Get tender documents at just ₹200 per tenderKnow More
Search made simple for latest tendersNo hidden charges. No keyword restrictionsExplore Our Plansor Pay Per Tender

East Central Railway

Dhanbad, Jharkhand

  • Opening Date

    06 Aug 2019

  • Closing Date

    28 Aug 2019

  • Tender Amount

    ₹ 11,06,127

  • EMD

    ₹ 22,100

Are you Looking for Joint Venture Partners, Contractor Consortium, Back-to-Back Contractor, Project Financier?
We will help you to find the right match for FREE.
Summary

(balance Work)repairs And Changing Of Damaged Angle, Plate, Slab Etc At Ptru Fob Under aden/brka.

Don't have sufficient eligibility, BG funds or resources?
We will help you to find the right match for FREE.
BOQ Items

No BOQs Available

DRM/Engineering acting for and on behalf of The President of India invites E-Tenders against Tender No 249-DHN-2019-20 Closing Date/Time 28/08/2019 17:00 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not allowed against this tender, and any such manual offer received shall be ignored. Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker cheque, Deposit receipts, FDR etc. are not allowed. 1. NIT HEADER Name of Work (Balance work)Repairs and Changing of damaged angle, plate, slab etc at PTRU FOB under ADEN/BRKA. Bidding type Normal Tender Tender Type Open Bidding System Single Packet System Tender Closing Date Time 28/08/2019 17:00 Date Time Of Uploading Tender 06/08/2019 16:35 Pre-Bid Required No Pre-Bid Query Date Time Not Applicable Advertised Value 1106127.41 Tendering Section SR.DEN3 Bidding Style [ Decision at Schedule level ] Bidding Unit Earnest Money (Rs.) 22100.00 Validity of Offer ( Days) 30 Tender Doc. Cost (Rs.) 2000.00 Period of Completion 4 Months Contract Type Works Contract Category Expenditure Bidding Start Date 14/08/2019 Are Joint Venture (JV) firms allowed to bid No Ranking Order For Bids Lowest to Highest Expenditure Type Revenue 2. SCHEDULE S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule BI-(General) 990988.15 Above/ Below/Par 1 Please see Item Breakup for details. 867385.69 14.25 990988.15 Item Description:- For Chapter 02,03,04,08,09,10, 12 & 18 USSOR-2012 of ECR S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule CI-(Cement) 48479.39 Above/ Below/Par 1 Please see Item Breakup for details. 43526.12 11.38 48479.39 Item Description:- For Chapter 03 USSOR-2012 of ECR S.No. Item Code Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding Unit Schedule CII-(Reinforcement) 66659.87 Above/ Below/Par 1 Please see Item Breakup for details. 60721.32 9.78 66659.87 Item Description:- For Chapter 04 USSOR-2012 of ECR 3. ITEM BREAKUP Schedule Schedule BI-(General) Item- 1 For Chapter 02,03,04,08,09,10, 12 & 18 USSOR-2012 of ECR S No. Item No Description of Item Unit Qty Rate Amount 1 021070 Loading/Unloading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, block kankar, pitching stones , rubble stones, laterite, coal, surkhi, dry mortar, sand , moorum, earth, manure or sludge, ashes, lime etc., including lead up to 50m and stacking into/from trucks, trailors or wagons cum 26.00 38.66 1005.16 Page 1 of 4 Run Date/Time: 06/08/2019 16:36:11 DHANBAD DIVISION-ENGINEERING/EAST CENTRAL RLY TENDER DOCUMENT Tender No: 249-DHN-2019-20 Closing Date/Time: 28/08/2019 17:00 2 021090 Leading ballast, kankar, brickbats, stone-chips, shingle, stone boulders, block kankar, pitching stones, rubble stones, laterite, coal, surkhi, dry mortar, sand, moorum, earth, manure or sludge, ashes, lime, debris, muck, malba, etc. for lead upto 25 km. Note : Lead under this item is payable when the same exceeds 500m. cum 13.00 88.58 1151.54 Providing and laying cement concrete, up to plinth in retaining walls, walls (any thickness) including attached plasters, columns, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets etc, excluding the cost of cement and of shuttering, centering. 3 031023 1:2:4 (1 cement : 2 sand : 4 graded stone aggregate 20mm nominal size) cum 2.00 2911.03 5822.06 Providing, hoisting and fixing in position upto floor two level M20 Grade precast RCC work including setting in cement mortar 1:3 (1 cement : 3 coarse sand) and finishing smooth with 6mm thick cement plaster 1:3 (1 cement : 3 fine sand) on exposed surfaces complete including cost of centering, shuttering, f

Disclaimer: BidAssist has made every reasonable effort to ensure that the information is accurate and authentic however it cannot be held liable for any third-party claims or losses of any damages. BidAssist makes no warranty, expressed or implied, as to the results obtained from the use of the information. If you think you may have noticed any error or omission, please let us know by contacting contact@bidassist.com.