Eastern Coalfields Limited Tender

Search from across the categories, cities, and authorities to find the latest Jharkhand tenders. Every Jharkhand tender is curated from credible sources of government websites (eProcurement Jharkhand portal) and newspapers, thus ensuring the credibility of the information presented to you. For more information on Jharkhand tender bidder registration, the login process and more read the FAQs section on this page.

Eastern Coalfields Limited - ECL Tender

Works
Civil And Construction
Building Construction
Water Storage And Supply
Eprocure
Opening Date11 Jul 2024
Closing Date22 Jul 2024
Tender Amount₹ 6,72,077 
Notes
Download

Costs

Description

Unlock the Tender details for free
Scription for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user this is tender description for unregistered user

Contact

Unlock the Tender details for free
GEM & Bid Advisory Services
Get portal registration, tender bidding, product/service listing or vendor/MSME certification services at a nominal cost

BOQ Items

... More
DO_NOT_SHOW

-

-

-

View all details for FREE
... More
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)

2.66

16006

6007.2

... More
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level :1:1.5:3 (1 cement : 1.5 coarse sand (zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size de rived from natural sources)

10.71

73940

6903.9

... More
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fllets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement:1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources : 3 graded stone aggregate 20 mm nominal size derived from natural sources)

8.91

71553

8030.65

... More
Reinforced cement concrete work in beams, suspended foors, roofs having slope up to 15* landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to foor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) derived from natural sources: 3 graded stone aggregate 20 mm nominal size derived from natural sources).

3.33

28044

8420.4

... More
Centering and shuttering including strutting, propping etc. and removal of form forFoundations, footings, bases of columns, etc. for mass concrete.

57.9

15592

269.3

... More
Centering and shuttering including strutting, propping etc. and removal of form forColumns, Pillars, Piers, Abutments, Posts and Struts

60

38682

644.7

... More
Centering and shuttering including strutting, propping etc. and removal of form forSuspended floors, roofs, landings, balconies and access platform

26.65

16439

617

... More
Centering and shuttering including strutting, propping etc. and removal of form forLintels, beams, plinth beams, girders, bressumers and cantilevers

21.9

10819

494.05

... More
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars of grade Fe- 500D or more.

2295.06

174355

75.97

... More
Providing and fixing Chlorinated Polyvinyl Chloride (CPVC) pipes, having thermal stability for hot & cold water supply including all CPVC plain & brass threaded fittings This includes jointing of pipes & fittings with one step CPVC solvent cement, trenching, refilling & testing of joints complete as per direction of Engineer in Charge. External work 40 mm nominal dia Pipes

200

93550

467.75

... More
Providing and fixing gun metal gate valve with C.I. wheel of approved quality (screwed end) :40 mm nominal bore

10

6121

612.15

... More
Providing and fixing uplasticised PVC connection pipe with brass unions : 30 cm length 20mm nominal bore

30

2071

69.05

... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conformingto ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239(Part -I) Socket 40mm dia

30

1260

42

... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conformingto ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239(Part -I) Elbow 40mm dia

30

2070

69

... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conformingto ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239(Part -I) Tee 40mm dia

10

990

99

... More
Supply of PVC pipes & fittings Schedule 80 (medium duty) conformingto ASTMD - 1785 and threaded to match with GI Pipes as per IS : 1239(Part -I) Nipple 100mm long 40mm dia

10

400

40

... More
Total impact of GST for the purpose of CTC

1

-

-



Evaluation Notes How It Works ?

Potential Partner

Select Your Requirements
Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.