE Insulated & PVC Sheathed in new/existing test stations and junction boxes.

-

-

-

... More
1c x 6 mm2 - Anode tail cable - unarmored

600

-

-

... More
1 core x 6 mm2 - Potential Measurement, TLP to pipeline, armored

600

-

-

... More
1 core x 10 mm2 - current measurement cable & Pipeline to Test station- armored

800

-

-

... More
1 core x 25 mm2 -Bonding, Earthing, Surge diverter, HT line, etc.

200

-

-

... More
SECTION-C( PIPING & MECHANICAL WORKS )

-

-

-

... More
PLANT PIPING & SV STATION (ABOVE & UNDER GROUND)

-

-

-

... More
Transportation including loading, unloading & handling of all piping items from Owner's and/ or Contractor's storage point to work site/ workshop as applicable, complete work of fabrication, erection, painting, testing of pipes, flanges and fittings and making ready for further Commissioning / Start-up of carbon steel piping of all sizes and ratings including supply of all consumables, equipment, manpower and other resources and execution of, but not limited to, the following works in accordance with relevant specifications & scope of work, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Fabrication including cutting, edge preparation, inclusive of grinding the edges of pipes, fittings, flanges etc. to match with the matching edges of uneven/different thickness wherever required, welding, attachment of all pipe fittings like elbows, tees, reducers. Supply of nipples, couplings,caps, plugs, gasket, stud bolts, nuts, U Clamps etc. as required for completion of job.

-

-

-

... More
Fixing/ Installation of weldolets, sockolets, flanges, vent and drain point connection etc., including providing stub-in connections, fabricated fittings and reinforcement pads etc., as required.

-

-

-

... More
Erection including prior cleaning, lifting, placing on pipe sleepers, sv stations, and supports, overhead on racks, skids and at all elevations including installation and carrying out connected activities for all types of valves including supply and fixing of gaskets, studs/ bolts, nuts wherever required for all sizes, levelling, aligning, joining of flanges, blind flanges, connecting with equipment, nozzles, strainers, tie-in with existing piping/facilities, etc. tapping for inline instruments like pressure gauges, thermowells, sample connection, etc.

-

-

-

... More
Preparation of final bill of material based on piping GADs.

-

-

-

... More
Preparation of isometric and fabrication drawings.

-

-

-

... More
Carrying out 100 % Non-destructive testing

-

-

-

... More
Surface preparation before application of primer by means of sand blasting including supply of approved quality of sand, manpower, machineries, tools & tackles to achieve required roughness as per specification and as per instruction of Engineer-in-charge.

-

-

-

... More
Painting of entire system (including aboveground all pipes fittings, flanges and accessories) as per specification BR/TS/039 suitable for corrosive area environment including supply of approved paints and primers, application of primer and paints, indentification lettering/ numbering, colour coding, etc. as specified including rub down & touch up of shop primer or scrapping of shop primer wherever required by COMPANY and providing scafolding for all heights etc.

-

-

-

... More
Cleaning and flushing by water/ compressed air, testing of the systems including hydrostatic, pneumatic and any other type of testing as specified, draining, drying by compressed air/other methods approved by COMPANY.

-

-

-

... More
Precommissioning & making operational all piping system and equipments and provide all necessary assistance in term of supply of man-power, equipment, tools and tackles required amount of nitrogen for purging of entire terminal piping system including equipments etc. to the company during commissioning activities.

-

-

-

... More
Clean-up and restoration of site, preparation of as built drawings, documents and project records; transportation of surplus free issue material to Owner's designated plac(s); completing all works in all respects as per the AFC drawing, specifications, standards and other provisions of Contract and instruction of Engineer-in-charge.

-

-

-

... More
Completion of all such work in all respects as per scope of work and as per drawings, specifications and instructions of the COMPANY and keeping the system ready in all respects for further commissioning and start up.

-

-

-

... More
Hook-up works including making provision for hooking up and carrying out shutdown activities at terminals if necessary.

-

-

-

... More
Complete Carbon Steel Piping Work with painting including all fittings, flanges and supply of all required gaskets, studs bolts & nuts etc. as described under item 2.0 above

-

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-8" NB S40

15

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-6" NB S40

20

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-4" NB S40

30

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-2" NB XS

50

-

-

... More
ASTM A106, Gr. B, Seamless, PE , SIZE-1.5" NB XS

10

-

-

... More
ASTM A106, Gr. B, Seamless, PE, SIZE-1" NB XS

10

-

-

... More
ASTM A106, Gr. B, Seamless, PE , SIZE-3/4" S160

10

-

-

... More
1) Pipe Specification and thickness may vary depending upon availability of pipe. No extra payment shall be made for this. 2) All butt welded fittings end shall generally match with connecting pipe wall thickness. However, in case of misalignment, Contractor shall have to do end preparation without any extra cost. 3) All coupling, nipples etc. as required shall be suplied by contractor but no separate payments shall be made as it is covered under erection rate. 4) NDT of Joints below 2" is to be included in above rate. However, payment of radiography of joints (2" and above) shall be paid seperately under SOR item for RADIOGRAPHY mentioned elsewhere in this SOR.

-

-

-

... More
SUPPLY OF ASSORTED PIPE, FITTINGS AND FLANGES

-

-

-

... More
Complete work of supply of pipes, fittings and flanges including all taxes, duties, transportation and inspection charges but not limited to the following items in accordance with relevant specifications indicated in clause of SCC & scope of work indicated in SCC, drawings, specification and instructions of Engineer-in-charge and as per all provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Handling including lifting, transportation from Contractor Stores to CONTRACTOR's workshop for fabrication and/ or to work site for field fabrication and erection for all piping items supplied by Contractor.

-

-

-

... More
CARBON STEEL PIPES

-

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-8" NB S40

15

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-6" NB S40

20

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-4" NB S40

30

-

-

... More
ASTM A106, Gr. B (Charpy), Seamless, BE , SIZE-2" NB XS

50

-

-

... More
ASTM A106, Gr. B, Seamless, PE , SIZE-1.5" NB XS

10

-

-

... More
ASTM A106, Gr. B, Seamless, PE, SIZE-1" NB XS

10

-

-

... More
ASTM A106, Gr. B, Seamless, PE , SIZE-3/4" S160

10

-

-

... More
FLANGES

-

-

-

... More
Weld Neck (B-16.5, A105(Charpy), 125 AARH, RF) (End Thickness to match pipe thickness)

-

-

-

... More
6" 300#

10

-

-

... More
4" 300#

10

-

-

... More
2" 300#

10

-

-

... More
Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5) 1.5" 300#

10

-

-

... More
Socket Welded (B-16.5, A105, 125 AARH, SW end to B16.5) 3/4" 300#

10

-

-

... More
Blind Flanges (B-16.5, A105 (Charpy), 125 AARH, RF)

-

-

-

... More
8" 300#

10

-

-

... More
6" 300#

10

-

-

... More
4" 300#

10

-

-

... More
2" 300#

10

-

-

... More
3/4" 300#

10

-

-

... More
ELBOW, 90° Elbow (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW / (As per Standard Specification and Data Sheets enclsoed)

-

-

-

... More
8" S80

10

-

-

... More
6" S40

10

-

-

... More
4" S40

10

-

-

... More
2" XS

20

-

-

... More
TEE, Equal Tee (A234, Gr. WPB (Charpy), B-16.9, 1.5D), BW

-

-

-

... More
8" S80

5

-

-

... More
6" S40

5

-

-

... More
4" S40

5

-

-

... More
2" XS

10

-

-

... More
SOCKOLET (A105, SW)/ (As per Standard Specification )

-

-

-

... More
8" x ¾"

5

-

-

... More
6" x ¾"

5

-

-

... More
4" x ¾"

10

-

-

... More
WELDOLET (As per Standard Specification )

-

-

-

... More
8" x 2"

15

-

-

... More
6" x 2"

10

-

-

... More
4"X2"

30

-

-

... More
BARRED TEE (As per Standard Specification)

-

-

-

... More
8" x 4"

5

-

-

... More
6" x 6"

5

-

-

... More
6" x 4"

10

-

-

... More
4" x 4"

5

-

-

... More
4" x 2"

10

-

-

... More
INSULATING JOINTS (As per Standard Specification )

-

-

-

... More
4"

5

-

-

... More
2"

5

-

-

... More
Reducer (As per Standard Specification)

-

-

-

... More
8"x6"

5

-

-

... More
8"x4"

5

-

-

... More
6"x4"

5

-

-

... More
6"X3"

5

-

-

... More
4"X2"

5

-

-

... More
End Caps (As per Standard Specification )

-

-

-

... More
8"

5

-

-

... More
6"

5

-

-

... More
4"

5

-

-

... More
2"

5

-

-

... More
Note:a) All butt welded fittings end shall generally match with connecting pipe wall thickness however in case of misalignment Contractor shall have to do end preparation without any extra cost.

-

-

-

... More
B) All coupling, nipples etc. as required shall be supplied by contractor but no separate payments shall be made as it is covered under erection rate.

-

-

-

... More
Supply of Valves

-

-

-

... More
Complete work of supply of valves including all taxes,duties,transportation and inspection charges but not limited to ,the following items in accordance with relevant Specifications & relevant Data Sheets indicated in scope of work indicated in SCC, drawings, specification and instructions of EIC and as perall provisions of the CONTRACT DOCUMENT.

-

-

-

... More
Plug Valves

-

-

-

... More
BW 2" 300#

10

-

-

... More
Ball Valves

-

-

-

... More
BW, FB 8" 300#

5

-

-

... More
BW, FB 6" 300#

5

-

-

... More
FE, FB 8" 300#

5

-

-

... More
FE, FB 6" 300#

2

-

-

... More
FE, FB 4" 300#

5

-

-

... More
BW, FB 4" 300#

15

-

-

... More
BW, FB 2" 300#

40

-

-

... More
SW, FB 1" 800#

5

-

-

... More
SW, FB ¾" 800#

10

-

-

... More
Globe Valves

-

-

-

... More
FE 2" 300#

15

-

-

... More
ERECTION OF VALVES ( As per P & ID ) (Above Ground)

-

-

-

... More
Handling including lifting and transportation from COMPANY's warehouse to CONTRACTOR'S Stores and/or work site and installation of all types of valves including assembly of valve accessories, (if any) by bolting, threading or welding, supply and insertion of gaskets, nuts & bolts, nipples, etc. at all elevations of pipe sleepers, supports or overhead on racks, equipments nozzle, skid & painting etc. supply of all consumables, manpower, equipment, etc. for completion of all works as per scope of work and as per drawings, specifications and instructions of Engineer-in-charge including servicing/ cleaning of valve wherever requried.

-

-

-

... More
Welded Valves (Full Bore/ Reduced Bore)

-

-

-

... More
8" 300#

5

-

-

... More
6" 300#

5

-

-

... More
4" 300#

15

-

-

... More
2" 300#

40

-

-

... More
Flanged Valves (Full Bore/ Reduced Bore)

-

-

-

... More
8" 300#

5

-

-

... More
6" 300#

2

-

-

... More
4" 300#

5

-

-

... More
2" 300#

15

-

-

... More
Sockolet Welded Valve (Ball / Plug / Valves)

-

-

-

... More
1"

20

-

-

... More
¾"

20

-

-

... More
Note : Erection of underground valves already covered in Mainline SOR Item code A00100

-

-

-

... More
RADIOGRAPHY

-

-

-

... More
Performance of radiographic inspection by gamma radiation as per scope of work and as per specifications in piping of all types and thickness including providing/hiring of all necessary equipments, supply of all consumables, and whatever else even though not expressely mentioned but required to perform the work as per specifications and instructions of Engineer-in-Charge (full circle re-radiography of the repaired joint and additional radiography necessitated due to poor performance of contractor's welder shall be carried out by the Contractor at his own cost and shall not be paid extra by Company). Radiographs shall be submitted to the Engineer-in-Charge for acceptance, whose decision shall be final and binding.

-

-

-

... More
8" NB

30

-

-

... More
6"NB

60

-

-

... More
4"NB

100

-

-

... More
2"NB

150

-

-

... More
FIELD INSTRUMENTS

-

-

-

... More
Supply of Pressure Gauges inclusive of supply of erection accessories as per data sheet.

15

-

-

... More
Supply of Digital Pressure Gauges inclusive of supply of erection accessories.

15

-

-

... More
Installation, Calibration, Testing & Commissioning of Pressure Gauges inclusive of supply of necessary piping materials/tubings alongwith all necessary valves & fittings, fabrication and installation of impulse lines/manifolds & hydraulic testing as per specification.

30

-

-

... More
SECTION-D( CIVIL WORKS )

-

-

-

... More
EARTH WORK IN EXCAVATION/ SITE GRADING AND BACKFILLING

-

-

-

... More
Earth work in excavation /site grading in all kinds of soil including soft rock in any plan dimension up to required depth including backfilling of excavated earth at any location in layers of 300mm and compacted up to 95% to its MDD at all heights and depths. Surplus and unserviceable earth shall be disposed up to any lead in all conditions. Soil to be levelled and neatly dressed complete in all respect as per scope of work, detailed construction drawings, technical specifications and direction of the Engineer-in-Charge.

75

-

-

... More
Note:-

-

-

-

... More
1. This Rate shall be applicable only for excavation which are not included as a part of respective SOR Item.

-

-

-

... More
2.The Contractor shall take into account in his quoted rate the provision for excess excavation required for necessary working space, cutting in slopes etc., which may be required for excavation and other allied works and refilling the side slopes and working space in layers as per requirement.

-

-

-

... More
3.Rate to include cost of all labour, tools, tackles, equipment, hire charges, shoring, bailing and pumping out water as required etc. with all bye works and sundry works complete in all respects.

-

-

-

... More
4.NET CUM of excavated quantity in CUM shall be measured for payment.

-

-

-

... More
5. To be read in conjunction with Particular Job Specification.

-

-

-

... More
BRICK WORK

-

-

-

... More
Providing and laying brick work with brick class designation M-5.0 of IS:1077 in Cement Mortar 1:4 (1cement : 4 sand) in steps, load bearing structures, drains, or at any other location at all depths & height for all leads including providing required finishes, curing, scaffolding, etc., complete as per specifications and drawings with all bye-works as per direction of the Engineer-in-charge.

25

-

-

... More
Note:-

-

-

-

... More
1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade cement (OPC), bricks, finishes, bitumen, other minor construction materials, shuttering, staging, masonry work, excavation, PCC M10, plastering with 15 mm thick cement plaster on exposed faces with 1:4 cement mortar( 1 cement : 4 Sand) , painting with bitumen etc. as per requirement with all bye-works and sundry works complete as per drawings.

-

-

-

... More
2. To be read in conjunction with Particular Job Specification.

-

-

-

... More
PLAIN CEMENT CONCRETE

-

-

-

... More
Supplying and laying plain cement concrete of grade M 10 with stone aggregate 40mm down grade (including shuttering if required) in all types of concrete works including levelling courses below foundations, mass concrete works, chambers, cable trench, under floors and any other locations, at all levels and locations (which are not covered as part of composite items) as per drawings, specifications and directions of the Engineer-in-charge.

25

-

-

... More
Note :-

-

-

-

... More
1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, shuttering in all conditions etc. with all bye works and sundry works.

-

-

-

... More
2. To be read in conjunction with Particular Job Specification.

-

-

-

... More
REINFORCED CEMENT CONCRETE

-

-

-

... More
Providing and laying Reinforced Cement Concrete of grade M-25 with 20mm and down grade crushed stone aggregate in all types of structures like foundations, beam, columns, pedestals, pedestal bases, pipe supports, sleepers, cable trench, RCC retaining wall foundation for boundary wall etc. including excavation, PCC M10 in mud mat, shuttering, construction joints, bitumen painting on surfaces in contact with soil,supplying and fixing MS inserts, finishes etc. at all depths and levels complete as per drawings, specifications and directions of the Engineer-in-charge.

25

-

-

... More
Note :-

-

-

-

... More
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as minimum 43 grade OPC cement including sulphate resistant cement for sub-structures, inserts, bolts, conduits, bitumen, excavation, PCC M-10 in mud mat, other minor construction materials, shuttering , staging, testing of concrete, curing etc. except reinforcement steel with all bye works and sundry works complete.

-

-

-

... More
2. To be read in conjunction with Particular Job Specification.

-

-

-

... More
REINFORCEMENT STEEL

-

-

-

... More
Supplying and Fabricating and Fixing in position HYSD Steel Reinforcements/ TMT Grade Fe-415/Fe 500D conforming to IS1786-2008 at all levels and positions including the Cost of transportation, Straightening, Cutting, Bending, Cranking, Binding, Welding, Provision of necessary Chairs and Spacers, Preparation of bar bending schedule, getting the same approved by EIC etc., complete as per Drawings and Specifications and including Cost of binding wire, Labour etc., all complete in all respects as per scope of work, detailed construction drawings, technical specifications and direction of Engineer-in-charge. The Chairs and Spacer Bars provided will not be measured for payment.

5

-

-

... More
Note :-

-

-

-

... More
1. Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials such as steel Reinforcement, binding wire and other minor construction materials, testing etc. all bye works and sundry works.

-

-

-

... More
2. Chairs, Laps, Spacers, Wastage etc. shall be to contractor's account.

-

-

-

... More
3. To be read in conjunction with Particular Job Specification.

-

-

-

... More
CONCRETE PAVEMENT

-

-

-

... More
Providing and laying reinforced cement concrete pavement 150 mm thick in M-25 grade with 20 mm and down grade crushed stone aggregate in pavement, including earthwork in excavation, preparation of base (i.e. compacted subgrade, 200 thk sand and 100 thk PCC M-10 grade), leaving pockets if necessary, making recess, projections, fixing inserts conduit pipes (GI, PVC, HDPE, etc.) laying in alternate panels, filling the gaps between the panels with bitumen sand mix filler material etc., making slopes, finishing edges, leaving bars for pedestals & sleepers including providing sand fill isolation , shuttering, providing and fixing reinforcing steel, curing, chipping and modification works etc. as specified in any shape, thickness, position and finishing the top surface smooth as per requirement etc. all complete as per drawings, specifications and directions of the Engineer-in-charge.

-

-

-

... More
150mm thick in Pavements in Process Areas (Type - I)

500

-

-

... More
Note :-

-

-

-

... More
1.Rate to include cost of all labour, tools, tackles, equipment, hire charges, supply of all materials, providing and fixing reinforcement steel, shuttering, earthwork in excavation and backfilling using serviceable earth in all conditions, preparation of base, etc. with all bye works and sundry works. Cost of works towards pipe supports & sleepers being raised from pavement is covered under respective RCC items.

-

-

-

... More
2. To be read in conjunction with Particular Job Specification.

-

-

-

... More
VALVE PIT

-

-

-

... More
Construction and handing over of RCC Valve Pit of approx. 1.8m x 1.8 m in size (internal dimension) as per technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per Sketch attached with the tender.

5

-

-

... More
Construction and handing over of RCC Valve Pit of approx. 2.0m x 2.0 m in size (internal dimension) as per technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per Sketch attached with the tender.

2

-

-

... More
Construction and handing over of RCC Valve Pit of approx. 2.5m x 2.5 m in size (internal dimension) as per technical specification and direction of engineer-in-charge complete in all respect. Scope of work shall be as per Sketch attached with the tender.

2

-

-

... More
STEEL STRUCTURAL WORKS

-

-

-

... More
Steel structure Fabrication

-

-

-

... More
Supplying, Fabricating & Erecting in position steel structures fabricated out of MS Girders, channels, Tees, angle, flats, plate, square hollow sections pipes etc. conforming to IS:2062 and/or from pipes conforming to IS:1161 for structural purpose for cascade supporting structure, loading/unloading platform, Gratings for platform, catladder,handrails, hoardings for sinages,Lcv stand, etc. of any size/dia for required design including cutting, welding, bolting, hoisting, fixing in position, including application of one coat of primer at shop and second coat of primer at site after erection and two coats of finishing paint at site .The work is to be completed in all respect as per specification ,scope of work, detailed construction drawings and directions of the Engineer-in-charge.

1000

-

-

... More
[ Rate to include cost of all labour, nut, bolts, tools, tackles, hire charges royalties, levies, transportation, scrap value, gas cutting, welding, other consumables, paints, compressed air, water, electric power etc. all complete.]

-

-

-

... More
Providing and fixing Fencing Structure

-

-

-

... More
Supplying, fabricating & fixing steel structural fencing fabricated from pipes conforming to IS:1161 and plates conforming to IS:2062 & fixing of GI weldmesh made from 3mm GI wire @ 75 mm bothways to structural steel frame by means of welding/bolting, including applying two coats of approved quality of synthetic enamel paint over a priming coat of in approved shade including supply of all raw materials, bolts, electrodes, transportation, including making pokets & pouring with PCC (1:2:4) in of block 500x500x500 for fixing of posts etc complete as per enclosed drawing, technical specifications,scope of works and directions of the Engineer-In-Charge.

-

-

-

... More
Fencing height 2.1m

200

-

-

... More
Notes:

-

-

-

... More
The quantities indicated are estimated values and hence are approximate. Final payment will be made based on actual quantities to be certified by the Purchaser.

-

-

-

... More
The cost of MS bolts (permanent and service), washers, electrodes, putty, gases, cost of straightening the raw materials, cutting of flats from plates and providing splices, paints, tools, plants, etc., as required for the work shall be deemed to be included in the quoted rates.

-

-

-

... More
All handling and transport charges of raw materials and fabricated structures including double handling, as required, for completion of work in accordance with

-

-

-

... More
Time schedule, are deemed be included in the quoted rates

-

-

-

... More
All accessories like MS tower bolts, MS Pivot, MS Wheels, MS Tee section, locking arrangement etc. shall be measured by weight only.

-

-

-

... More
Contractor shall ensure proper alignment and smooth operation of Gate

-

-

-

... More
GROUND PENETRATING RADAR

-

-

-

... More
Carrying out subsurface utility survey along the proposed pipeline route and/ or as specified by Engineer-In-Charge for 10 m corridor using Ground Penetrating Radar (GPR) for depth upto 8 m below the existing ground level to locate and identify all existing underground utilities/buried objects including but not limited to pipelines, sewers, conduits, cables, drains, manholes, appurtenances etc in the proposed corridor along with location, DGPS coordinates, depth, shape and dimensional details of utilities. Four (4) Copies of Report and Drawings incorporating all collected datas shall be submitted as per scope of work and direction of the Engineer-in-charge. Scale of Drawing shall be Planimetry (X Axis 1:1000, Y Axis 1:100), Longitudinal Section (Z Axis 1:100) and Transverse Section at critical location.

10000

-

-

... More
Hiring of Trailer/Truck (25-30 MT capacity) for transporting of any materials within the city as per instruction of EIC

50

-

-

... More
Hiring of Hydra/Crane (12 MT-16 MT capacity)including fuel,required manpower ,lifting tools etc. for Loading & unloading of any materials within the city as per instruction of EIC

50

-

-

... More
Transportation including loading, unloading & handling of any materials from different GAs other than all materials mentioned above as per instruction of EIC by suitable trailer/truck(25-30 MT capacity)

5000

-

-

... More
Supply, transportation, Fabrication, Blasting, Painting , Stencilling etc.complete as per standard drawing for Hard Barricading and satisfaction of EIC.

200

-

-

... More
Note :-

-

-

-

... More
1.Survey Agency for execution of GPR Survey Work to be engaged by the Contractor shall be submitted for approval of GAIL/B&R prior to start of work.

-

-

-

... More
2. GPR Work shall be carried in presence of Contractor's Representative.

-

-

-

... More
Total amount excluding GST

-

-

-

... More
GST (CGST&SGST/UTGST or IGST) in percentage (%) on Net Total Amount

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements

Past Bidders
This list is curated from the bidders of the similar tenders in the past

Unlock the Tender details for free
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
  • Bidder NameThis Information is for unsubscribed user This Information is for unsubscribed user
  • Awarded Ratexx%
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.